Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 13 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Make small rudder corrections against a fixed point at the far end of the runway to stop the drift as soon as it starts in the flare.
What happened: On the landing you drifted 8 m off the centreline, and that kind of lateral drift usually carries through to a touchdown point 8.2 m off centreline and into a rollout that is still skewed off the runway centreline.
Watch for: Heading indicator: track straight down the extended runway centreline through touchdown and rollout.
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 17 stages, 15 scored
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,994 m runway, to the same scale as the side view.
The 386 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Boeing 787-9 taxied from the parking area to runway 20C at Singapore Changi Airport (WSSS) in 5 minutes, covering a distance of 2 nm.
During the departure roll on runway 20C, the aircraft accelerated to a liftoff speed of 154 kt and became airborne after traveling 1,378 m, which represented 34 % of the runway length; ambient temperature was 35 °C with a wind of 6 kt from 120°, a cross-wind component of 6 kt and a head-wind component of 1 kt.
The initial climb commenced 1 mile west of WSAC Changi Air Base (East) in Singapore, climbing from 929 ft asl to 5,991 ft asl - an increase of 5,062 ft - in 2 minutes while covering 10 nm.
A level cruise segment began 3 miles west of Batam, lasting 3 minutes and extending over 15 nm.
A second climb started 7 miles south of WIDD Hang Nadim International Airport, Batam, where the aircraft rose from 6,009 ft asl to 36,989 ft asl, gaining 30,980 ft in 15 minutes and traversing 107 nm.
The subsequent cruise phase originated 63 miles north-east of WIDS Dabo Airport and continued for 58 minutes, during which the aircraft covered 471 nm.
Descent began 74 miles north-east of WAHU Dewadaru Airport, descending from 37,007 ft asl to 1,302 ft asl - a loss of 35,706 ft - in 30 minutes while traveling 160 nm.
For the final approach to runway 10 at Juanda International Airport (WARR), the aircraft approached from the west on a heading of 99.0° at 4 nm and 1,284 ft agl.
Touchdown occurred on runway 10, whose length is 2,993 m; the threshold speed was 143 kt, touchdown distance was 388 m, touchdown speed was 135 kt, and the vertical speed at touchdown was minus 230 fpm. The aircraft landed with a misalignment of 9.4 m from the centreline; local weather reported a temperature of 27 °C, wind 6 kt from 120°, a cross-wind component of 2 kt and a head-wind component of 5 kt. Total landing distance measured 1,239 m, representing 41 % of the runway.
Runway rollout alignment was noted as slightly off centreline by 9.3 m.
The aircraft taxied from the runway to the parking area in 9 minutes, covering an additional 2 nm.
Overall, the flight covered 773 nm, required 124 minutes of flight time, and consumed 10,474 kg of fuel.
The Boeing 787-9 approached runway 10 at Juanda International Airport from the west on a heading of 99.0° at 4 nm and 1,284 ft agl, and the final approach was assessed as stabilised at the 1,000 ft gate with gear, flaps, sink rate, glideslope and centreline all within limits.
During the threshold and flare phase the runway length of 2,993 m provided a good threshold height, the threshold speed was good at 143 kt and the touchdown distance was good at 388 m.
Touchdown occurred at a speed of 135 kt, which was good, with a touchdown rate rated fair at minus 230 fpm and the touchdown point misaligned by 9.4 m from the centreline.
The rollout covered a total landing distance of 1,239 m, representing 41 % of the runway, and the runway rollout alignment was slightly misaligned by 9.3 m from the centreline.
To convert the high overall score of 95.3 % into an even tighter performance, focus on centreline tracking to reduce the lateral deviation observed at touchdown and during rollout.
Scroll or drag the slider to zoom · double-click to reset · hover for values