Track every flight, analyse your performance,
and master your flying skills with My FS Flights
Get 10 flights free every month!
Tracked and analysed flights over miles
Replay this flight in 3D — the full flight path over the terrain with every stage, event and score along the route.
Entering runway 27 at EDCG Rugen, Average speed was 2 kn.
| Score | Description | Start | Profile | End |
| Info |
Average speed 13 kn 0 kn min to max 24 kn |
0 | 23 kn | |
| Info |
Average pitch angle 2.7 ° 1.5 ° min to max 3.5 ° |
2.6 | 3.4 ° | |
| Info |
Average bank angle 0.2 ° 0.0 ° min to max 0.7 ° |
0.1 | 0.1 ° | |
| Info |
Average g force 1.00 g 0.98 g min to max 1.01 g |
1.00 | 0.98 g | |
| Info |
Battery Master On at 23:15:54 |
|||
| Info |
Engine 1 Started at 23:15:54 |
|||
| Info |
Beacon Lights Switched On at 23:15:54 |
|||
| Info |
Landing Gear Down at 23:15:54 |
|||
| Info |
Parking Brake On at 23:15:54 |
|||
| Info |
Navigation Lights Switched On at 23:19:13 |
|||
| Info |
Taxi Lights Switched On at 23:19:14 |
|||
| Info |
Parking Brake Off at 23:19:18 |
|||
| Info |
Parking Brake On at 23:20:55 |
|||
| Info |
Landing Lights Switched On at 23:24:34 |
|||
| Info |
Strobe Lights Switched On at 23:24:35 |
|||
| Info |
Parking Brake Off at 23:24:43 |
Departure roll runway 27 at EDCG Rugen. Takeoff distance 166 m 19 % of runway. Liftoff speed was 48 kn. Local weather - Temperature 16 °C. Wind 4 kn at 270 °. Crosswind: 0 kn Headwind: 4 kn.
| Score | Description | Start | Profile | End |
| 100 % |
Takeoff distance 166 m 19 % of runway |
|||
| 74.67 % |
Liftoff speed was 48 kn Target 62 kn |
|||
| 97.94 % |
Runway alignment max 3.61 m 3.61 m left to 0.00 m left |
1.81 | 3.61 m | |
| 100 % |
Average g force 0.99 g 0.98 g min to max 1.02 g |
0.99 | 1.02 g | |
| 100 % |
Takeoff Bounce |
|||
| Info |
Average pitch angle 4.0 ° 3.3 ° min to max 7.0 ° |
3.3 | 7.0 ° | |
| Info |
Average bank angle 0.2 ° 0.0 ° min to max 0.5 ° |
0.2 | 0.5 ° |
Departure climb to 50 ft agl from runway 27 EDCG Rugen.
| Score | Description | Start | Profile | End |
| 91.67 % |
Heading variation -1.4 ° -1.8 ° min to max -0.9 ° |
-0.9 | -1.8 ° | |
| 100 % |
Average speed 55 kn 48 kn min to max 61 kn |
48 | 61 kn | |
| 96.82 % |
Average bank angle 1.7 ° 0.0 ° min to max 3.2 ° |
0.6 | 1.7 ° | |
| 100 % |
Average g force 1.00 g 0.87 g min to max 1.14 g |
1.03 | 0.96 g | |
| Info |
Average VSI 340 ft/m 150 ft/m min to max 436 ft/m |
150 | 338 ft/m | |
| Info |
Average altitude 18 ft agl 0 ft agl min to max 41 ft agl |
0 | 41 ft agl | |
| Info |
Average pitch angle 8.0 ° 5.9 ° min to max 9.8 ° |
7.4 | 6.8 ° |
Departure climb to 400 ft agl from 27 EDCG Rugen.
| Score | Description | Start | Profile | End |
| 100 % |
Heading variation -1.8 ° -2.0 ° min to max -1.4 ° |
-1.8 | -1.4 ° | |
| 100 % |
Average speed 65 kn 61 kn min to max 71 kn |
61 | 70 kn | |
| 97.82 % |
Average bank angle 1.0 ° 0.0 ° min to max 2.8 ° |
1.6 | 2.0 ° | |
| 100 % |
Average g force 1.00 g 0.84 g min to max 1.05 g |
0.96 | 1.00 g | |
| Info |
Average VSI 468 ft/m 307 ft/m min to max 1,126 ft/m |
335 | 564 ft/m | |
| Info |
Average altitude 96 ft agl 42 ft agl min to max 386 ft agl |
42 | 386 ft agl | |
| Info |
Average pitch angle 7.9 ° 6.7 ° min to max 12.0 ° |
6.8 | 7.7 ° |
Departure climb to 1,000 ft agl from 27 EDCG Rugen.
