Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 26 stages, 25 scored
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with six checks at 1,000 ft and 500 ft above the runway.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,091 m runway, to the same scale as the side view.
The 470 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
First and foremost, I want to commend the pilot for achieving an aircraft landing score of 88.7%! This is a very respectable score and shows skill and expertise in flying.
Let's break down the analysis of the different phases of the landing:
Approach Phase: Although the descent path was below the glideslope limit and the speed was slightly above target, this can be improved with better planning and execution. It's important to maintain proper descent path and speed to ensure a smooth and safe landing.
Landing Phase: The good threshold height and excellent landing flare are definitely highlights of this phase. These are crucial elements in ensuring a successful landing and the pilot should be proud of executing them well.
Touchdown Phase: While the touchdown rate was firm and the speed was a little above target, the touchdown distance inside the touchdown zone is a positive aspect to note. It's important to work on achieving a softer touchdown and staying within the designated touchdown zone for future landings.
Rollout Phase: The runway alignment being 18.9 m from the centreline can be improved by working on maintaining a more precise alignment during the rollout phase. This will help in safely maneuvering the aircraft on the runway.
Overall, this landing performance shows a lot of potential and room for improvement. With some adjustments and practice, the pilot can aim for an even higher landing score in the future. Keep up the good work and continue striving for excellence in each phase of the landing process!
Scroll or drag the slider to zoom · double-click to reset · hover for values