Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the takeoff
See Departure Roll
The rudder input is a changing profile through the roll rather than one that is held. So the demand on your right foot starts large at power application, eases as speed builds and the rudder gains authority, then jumps again at rotation.
Read more in Improve Your Take-OffsStart to finish · 12 stages, 11 in the score
Events
Events
Events
Events
Events
Events
Taxi out
The roll
Rotated late
Rotation started at 127 kt, 7 kt after the 120 kt rotate speed.
The pull started after the rotate speed had gone by. Bring the airspeed into the scan as it approaches the rotate speed, so the pull starts on the number rather than when you notice it has passed.
Liftoff and climb
Plan view the roll down the 3,349 m runway.
Rolled from 278 m in, drifted right of the centreline, 1.6 m at the widest, and lifted off 1.3 m right. Airborne 33 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way.
Side view from the start of the roll to the end of Climb 3 at 976 ft.
Reached 35 ft with 2,013 m of runway left; gear up at 188 ft, inside the 400 ft that gets full marks; then climbing at 1,050 fpm on average to 976 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The dark stretch of the roll is the run with the nose up and the wheels still on, with its length and time under the runway. The gear-up ring is coloured by its mark. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The dashed green line is the speed to rotate at for this aircraft at its weight, and the green dot is where the nose started to come up. The grey band is the run between the nose coming up and the wheels leaving the runway. The figures at liftoff are the pitch then and how fast the nose came up, in degrees a second. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
At the 500 ft gate: sink rate more than 600 fpm beyond what the glideslope needed, glideslope more than 1° off the runway's 3° and centreline more than 1° off.
The approach, gate by gate
The rest of the report
Scroll or drag the slider to zoom · double-click to reset · hover for values