| Score | Description | Start | Profile | End |
| 100 % |
Heading variation -1.6 ° -2.2 ° min to max -1.5 ° |
-1.5 | -2.2 ° | |
| 100 % |
Average speed 72 kn 70 kn min to max 74 kn |
70 | 74 kn | |
| 56.89 % |
Average bank angle 7.7 ° 0.5 ° min to max 18.4 ° |
2.6 | 18.4 ° | |
| 100 % |
Average g force 0.99 g 0.94 g min to max 1.03 g |
0.95 | 0.96 g | |
| 100 % |
Landing gear up |
|||
| Info |
Average VSI 591 ft/m 467 ft/m min to max 686 ft/m |
563 | 467 ft/m | |
| Info |
Average altitude 440 ft agl 395 ft agl min to max 483 ft agl |
395 | 483 ft agl | |
| Info |
Average pitch angle 6.9 ° 4.5 ° min to max 8.1 ° |
7.0 | 4.5 ° |
Enroute climb started overhead EDCG Rugen Rugen (Mecklenburg-Western Pomerania, Germany). Climbing from 566 ft asl to 1,941 ft asl, an increase of 1,376 ft in 2 minutes and covering 3 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 86 kn 70 kn min to max 103 kn |
75 | 89 kn | |
| 100 % |
Average bank angle 5.0 ° 0.0 ° min to max 25.7 ° |
20.4 | 2.8 ° | |
| 100 % |
Average g force 1.00 g 0.79 g min to max 1.40 g |
0.95 | 0.92 g | |
| Info |
Average VSI 603 ft/m -818 ft/m min to max 1,400 ft/m |
310 | -779 ft/m | |
| Info |
Average altitude 1,329 ft asl 504 ft asl min to max 1,982 ft asl |
566 | 1,941 ft asl | |
| Info |
Average pitch angle 4.6 ° -5.1 ° min to max 10.1 ° |
2.9 | -3.5 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Landing Lights Switched Off at 23:27:56 |
|||
| Info |
Taxi Lights Switched Off at 23:27:58 |
Enroute level cruise started 1 mile north of Garz (Mecklenburg-Western Pomerania, Germany) and lasted 10 minutes, covering 15 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,820 ft asl 1,627 ft asl min to max 2,093 ft asl |
1,924 | 1,876 ft asl | |
| 100 % |
Average speed 88 kn 73 kn min to max 96 kn |
90 | 80 kn | |
| 100 % |
Average bank angle 1.2 ° 0.0 ° min to max 3.8 ° |
2.2 | 1.5 ° | |
| 100 % |
Average g force 1.00 g 0.81 g min to max 1.27 g |
0.95 | 1.00 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 2.3 ° -3.8 ° min to max 7.2 ° |
-3.8 | 3.1 ° |
Enroute climb started 1 mile north east of Lubmin (Mecklenburg-Western Pomerania, Germany). Climbing from 1,877 ft asl to 2,028 ft asl, an increase of 151 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 81 kn 81 kn min to max 82 kn |
81 | 82 kn | |
| 100 % |
Average bank angle 0.6 ° 0.0 ° min to max 1.1 ° |
0.6 | 1.1 ° | |
| 100 % |
Average g force 1.00 g 0.93 g min to max 1.10 g |
0.97 | 1.04 g | |
| Info |
Average VSI 199 ft/m 66 ft/m min to max 303 ft/m |
66 | 303 ft/m | |
| Info |
Average altitude 1,918 ft asl 1,877 ft asl min to max 2,028 ft asl |
1,877 | 2,028 ft asl | |
| Info |
Average pitch angle 3.8 ° 2.6 ° min to max 5.0 ° |
2.6 | 3.0 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 1 mile north east of Lubmin (Mecklenburg-Western Pomerania, Germany) and lasted 12 minutes, covering 16 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,005 ft asl 1,899 ft asl min to max 2,503 ft asl |
2,086 | 2,438 ft asl | |
| 100 % |
Average speed 96 kn 91 kn min to max 105 kn |
91 | 102 kn | |
| 100 % |
Average bank angle 2.3 ° 0.0 ° min to max 10.8 ° |
0.7 | 4.8 ° | |
| 100 % |
Average g force 1.00 g 0.79 g min to max 1.18 g |
1.01 | 0.99 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.7 ° -3.4 ° min to max 3.0 ° |
-0.2 | -2.6 ° |
Enroute descent started overhead Ziethen (Mecklenburg-Western Pomerania, Germany). Descent from 2,427 ft asl to 2,234 ft asl, a decrease of 192 ft in 1 minutes and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 102 kn 99 kn min to max 104 kn |
102 | 99 kn | |
| 100 % |
