Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Apply small rudder corrections against a point at the far end of the runway to track the centreline during the roll.
What happened: The aircraft drifted 11 m off the runway centreline during the ground roll, and a wide centreline deviation like this usually carries into the early climb as excess bank, which showed up here as 7.5° of bank in the second climb stage.
Watch for: Heading indicator: wings level with bank held near zero through the climb
Arrival
Reduce power earlier on final to bring threshold speed back to 99 kt.
What happened: You crossed the threshold at 118 kt against a target of 99 kt, and touchdown ended up well past the normal point. Carrying excess threshold speed usually carries the touchdown long as the aircraft floats before settling.
Watch for: Airspeed indicator, targeting 99 kt at the threshold.
Ground effect becomes significant below about one wingspan of height. A Cessna 172, with a 36 ft span, enters ground effect at flare height - the float it feels in the hold-off is ground effect arriving on cue. An A320, with a span around 117 ft, has been in ground effect since before the threshold and there is no sudden cushion to feel, only a gradual reduction in induced drag that lengthens any float you allow.
Read more in Flare TimingStart to finish · 17 stages, 15 in the score
Events
Events
Events
Events
Events
Events
Events
Taxi out
The roll
The nose wandered in the climb
From 35 ft to the end of the climb the nose moved between 3.7° and 19.1°, and the speed between 123 kt and 159 kt.
Once clear of the runway the nose moved through a wide range, and the speed moved with it. Set the climb attitude, hold it and trim, and give the speed a few seconds to settle before correcting it with a degree or two of pitch. Chasing the airspeed with large pitch changes makes it wander more.
Liftoff and climb
Plan view the roll down the 2,590 m runway.
Rolled from 60 m in, drifted right of the centreline, 10 m at the widest, and lifted off 10 m right. Airborne 22 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length.
Side view from the start of the roll to the end of Climb 3 at 888 ft.
Reached 35 ft with 1,789 m of runway left; gear up at 50 ft, inside the 400 ft that gets full marks; then climbing at 1,830 fpm on average to 888 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The dark stretch of the roll is the run with the nose up and the wheels still on, with its length and time under the runway. The gear-up ring is coloured by its mark. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The dashed green line is the speed to rotate at for this aircraft at its weight, and the green dot is where the nose started to come up. The grey band is the run between the nose coming up and the wheels leaving the runway. The figures at liftoff are the pitch then and how fast the nose came up, in degrees a second. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
Over the threshold
The flare wandered off the target profile
The flare began at 71 ft agl above the runway, higher than this aircraft wants. Touchdown was 1,063 m past the threshold. Hold the aim point and let the runway come to you rather than anticipating the flare.
Touchdown
Rollout
Taxi in
Side view — the last 1,524 m of the approach.
Began the flare high, at 71 ft, 78 m before the threshold; crossed the threshold at 46 ft, close to the 50 ft target; ballooned 9 ft from 12 ft. Touched down 1,063 m in, 758 m past the ideal 305 m.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 1,524 m across. The dashed line is the ideal, 50 ft over the threshold and down 305 m in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
From the flare the descent stopped and turned into a climb of 190 fpm before coming down at 190 fpm to touch. The nose came up 4.9° on the way down. Into the flare at 119 kt, 20 kt over the 99 kt approach speed, and 92 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the full 1,524 m runway, to the same scale as the side view.
Touched down 168 m right of the centreline, and steered back to 7.6 m right by the end of the rollout. 3 kt across from the right, which takes about 2° of crab to hold the centreline at 92 kt. Touched down straight - the crab taken out before the wheels touched, 6.3° of bank.
Wind 123° at 5 kt · 4 kt tail · 3 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
Touched down 1,063 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Scroll or drag the slider to zoom · double-click to reset · hover for values