My FS Flights logo MY FS FLIGHTS
HomeFlights › VDPP

Flight Simulator Flights at VDPP Phnom Penh International Airport

Flights recorded 13
Average flight score 96%
Total distance flown 7,496 nm
Departure
95%
vs 95%
Enroute
98%
vs 96% ▲ 1
Arrival
96%
vs 93% ▲ 3
Landing
92%
vs 86% ▲ 6

Phnom Penh International Airport (VDPP), long known as Pochentong, was Cambodia's principal international gateway, sited at Pou Senchey some 10 km west of the capital. Commercial passenger operations ceased on 8 September 2025 with the opening of the new Techo International Airport, but the field is being preserved as a historical site and remains usable for military and private aviation, making it an intriguing stop for the simulator pilot exploring Southeast Asian airspace.

Overview

Phnom Penh International Airport, ICAO VDPP and formerly styled Pochentong International Airport, served as Cambodia's main air gateway for over six decades until commercial flights ended in September 2025 with the transfer of operations to the new Techo International Airport. It was operated for much of its recent history by Société Concessionnaire de l'Aeroport (SCA), trading as Cambodia Airports, a joint venture majority-owned by Vinci Airports. For a virtual pilot, VDPP offers a long single instrument runway, a rich and turbulent history stretching back to the 1920s, and the novelty of flying into a field now preserved for its heritage rather than for scheduled traffic.

Airspace & Location

The airport lies in the Pou Senchey district of Phnom Penh, roughly 10 km west of the city centre. It sits within Cambodian controlled airspace served by an area control centre, approach and tower facilities, reflecting its former status as the country's principal international aerodrome.

Runways

VDPP has a single physical runway aligned 05/23, some 9,842 to 9,350 feet long (the two ends recorded at very slightly different lengths) with a hard surface and runway lighting throughout. The 23 approach is equipped with an ILS, while runway 05 is lit but has no instrument approach recorded. Field elevation is 36 feet.

Radio & Navigation

Radio services recorded for the field include an Area Control Centre on 127.5 MHz, Approach on 123.8 MHz, an ATIS broadcast on 127.25 MHz, and Tower on 118 MHz. The presence of ILS on runway 23 supports instrument approaches to that end of the field.

History

The site has been used as an airfield since 1924, predating Cambodian independence, and was one of a number of airstrips developed in the country during the Japanese occupation. After independence in 1953, King Norodom Sihanouk ordered the construction and improvement of airstrips, and the airport that became Pochentong took shape under his patronage. During the Cambodian War the field was used extensively for military and civilian airlifts; between October and December 1973 alone, C-130s of the 374th Tactical Airlift Wing flew in some 3,000 tons of rice. After Phnom Penh's other land and water supply routes were cut by the Khmer Rouge in April 1975, the airport became the city's sole remaining lifeline until the fall of the Khmer Republic later that year, after which it was almost entirely closed to international travel, with only occasional flights to and from Beijing and Pyongyang. In July 1995 the Royal Government of Cambodia signed a concession agreement with the French-Malaysian joint venture that became Société Concessionnaire de l'Aeroport, committing to a 100 million dollar improvement programme over a twenty-year concession. Air France operated an Airbus A340 service to Paris via Bangkok, later routed via Ho Chi Minh City, from March 2011 until March 2013. A further 100 million dollar terminal expansion programme was announced in 2014 to accommodate rising passenger numbers. Following government plans to build new airports for both Phnom Penh and Siem Reap, and after debate over the future of the concession, Prime Minister Hun Manet announced on 16 May 2025 that Pochentong Airport would be preserved as a historical site in recognition of its origins under King Father Norodom Sihanouk. Passenger operations ended on 8 September 2025 with the transfer of services to the newly built Techo International Airport.

The Airfield Today

Commercial passenger services at Phnom Penh International Airport ceased on 8 September 2025, with all scheduled traffic transferred to the new Techo International Airport. The field is being preserved as a historical site rather than demolished, and it continues to be available for military and private aviation use, giving it a continuing, if much reduced, flying role.

Recent Flights

VDPP → VGHS
Phnom Penh International Airport to Hazrat Shahjalal International Airport
Boeing 737-600
14 May 2026 · 1,127 nm 99.44%
VNKT → VDPP
Tribhuvan International Airport to Phnom Penh International Airport
Boeing 737-600
13 May 2026 · 1,520 nm 98.78%
VDPP → VLVT
Phnom Penh International Airport to Wattay International Airport
Airbus A321neo
18 Dec 2025 · 439 nm 97.56%
ZPPP → VDPP
Kunming Changshui International Airport to Phnom Penh International Airport
Airbus A320neo
27 Jun 2025 · 831 nm 99.28%
VDPP → VTBD
Phnom Penh Intl to Bangkok Intl
Boeing 737-700
28 Feb 2024 · 318 nm 95.79%
WMKK → VDPP
Kuala Lumpur Intl - Sepang to Phnom Penh Intl
Boeing 737-700
28 Feb 2024 · 566 nm 93.81%
VDPP → VVCM
Phnom Penh Intl to Camau
Cessna 414A
27 Jan 2024 · 178 nm 96.45%
VTBS → VDPP
Suvarnabhumi Intl to Phnom Penh Intl
Cessna 414A
26 Jan 2024 · 315 nm 93.77%
VDPP → VVTS
Phnom Penh Intl to Tansonnhat
Airbus A320neo
19 Jan 2024 · 140 nm 90.62%
VTBD → VDPP
Bangkok Intl to Phnom Penh Intl
Airbus A320neo
19 Jan 2024 · 300 nm 90.89%
VDPP → VLVT
Phnom Penh Intl to Wattay Intl
Airbus A320neo
08 Dec 2023 · 540 nm 98.44%
VDPP → WBSB
Phnom Penh Intl to Brunei Intl
Boeing 737-800
14 Oct 2023 · 728 nm 98.27%
VLVT → VDPP
Wattay Intl to Phnom Penh Intl
Boeing 737-800
13 Oct 2023 · 494 nm 98.84%