Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 27 stages, 26 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,541 m runway, to the same scale as the side view.
The 408 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, the aircraft landing went well. The Approach Phase saw good glideslope alignment and excellent heading alignment, with the speed slightly below target. The Landing Phase had a very good landing flare, even though the threshold height was too low. The Touchdown Phase was smooth with on-target speed and good distance, despite the low threshold height. The Rollout Phase had good runway alignment.
To improve the landing for next time, I recommend ensuring the threshold height is at the correct level to prevent a too-low approach. Additionally, continue to focus on maintaining speed control throughout all phases of landing to ensure a safe and smooth touchdown. Overall, great job on the landing, keep up the good work!
Scroll or drag the slider to zoom · double-click to reset · hover for values