Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 4.6 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Track the centreline through touchdown using small rudder corrections against a point at the far end of the runway.
What happened: The aircraft touched down off the centreline at 8.9 m, and drifting off centreline at touchdown usually carries through into the rollout, as it did here with alignment reaching 14 m.
Watch for: Watch runway centreline position, keeping deviation inside the limit through touchdown and rollout.
A crosswind landing is a geometry problem. The air mass you're flying in is moving sideways across the runway, and you need your ground track down the centreline with your wheels aligned to it at the moment of contact. There are two techniques that will help, the crab and the sideslip.
Read more in Crosswind Landings in the SimStart to finish · 16 stages, 14 scored
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,153 m runway, to the same scale as the side view.
The 485 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The aircraft taxied from the parking area to the departure runway in 4 minutes, covering a distance of 1 nm.
During the departure roll on runway 18 at CYWG Winnipeg / James Armstrong Richardson International Airport, the takeoff run measured 2,110 m, representing 63 % of the runway length. Liftoff was achieved at 142 kt. Ambient temperature was 16 °C with a wind of 7 kt from 180°, a cross-wind component of 1 kt and a head-wind component of 6 kt.
Climb commenced 1 mile south of CYWG, with the aircraft ascending from 1,765 ft asl to 40,992 ft asl, an increase of 39,228 ft achieved in 40 minutes while covering 334 nm.
The first level-cruise segment began 35 miles southeast of CJF6 Armstrong Seaplane Base, lasting 110 minutes and traversing 1,000 nm.
Descent started 9 miles northeast of Alberton, with altitude decreasing from 40,637 ft asl to 2,092 ft asl, a loss of 38,545 ft in 20 minutes over a distance of 154 nm.
A brief second cruise phase originated 6 miles west of Sydney, lasting 3 minutes and covering 11 nm.
Final approach to runway 06 at CYQY Sydney / J.A. Douglas McCurdy Airport involved a descent from 1,342 ft agl to 54 ft agl in 106 seconds, with the aircraft scoring on the stabilisation gates.
Landing on runway 06 at CYQY was executed on a runway 2,153 m long. The threshold speed was 133 kt; touchdown occurred 62 m beyond the touchdown zone at a speed of 125 kt and a vertical rate of minus 192 fpm. The touchdown point was laterally offset by 9.5 m from the centreline. Local weather reported a temperature of 12 °C, wind 6 kt from 330°, a cross-wind of 5 kt and a head-wind of 1 kt. Total landing distance recorded was 1,251 m, equivalent to 58 % of the runway.
Runway rollout proceeded with a slight lateral deviation, the aircraft’s alignment being off by 13.6 m from the centreline.
The aircraft taxied from the runway to the parking area in 1 minutes, covering less than 1 nm.
Overall, the flight covered 1,507nm, required 180 minutes of elapsed time, and consumed 7,455 kg of fuel.
The Boeing 737-700 executed a stabilised approach to runway 06 at CYQY, with gear, flaps, sink rate, glideslope, centreline and speed all within limits at the 1,000 ft gate. The aircraft descended from 1,342 ft agl to 54 ft agl in 106 seconds, meeting the stabilisation-gate criteria and contributing to the overall score of 93.5 %.
During the threshold and flare phase the aircraft maintained a good threshold height and achieved a threshold speed of 133 kt, both recorded as good.
Touchdown occurred 62 m beyond the designated touchdown zone with a touchdown speed of 125 kt and a vertical rate of minus 192 fpm, both judged good. The touchdown point was laterally misaligned by 9.5 m from the centreline.
Rollout alignment was slightly off centreline by 13.6 m, and the total landing distance was 1,251 m, representing 58 % of the 2,153 m runway length.
Coaching should focus on tightening centreline tracking to reduce the 9.5 m touchdown offset and the 13.6 m rollout deviation while preserving the current speed and vertical rate performance.
Scroll or drag the slider to zoom · double-click to reset · hover for values