Track the centreline through touchdown using small rudder corrections against a point at the far end of the runway.
What happened: The aircraft touched down off the centreline at 8.9 m, and drifting off centreline at touchdown usually carries through into the rollout, as it did here with alignment reaching 9.2 m.
Watch for: Watch runway centreline position, keeping deviation inside the limit through touchdown and rollout.
The rudder input is a changing profile through the roll rather than one that is held. So the demand on your right foot starts large at power application, eases as speed builds and the rudder gains authority, then jumps again at rotation.
Read more in Improve Your Take-OffsStart to finish · 15 stages, 13 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,861 m runway, to the same scale as the side view.
The 377 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Airbus A320 taxied from the parking area to runway 24L at CYUL Montreal / Pierre Elliott Trudeau International Airport in 7 minutes, covering a distance of 3 nm.
During the departure roll on runway 24L, the aircraft used a takeoff distance of 2,040 m, representing 70 % of the runway, and achieved liftoff at 160 kt. Ambient conditions were 16 °C with a wind of 3 kt from 29°, a crosswind component of 1 kt and a tailwind component of 3 kt.
Climb commenced overhead Dorval, Quebec, with the flight ascending from 1,183 ft asl to 36,620 ft asl, an increase of 35,436 ft achieved in 20 minutes while covering 152 nm.
Level cruise began 8 miles south of Jackman, Maine, and continued for 293 minutes, during which the aircraft traversed 2,472 nm.
Descent was initiated 1 mile south of Annalong, Northern Ireland, with the aircraft descending from 37,350 ft asl to 1,321 ft asl, a loss of 36,029 ft in 21 minutes over a distance of 124 nm.
The final approach to runway 28 at EGNH Blackpool International Airport was conducted from the east, on a heading of 275.0° at 4 nm and 1,278 ft agl.
Landing on runway 28, which is 1,861 m long, occurred with a threshold height of 63 ft agl above target and a threshold speed of 132 kt. Touchdown was recorded at 376 m from the threshold, at a speed of 129 kt, with a firm touchdown rate of minus 308 fpm. The touchdown point was laterally offset by 8.6 m from the centreline. Weather at the time was 20 °C with a wind of 15 kt from 340°, a crosswind component of 14 kt and a headwind component of 6 kt.
The total landing distance measured 1,062 m, representing 57 % of the runway, and the rollout was laterally misaligned by 9.2 m from the centreline.
After exiting the runway, the aircraft taxied to the parking area in less than 1 minute, covering less than 1 nm.
In summary, the flight covered a total distance of 2,758 nm, took 344 (units as provided), and consumed 12,437 kg of fuel.
The Boeing 777-300 approached runway 19R at ESSA Stockholm-Arlanda from the north on a heading of 190.0° at 4 NM and 1,300 ft agl. At the 1,000 ft gate the approach was assessed as stabilised, with gear, flaps, sink rate, glideslope and centreline all within limits.
Threshold speed was recorded as good at 141 kt and the threshold height was satisfactory, indicating the aircraft was correctly configured for the flare.
Touchdown occurred 89 m beyond the touchdown zone with a speed of 130 kt, which was judged good. The touchdown rate was firm at minus 346 fpm and the runway touchdown position was misaligned by 10.9 m from the centreline.
The aircraft rolled out over a total landing distance of 1,490 m, representing 45 % of the 3,283 m runway, and the rollout alignment remained slightly misaligned by 10.9 m from the centreline.
Minor refinements to lateral control on final and at touchdown would reduce the 10.9 m centreline offset observed in both touchdown and rollout. Maintaining a more precise centreline track will help keep the rollout alignment within tighter tolerances while preserving the overall good score of 86.8 %.