Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Use small, coordinated rudder and aileron inputs to hold your assigned climb heading as soon as drift begins.
What happened: During the second climb segment, you let the aircraft drift off the assigned heading.
Watch for: Heading indicator: steady on the assigned climb heading
Arrival
Level the wings with coordinated aileron before touchdown, holding the wings level through the flare and roll-out.
What happened: This flight landed with 6° of bank angle, and touchdown came 12 m off the centreline - carrying bank through the flare like this usually carries the touchdown off the centreline.
Watch for: Attitude indicator: wings level through the flare and touchdown.
The rudder input is a changing profile through the roll rather than one that is held. So the demand on your right foot starts large at power application, eases as speed builds and the rudder gains authority, then jumps again at rotation.
Read more in Improve Your Take-OffsStart to finish · 13 stages, 12 in the score
Events
Events
Events
Events
Events
Events
Events
Taxi out
The roll
Rotated late
Rotation started at 68 kt, 8 kt after the 60 kt rotate speed.
The pull started after the rotate speed had gone by. Bring the airspeed into the scan as it approaches the rotate speed, so the pull starts on the number rather than when you notice it has passed.
Liftoff and climb
Plan view the roll down the 2,013 m runway.
Rolled from 113 m in, drifted 6.7 m left of the centreline and was back on it to lift off, in 11 kn of crosswind from the left. Airborne 25 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way.
Side view from the start of the roll to the end of Climb 3 at 977 ft.
Reached 35 ft with 1,369 m of runway left; gear up at 327 ft, inside the 400 ft that gets full marks; then climbing at 1,140 fpm on average to 977 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The dark stretch of the roll is the run with the nose up and the wheels still on, with its length and time under the runway. The gear-up ring is coloured by its mark. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The dashed green line is the speed to rotate at for this aircraft at its weight, and the green dot is where the nose started to come up. The grey band is the run between the nose coming up and the wheels leaving the runway. The figure at liftoff is the pitch then. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
One stabilised approach gate: five checks where the approach path is 300 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
Still turning onto final at the lower gate, so the centreline and wings level are not asked there - the aeroplane was not lined up yet, and was banked because it was turning. The other checks are marked as usual.
The approach, gate by gate
Over the threshold
The flare mostly held the target profile
The flare was pumped rather than held: pitch changed direction 3 times on the way down. Touchdown was 198 m past the threshold. One smooth continuous input - chasing the runway with the elevator makes the next correction bigger, not smaller.
Touchdown
Side view — the last 1,524 m of the approach.
Crossed the threshold at 47 ft, close to the 50 ft target; began the flare at 34 ft. Touched down 198 m in, 107 m short of the ideal 305 m.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 1,524 m across. The dashed line is the ideal, 50 ft over the threshold and down 305 m in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
The sink went from 460 fpm at the flare to 160 fpm at touchdown. The nose went down 1.3° on the way down. Into the flare at 60 kt, on the 62 kt approach speed, and 54 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the full 1,524 m runway, to the same scale as the side view.
Touched down 12 m left of the centreline. Little crosswind (1 kt): nothing to correct for. Touched down with the nose 3° right of the track, 3.3° of bank.
Wind 114° at 10 kt · 10 kt head · 1 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
The 198 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Scroll or drag the slider to zoom · double-click to reset · hover for values