Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Fixing the bounce
Fast at the threshold, normal flare, and the runway seems to refuse the aircraft. The instinctive fix - pushing it on - causes the next one. A fast aircraft forced onto the runway touches nosewheel-first or nearly so. The tell is a touchdown that feels soft followed by a bounce that steepens. Pilots fix the bounce recovery; the cause was the 10 knots at the threshold.
Read more in VRef ExplainedStart to finish · 16 stages, 14 in the score
Events
Events
Events
Events
Events
Taxi out
The roll
Liftoff and climb
Plan view the roll down the 6,981 ft runway.
Rolled from 339 ft in, drifted left of the centreline, 14 ft at the widest, and lifted off 14 ft left. Airborne 25 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length.
Side view from the start of the roll to 203 ft.
Reached 35 ft with 3,770 ft of runway left; then climbing at 430 fpm on average to 203 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The figure at liftoff is the pitch then. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
At the 1,000 ft gate: centreline more than 1° off.
When the approach was stable
Every check met from 1.9 nm, about 450 ft above the runway, to the threshold, after the 1,000 ft gate and before the 500 ft gate. The last to settle was the speed.
Each line is one of the gate checks, run along the whole final rather than only at the gates: green where it would have passed, amber where it would not. The glideslope, centreline and speed lines use the bands in the charts beside this card. The sink rate is allowed what the glideslope needs at your ground speed plus 600 fpm, the wings 10° of bank, and the gear and flap are read from when you moved the levers. The bottom line is green where every check held at once, ignoring blips shorter than 0.2 nm, and the sentence above it says from where it held to the threshold. A ring is a stabilisation gate, where the checks in the table were taken.
The final from 4 nm, with the stabilisation gates on it.
Profile height against the 3° glideslope, with its 2° band in green.
Inside the glideslope band from 3.4 nm, where the final began, to the threshold, never more than 300 ft below the slope.
Your height above the runway against the distance still to go. The glideslope is the steady descent path to the aiming point, 1,000 ft past the threshold: 3° here, which is about 320 ft for every nautical mile out, crossing the threshold at about 50 ft. The row under the distances is the height it puts you at. Inside the green band your path is drawn green; outside it, amber. A ring is a stabilisation gate: green when every check there passed, amber with the failed checks named beside it.
Plan distance off the extended centreline, your left at the top, with the 1° band. Sideways distances are drawn 3× larger than distances along the final.
Joined 1,820 ft left of the centreline at 3.4 nm, then inside the band from 3.1 nm to the threshold.
Looking down from above, flying left to right towards the runway: up the page is left of the centreline, down is right. Sideways distances are stretched so that small drifts show, so a line that looks wild here may be only a few tens of feet. The labels are how far off you were at each distance, amber when outside the band.
Speed against the approach speed. The green band runs from 5 kt slow to 34 kt fast at the 1,000 ft gate, closing to 20 at 500 ft and 10 at the threshold.
Inside the speed band from 3.4 nm, where the final began, to 2.1 nm, then slow to 1.9 nm (up to −7 kt), then inside the band to the threshold.
Your indicated airspeed down the final, against the approach speed for this aircraft at its landing weight. The band allows 5 kt slow and more on the fast side further out, closing as you get lower, because the speed is expected to come off on the way down. The figures are knots above (+) or below (−) the approach speed.
Over the threshold
The flare strayed well off the target profile
The flare took the sink out 8 ft agl above the runway and the aircraft flew down from there. Touchdown was 532 ft past the threshold. Let it come lower before checking the descent - holding off high uses runway and leaves the touchdown to chance.
Touchdown
Rollout
Taxi in
Side view — the last 5,000 ft of the approach.
Crossed the threshold at 28 ft, 22 ft below the 50 ft target; began the flare at 26 ft. Touched down 532 ft in, 468 ft short of the ideal 1,000 ft.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 5,000 ft across. The dashed line is the ideal, 50 ft over the threshold and down 1,000 ft in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
The sink went from 370 fpm at the flare to 270 fpm at touchdown. The pitch barely changed. Into the flare at 61 kt, 7 kt under the 68 kt approach speed, and 55 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the first 5,000 ft of the 10,157 ft runway, to the same scale as the side view.
Touched down on the centreline, and stayed within 7 ft of it down the rollout. Little crosswind (1 kt): nothing to correct for. Touched down with the nose 1° left of the track, wings level.
Wind 010° at 2 kt · 1 kt head · 1 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
The 532 ft touchdown sits inside the full-score zone. The 1.14 G arrival bounced 2 times.
The rest of the report
The Piper PA-24 Comanche taxied from the parking area to runway 16 at Cork Airport (EICK) in 4 minutes, covering approximately 1 nm on the ground.
Departure roll commenced on runway 16 at EICK, with a takeoff run of 1,819 ft (26 % of the runway) and liftoff achieved at 73 kt. Ambient conditions were 58 °F with a 3-kt wind from 160°, providing a 3-kt headwind and no crosswind.
Climb began overhead the departure airport, raising the aircraft from 685 ft asl to 934 ft asl, an altitude gain of 249 ft in 1 minute while covering 1 nm.
A level cruise segment followed overhead Ballygarvan, lasting 2 minutes and extending for 2 nm.
A second climb started 2 mi south of Ballygarvan, increasing altitude from 970 ft asl to 3,431 ft asl, a gain of 2,461 ft in 5 minutes and covering 7 nm.
The aircraft then entered a prolonged cruise 4 mi south of Fountainstown, maintaining level flight for 97 minutes and traversing 251 nm.
Descent commenced overhead Coat-Meal in Bretagne, France, descending from 3,183 ft asl to 745 ft asl, a loss of 2,438 ft in 3 minutes while covering 7 nm.
Final approach to runway 07R at Brest Bretagne Airport (LFRB) involved a descent from 632 ft agl to -139 ft agl over 157 seconds, with the aircraft scoring on the stabilisation gates.
Landing on runway 07R was executed on a 10,157-ft runway; the threshold speed was recorded at 61 kt, touchdown occurred 529 ft down the runway at 55 kt, and the vertical speed at touchdown was minus 273 fpm. Runway touchdown alignment was perfect, and local weather reported 57 °F with a 2-kt wind from 9°, giving a 1-kt headwind and 1-kt crosswind. The total landing roll measured 1,789 ft, representing 18 % of the runway length.
Runway rollout alignment remained perfect throughout the deceleration phase.
The aircraft taxied from the runway to the parking area in 2 minutes, covering less than 1 nm on the taxiway.
In total, the flight covered 274 nm, required 119 minutes of elapsed time, and consumed 167 lb of fuel.
Scroll or drag the slider to zoom · double-click to reset · hover for values