Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Ease the back pressure on the yoke after rotation so the pitch change is smoother and g force stays lower.
What happened: During the initial climb the average g force reached 1.3 g, a high value for that phase.
Watch for: G meter: smooth, steady value in the normal climb band
Arrival
Use small rudder inputs against a point at the far end of the runway to hold the centreline during rollout.
What happened: During the rollout the aircraft drifted 5.8 m off the centreline.
Watch for: Runway centreline marks: hold the aircraft tracking straight down the centreline through rollout
See Arrival Rollout
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 17 stages, 15 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
At the 1,000 ft gate: centreline 1.5° off, against a 1° limit.
The approach, gate by gate
Side view — the last 1,366 m of the approach.
Plan view — the full 1,366 m runway, to the same scale as the side view.
The 96 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Phenom 300E taxied from the parking area to runway 28R at KIAG Niagara Falls International Airport, a movement that lasted 12 minutes and covered 2 nm.
During the departure roll on runway 28R, the aircraft used 2,166 m of runway, representing 72 % of the available length, and lifted off at 122 kt. Local weather at the time was 21 °C with wind 9 kt from 310°, a cross-wind component of 6 kt and a head-wind component of 7 kt.
Climb commenced 1 mile south of NY24 Taylor Johnson Airport, with the aircraft ascending from 1,626 ft asl to 32,386 ft asl, an increase of 30,760 ft achieved in 9 minutes while covering 48 nm.
The first level-cruise segment began 2 miles north-east of Brocton, New York, and lasted 3 minutes, during which 22 nm were flown.
Descent started 4 miles south-east of North East, Pennsylvania, with altitude decreasing from 32,969 ft asl to 3,408 ft asl, a loss of 29,561 ft completed in 19 minutes over 98 nm.
A second cruise phase originated 1 mile east of Fairport Harbor, Ohio, lasting 3 minutes and covering 8 nm.
The final descent began 1 mile north of Kirtland, Ohio, dropping from 3,017 ft asl to 2,235 ft asl, a reduction of 782 ft in 2 minutes while traveling 3 nm.
On final approach to runway 24 at KCGF Cuyahoga County Airport, the aircraft approached from the north-east on a heading of 228.0°, intercepting the glide path at 4 nm and 1,332 ft agl.
Landing was executed on runway 24, which is 1,366 m long. The threshold speed was recorded at 99 kt, touchdown occurred 95 m down the runway at 96 kt, and the vertical speed at touchdown was minus 243 fpm. Total landing distance measured 639 m, representing 47 % of the runway.
Runway rollout alignment was very good, and the aircraft remained on the centreline throughout the deceleration phase.
The aircraft taxied from the runway to the parking area in 1 minute, covering less than 1 nm.
In total, the flight covered 187 nm, required 48 minutes of airborne time, and consumed 348 kg of fuel.
The Phenom 300E, scored 97.4%, executed the final approach to runway 24 at KCGF Cuyahoga County Airport from the north-east, tracking a heading of 228.0 ° at 4 nm and 1,332 ft agl; the approach was assessed as stabilised at the 1,000 ft gate with gear, flaps, sink rate, glideslope, centreline and speed all within limits, and the local weather was 22 °C with wind 7 kt at 239 °, crosswind 1 kt and headwind 7 kt.
The threshold height was good and the threshold speed was a little below target at 99 kt during the flare.
Touchdown occurred 95 m down the runway at a speed of 96 kt; the touchdown rate was fair at minus 243 fpm and runway touchdown alignment was very good.
The aircraft rolled out on a runway 1,366 m long, covering a total landing distance of 639 m (47 % of runway) and maintaining very good rollout alignment.
To tighten overall performance, focus on achieving the target threshold speed of 100 kt and refining sink-rate control to improve the touchdown rate toward a more optimal value.
Scroll or drag the slider to zoom · double-click to reset · hover for values