Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Settle the descent rate
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 12 stages, 11 scored
Events
Events
Events
Events
One stabilised approach gate for a circuit: six checks at the point nearest 500 ft above the runway after the base turn. The 1,000 ft gate is an instrument-approach check and does not apply. These checks are the approach's score.
The approach, gate by gate
Side view — the last 1,301 m of the approach.
Plan view — the full 1,301 m runway, to the same scale as the side view.
The 110 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The aircraft taxied from the parking area to runway 03R at Ardmore Airport in less than one minute, covering a distance of less than one nautical mile.
During the departure roll on runway 03R, the Cessna 172 accelerated through 557 m, representing 43 % of the available runway, and lifted off at 69 kt; ambient temperature was 33 °C with a wind of 3 kt from 001°, including a 2-kt cross-wind component and a 2-kt head-wind component.
The left-hand pattern entry commenced from runway 03R, traversing less than one nautical mile in 13 seconds, followed by a crosswind leg of one nautical mile completed in 52 seconds. The downwind turn covered one nautical mile with a 37.5° angle to the runway, after which the downwind leg extended two nautical miles in 72 seconds. The base-leg turn was one nautical mile with a 9.4° angle, and the final approach proceeded from the south-west on a heading of 45.0° at one nautical mile and 548 ft AGL.
The descent phase began at 931 ft AGL and reduced to 26 ft AGL over a period of 57 seconds, meeting the stabilisation gates.
Landing was executed on runway 03R, whose length is 1,301 m; the threshold speed was slightly below the target at 57 kt. Touchdown occurred 108 m from the threshold at a speed of 50 kt, with a firm touchdown rate of minus 353 fpm and excellent runway alignment. Weather conditions remained temperature 33 °C, wind 3 kt from 001°, with the same cross-wind and head-wind components as earlier.
In total, the flight covered 8 nm, lasted 5 units of time as recorded, and consumed 3 kg of fuel.
The final approach to runway 03R at Ardmore Airport was flown from the south-west on a heading of 45.0° at 1 NM and 548 ft agl. At the 1,000 ft gate the approach was assessed as unstable, being off the glideslope, and the aircraft descended from 931 ft agl to 26 ft agl in 57 seconds, with the stabilisation gates recorded for scoring.
At threshold the height was good and the threshold speed was slightly below target at 57 kt. The aircraft crossed the runway threshold and the flare produced a touchdown distance of 108 m, a touchdown speed of 50 kt that was judged good, and runway touchdown alignment that was very good.
Touchdown occurred with a firm rate of -353 fpm on a runway 1,301 m long. Ambient conditions were 33 °C temperature, wind 3 kt from 1°, with a 2 kt crosswind component and a 2 kt headwind component.
To improve the score, focus on maintaining a stabilized approach within the glideslope envelope to avoid the unstable assessment at the 1,000 ft gate, and manage the flare to reduce the firm touchdown rate while preserving the good alignment and speed.
Scroll or drag the slider to zoom · double-click to reset · hover for values