Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Arrival
Hold the aim point and wait for the speed to bleed before raising the nose, starting the flare within the normal band instead of 96 ft.
What happened: The flare began at 96 ft, 51 ft earlier than the normal band.
Watch for: Radio altimeter: start the flare within the normal flare band
See Arrival Landing
There are several things that can go wrong during the flare, carrying too much speed over the threshold, starting the flare at the wrong height and inconsistent flight control inputs, all contribute to a poor flare resulting in a hard touchdown or a float down the runway.
Read more in Flare TimingStart to finish · 15 stages, 13 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,559 m of the approach.
Plan view — the first 1,559 m of the 2,270 m runway, to the same scale as the side view.
The 437 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Princess Juliana International Airport, the Boeing 777-300 initiated its takeoff roll on runway 10. The aircraft accelerated to a liftoff speed of 160 kt, clearing the ground at 970 meters, which represented 42% of the runway's length. The local weather conditions at the time of departure featured a temperature of 29 °C, with a gentle headwind of 2 kt and a crosswind of 2 kt.
As the aircraft climbed to its cruising altitude, it traversed a distance of 115 nm, increasing its altitude by 34,041 ft in 16 minutes. The enroute climb phase concluded overhead the Saint Martin island, marking the beginning of the level cruise phase. The aircraft maintained a steady altitude of 34,992 ft for 62 minutes, covering a distance of 529 nm. Subsequently, the enroute descent phase commenced, during which the aircraft descended from 34,999 ft to 1,297 ft in 21 minutes, covering a distance of 128 nm. The descent phase concluded 49 miles north of Anna Regina Airport in Guyana.
The final approach to runway 24 at Cheddi Jagan International Airport was executed from the north-east, with the aircraft maintaining a heading of 225.0° at 4 nm and 1,191 ft above ground level. The landing was successful, with the aircraft touching down at a speed of 145 kt and a touchdown distance of 433 m, which represented 65% of the runway's length. The total landing distance was 1,480 m, and the runway rollout alignment was perfect. Following the landing, the aircraft taxied to the parking area, covering a distance of less than 1 nm in 3 minutes. The total flight distance was 779 nm, and the aircraft consumed 13,954 kg of fuel during the 108-minute flight.
The Boeing 777-300 touched down on runway 24 at SYCJ Cheddi Jagan International Airport with a score of 99.8%. The aircraft approached the runway from the north east, heading 225.0° at 4 nautical miles and 1,191 feet above ground level. The final approach quality was excellent, with a good threshold height and a threshold speed of 147 knots, well within the acceptable range.
As the aircraft made contact with the runway, the touchdown distance was good at 433 meters, but the touchdown speed of 145 knots was slightly above the ideal. The touchdown rate of -204 feet per minute was fair, indicating a moderate deceleration. The runway touchdown alignment was very good, with the aircraft centered on the runway. The local weather conditions were favorable, with a temperature of 25°C and no wind, resulting in a crosswind and headwind of 0 knots.
The total landing distance of 1,480 meters was 65% of the runway length, indicating a relatively short rollout. The runway rollout alignment was perfect, with the aircraft maintaining its centerline alignment throughout the rollout phase. Overall, the landing was executed smoothly, with the aircraft demonstrating good control and precision throughout the approach, touchdown, and rollout phases.
Scroll or drag the slider to zoom · double-click to reset · hover for values