Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 20 stages, 18 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with five checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,012 m runway, to the same scale as the side view.
Touched down 585 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The Airbus A321 taxied from the parking area to runway 14R at SKBO El Dorado International Airport, a movement that lasted 14 minutes and covered 4 nm.
The departure roll commenced on runway 14R. The aircraft accelerated over a takeoff distance of 1,534 m, representing 40 % of the runway, and lifted off at 171 kt. Local weather at the time was temperature 24 °C, wind 7 kt at 109 °, with a crosswind component of 2 kt and a headwind component of 6 kt.
Climb began overhead SKBO, with the airplane climbing from 9,362 ft asl to 36,087 ft asl, an increase of 26,725 ft achieved in 12 minutes while covering 91 nm.
Level cruise was established 3 miles south west of Herveo (Departamento de Tolima, Colombia) and persisted for 67 minutes, during which 511 nm were flown.
Descent commenced 3 miles south west of MPZL Finca 32 Airport La Dalia (Provincia de Bocas del Toro, Panama). The aircraft descended from 35,725 ft asl to 9,983 ft asl, a loss of 25,742 ft in 17 minutes, covering 111 nm.
A brief level cruise followed, beginning 6 miles south west of Santiago (Provincia de San Jose, Costa Rica) and lasting 2 minutes for a distance of 6 nm.
The next descent started 5 miles south east of Orotina (Provincia de Alajuela, Costa Rica), with a reduction from 9,603 ft asl to 4,222 ft asl, a decrease of 5,382 ft in 5 minutes, covering 14 nm.
Final approach to runway 07 at MROC Juan Santamaría International Airport was executed from the south west, on a heading of 69.0 ° at 4 nm and 1,228 ft agl.
The aircraft landed on runway 07, whose length is 3,012 m. The threshold speed was recorded at 122 kt. Touchdown occurred 167 m beyond the touchdown zone with a speed of 118 kt and a touchdown rate of minus 268 fpm. The touchdown point was offset by 17.8 m from the centreline. Weather at MROC was temperature 25 °C, wind 6 kt at 99 °, with a crosswind of 3 kt and a headwind of 5 kt.
The total landing distance measured 1,281 m, representing 43 % of the runway, and the rollout alignment was misaligned by 18.1 m from the centreline.
After landing, the Airbus A321 taxied to the parking area in 2 minutes, covering less than 1 nm.
Overall, the flight covered a distance of 743 nm, required 119 minutes of airborne time, and consumed 3,922 kg of fuel.
The Airbus A321 executed the final approach to runway 07 at MROC Juan Santamaría International Airport from the south-west, maintaining a heading of 69.0° at 4 nm and 1,228 ft agl. Local weather was temperature 25 °C, wind 6 kt at 99°, crosswind 3 kt, headwind 5 kt. The approach was assessed as stabilised at the 1,000 ft gate, with gear, flaps, sink rate, glideslope and centreline all within limits.
Good threshold height was observed and the threshold speed was good at 122 kt.
Touchdown occurred 167 m beyond the touchdown zone with a speed of 118 kt, which was good. The touchdown rate was fair at minus 268 fpm and the runway touchdown position was significantly misaligned by 17.8 m from the centreline.
The total landing distance was 1,281 m, representing 43 % of the 3,012 m runway, and the runway rollout alignment was misaligned by 18.1 m from the centreline.
Refine lateral alignment to keep the touchdown point nearer the centreline, which will also reduce rollout deviation. Maintaining precise centreline tracking through flare and rollout will improve overall performance.
Scroll or drag the slider to zoom · double-click to reset · hover for values