Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Check your taxi lights
Don't forget to turn on the taxi lights at the start of the taxi stage and switch to landing lights as soon as you enter the runway.
Start to finish · 21 stages, 20 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,971 m runway, to the same scale as the side view.
The 355 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, the aircraft landing had some successes and areas for improvement. The Approach Phase had some challenges with the descent path but did well with heading alignment and speed. The Landing Phase was strong with a good threshold height and excellent landing flare. The Touchdown Phase had a good touchdown rate and distance, but speed was slightly above target and runway alignment was off. The Rollout Phase also had runway alignment issues.
To improve future landings, I recommend focusing on maintaining a consistent descent path and speed, refining runway alignment throughout all phases of the landing, and ensuring proper speed control for a smoother touchdown. Continuous practice and communication with air traffic control can also help in achieving a successful landing. Overall, with some adjustments and practice, the next landing can be even better. Keep up the good work!
Scroll or drag the slider to zoom · double-click to reset · hover for values