Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Use smoother, smaller aileron inputs to keep the wings level and hold bank angle near wings-level during the climb.
What happened: During the climb, bank angle rose to 8.6°, more roll than the climb out called for.
Watch for: Attitude indicator: wings level during the climb
Arrival
On final, make small rudder corrections against a point at the far end of the runway to hold the centreline.
What happened: The approach drifted off the centreline, and the aircraft touched down 35 m off the centreline before the rollout continued 32 m off it. Drifting off the centreline on approach usually carries through to touchdown and the rollout in the same direction.
Watch for: Centreline: track it with small rudder corrections, wings level.
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 14 stages, 12 in the score
Events
Events
Events
Events
Events
Taxi out
The roll
The nose wandered in the climb
From 35 ft to the end of the climb the nose moved between 7.1° and 16.0°, and the speed between 132 kt and 154 kt.
Once clear of the runway the nose moved through a wide range, and the speed moved with it. Set the climb attitude, hold it and trim, and give the speed a few seconds to settle before correcting it with a degree or two of pitch. Chasing the airspeed with large pitch changes makes it wander more.
Liftoff and climb
Plan view the roll down the 1,887 m runway.
Rolled from the start of the runway, drifted 16 m left of the centreline and was back on it to lift off. Airborne 39 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way.
Side view from the start of the roll to the end of Climb 3 at 925 ft.
Reached 35 ft with 896 m of runway left; gear up at 108 ft, inside the 400 ft that gets full marks; then climbing at 2,050 fpm on average to 925 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The dark stretch of the roll is the run with the nose up and the wheels still on, with its length and time under the runway. The gear-up ring is coloured by its mark. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The dashed green line is the speed to rotate at for this aircraft at its weight, and the green dot is where the nose started to come up. The grey band is the run between the nose coming up and the wheels leaving the runway. The figures at liftoff are the pitch then and how fast the nose came up, in degrees a second. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
One stabilised approach gate: seven checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 500 ft gate: gear still up, no landing flap set, sink rate more than 600 fpm beyond what the glideslope needed, glideslope more than 1° off the runway's 3°, centreline more than 1° off and speed more than 14 kt above the approach speed of 95 kt.
The approach, gate by gate
Over the threshold
The flare tracked the target profile closely
Crossing the threshold 24 kt above target, the aircraft floated down the runway before touching. Touchdown was 875 m past the threshold. The flare cannot burn off excess energy - fix the approach speed and the float goes with it.
Touchdown
Rollout
Taxi in
Side view — the last 1,524 m of the approach.
Crossed the threshold at 47 ft, close to the 50 ft target; began the flare at 42 ft. Touched down 875 m in, 571 m past the ideal 305 m.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 1,524 m across. The dashed line is the ideal, 50 ft over the threshold and down 305 m in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
The sink went from 490 fpm at the flare to 290 fpm at touchdown. The pitch barely changed. Into the flare at 120 kt, 25 kt over the 95 kt approach speed, and 100 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the full 1,524 m runway, to the same scale as the side view.
Touched down 37 m right of the centreline, and steered back to 7.6 m right by the end of the rollout. 4 kt across from the left, which takes about 2° of crab to hold the centreline at 100 kt. Touched down with 1° of it still on, 2.2° of bank.
Wind 120° at 8 kt · 6 kt tail · 4 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
Touched down 875 m past the threshold — beyond the full-score zone. The 1.74 G arrival bounced 4 times.
The rest of the report
Scroll or drag the slider to zoom · double-click to reset · hover for values