MY FS FLIGHTS
Flight Score
Improve the touchdown
There are several things that can go wrong during the flare, carrying too much speed over the threshold, starting the flare at the wrong height and inconsistent flight control inputs, all contribute to a poor flare resulting in a hard touchdown or a float down the runway.
Read more in Flare TimingStart to finish · 20 stages, 18 scored
Events
Events
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with five checks, where the approach path is 1,000 ft and 500 ft above the runway.
At the 1,000 ft gate: sink rate above what the glideslope needed and off the centreline.
At the 500 ft gate: off the centreline.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,093 m runway, to the same scale as the side view.
The 403 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Airbus A320 taxied from the parking area to runway 36 at Chiang Mai International Airport, covering approximately 1 nm in 4 minutes.
During the departure roll on runway 36, the aircraft accelerated to a liftoff speed of 156 kt and left the ground after traveling 1,620 m, which represented 48 % of the runway length. Ambient conditions were 28 °C with calm wind reported as 0 kt from 240°, resulting in zero cross-wind and head-wind components.
The initial climb commenced about 1 mile west of Chiang Mai, where the airplane rose from 2,017 ft asl to 11,051 ft asl, an altitude gain of 9,035 ft achieved in 4 minutes while covering 17 nm.
A short level segment followed, beginning 3 miles north of VTSI San Sai Airport; this cruise segment lasted 2 minutes and spanned 8 nm.
A second climb began roughly 3 miles north-west of San Kamphaeng, during which the aircraft ascended from 11,087 ft asl to 38,870 ft asl, gaining 27,783 ft in 23 minutes and traversing 162 nm.
The subsequent cruise phase started about 13 miles north-west of Sainyabuli, lasting 83 minutes and covering 609 nm.
Descent operations were initiated 30 miles west of Yunfu, with the airplane descending from 38,996 ft asl to 1,464 ft asl, a loss of 37,532 ft over 22 minutes while traveling 123 nm.
For the final approach to runway 02R at Guangzhou Baiyun International Airport, the aircraft approached from the south on a heading of 15.0°, positioned 4 nm out and 1,398 ft above ground level. Weather at the time was 33 °C with a wind of 5 kt from 80°, providing a 5 kt cross-wind and a 2 kt head-wind component.
Touchdown occurred before the runway threshold at a speed of 127 kt. The vertical speed at touchdown was minus 254 fpm, and the touchdown point was laterally displaced 397.1 m from the centreline. The total landing distance recorded was 597 m, representing 19 % of the runway length.
During rollout, the aircraft remained laterally misaligned, with a measured deviation of 397.2 m from the centreline.
After landing, the Airbus A320 taxied from the runway to the parking area in 3 minutes, covering less than 1 nm.
In total, the flight covered 928 nm, required 144 minutes of airborne time, and consumed 4,677 kg of fuel.
The Airbus A320 entered the final approach to runway 02R at ZGGG Guangzhou Baiyun International Airport from the south on a heading of 15.0 ° at 4 nm and 1,398 ft agl. The approach was assessed as unstable at the 1,000 ft gate, with a sink rate too high and the aircraft off the centreline. Ambient temperature was 33 °C, wind 5 kt from 080°, providing a 5 kt crosswind component and a 2 kt headwind.
Touchdown occurred before the threshold with a speed of 127 kt, which the data rates as good, and a vertical rate of minus 254 fpm, rated as fair. The touchdown point was excessively misaligned, being 397.1 m from the runway centreline, and the aircraft used a total landing distance of 597 m, representing 19 % of the runway length.
During rollout the aircraft remained excessively misaligned, deviating 397.2 m from the centreline.
To improve future performance, focus on maintaining centreline alignment throughout the approach and touchdown phases to reduce the large lateral deviation, and ensure a stabilized approach by controlling sink rate and lateral position before the 1,000 ft gate. These adjustments will help raise the overall landing score beyond the current 71.7 %.
Scroll or drag the slider to zoom · double-click to reset · hover for values