Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Maintain the centreline
A small uncorrected heading error at 40 knots becomes a metre of offset per second by 100 knots, noticed only at rotation, producing a crabbed liftoff. Root cause is nearly always eyes on the tape instead of the far end of the runway. Small heading changes displace a distant point visibly long before the nearby centreline stripes look wrong.
Read more in Improve Your Take-OffsStart to finish · 35 stages, 33 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,800 m runway, to the same scale as the side view.
The 311 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Great job on your aircraft landing score of 96.7%! Your approach phase, with excellent glide slope alignment and slightly below target speed, set you up for a successful landing. The landing phase was another highlight, with a good threshold height and a perfect landing flare.
In the touchdown phase, your touchdown rate was smooth, and your speed was right on target. You also managed to land within the touchdown zone, with the runway touchdown position only 5.8 meters from the centerline.
Lastly, during the rollout phase, you maintained good runway alignment, just 9.2 meters from the centerline.
Overall, your performance was impressive and shows a high level of skill and precision. Keep up the great work and continue to strive for excellence in every phase of your aircraft landings. Congratulations on a job well done!
Scroll or drag the slider to zoom · double-click to reset · hover for values