Average bank angle 6.2 ° 1.0 ° min to max 8.9 ° |
6.9 | 1.0 ° | |
| 100 % |
Average g force 1.00 g 0.93 g min to max 1.08 g |
0.98 | 0.97 g | |
| Info |
Average VSI -377 ft/m -696 ft/m min to max -27 ft/m |
-350 | -27 ft/m | |
| Info |
Average altitude 2,345 ft asl 2,234 ft asl min to max 2,427 ft asl |
2,427 | 2,234 ft asl | |
| Info |
Average pitch angle -3.0 ° -4.7 ° min to max -2.2 ° |
-2.9 | -3.3 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started overhead Anklam (Mecklenburg-Western Pomerania, Germany) and lasted 2 minutes, covering 3 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,149 ft asl 2,111 ft asl min to max 2,198 ft asl |
2,193 | 2,149 ft asl | |
| 100 % |
Average speed 109 kn 101 kn min to max 112 kn |
101 | 112 kn | |
| 100 % |
Average bank angle 8.1 ° 0.3 ° min to max 15.3 ° |
1.4 | 2.7 ° | |
| 100 % |
Average g force 1.01 g 0.91 g min to max 1.12 g |
1.01 | 0.98 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle -2.2 ° -4.2 ° min to max 0.1 ° |
-3.2 | -3.5 ° |
Enroute descent started overhead Blesewitz (Mecklenburg-Western Pomerania, Germany). Descent from 2,105 ft asl to 1,923 ft asl, a decrease of 182 ft in 1 minutes and covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 105 kn 103 kn min to max 110 kn |
110 | 103 kn | |
| 100 % |
Average bank angle 1.2 ° 0.2 ° min to max 2.4 ° |
0.2 | 0.9 ° | |
| 100 % |
Average g force 1.01 g 0.97 g min to max 1.10 g |
0.97 | 1.04 g | |
| Info |
Average VSI -297 ft/m -367 ft/m min to max -253 ft/m |
-258 | -336 ft/m | |
| Info |
Average altitude 2,015 ft asl 1,923 ft asl min to max 2,105 ft asl |
2,105 | 1,923 ft asl | |
| Info |
Average pitch angle -1.1 ° -2.4 ° min to max -0.1 ° |
-2.4 | -0.1 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started overhead Neuenkirchen (Mecklenburg-Western Pomerania, Germany) and lasted 2 minutes, covering 3 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,715 ft asl 1,503 ft asl min to max 1,919 ft asl |
1,919 | 1,503 ft asl | |
| 100 % |
Average speed 100 kn 98 kn min to max 104 kn |
102 | 100 kn | |
| 100 % |
Average bank angle 2.1 ° 0.1 ° min to max 4.5 ° |
0.2 | 3.4 ° | |
| 100 % |
Average g force 1.00 g 0.92 g min to max 1.14 g |
0.95 | 0.99 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle -0.6 ° -2.8 ° min to max 0.8 ° |
-0.6 | -1.0 ° |
Enroute descent started overhead Spantekow (Mecklenburg-Western Pomerania, Germany). Descent from 1,500 ft asl to 1,328 ft asl, a decrease of 172 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 100 kn 97 kn min to max 102 kn |
100 | 100 kn | |
| 100 % |
Average bank angle 4.1 ° 0.2 ° min to max 10.1 ° |
4.2 | 4.4 ° | |
| 100 % |
Average g force 1.00 g 0.89 g min to max 1.10 g |
1.06 | 0.96 g | |
| Info |
Average VSI -306 ft/m -672 ft/m min to max 134 ft/m |
-156 | -302 ft/m | |
| Info |
Average altitude 1,430 ft asl 1,328 ft asl min to max 1,508 ft asl |
1,500 | 1,328 ft asl | |
| Info |
Average pitch angle -1.0 ° -2.4 ° min to max 0.6 ° |
-0.4 | -1.4 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started overhead Spantekow (Mecklenburg-Western Pomerania, Germany) and lasted 2 minutes, covering 2 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,425 ft asl 1,310 ft asl min to max 1,563 ft asl |
1,322 | 1,563 ft asl | |
| 100 % |
Average speed 90 kn 83 kn min to max 101 kn |
100 | 97 kn | |
| 100 % |
Average bank angle 2.4 ° 0.0 ° min to max 7.3 ° |
5.2 | 1.4 ° | |
| 100 % |
Average g force 1.00 g 0.91 g min to max 1.34 g |
0.97 | 1.04 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 2.5 ° -1.6 ° min to max 4.6 ° |
-1.6 | 3.2 ° |
Enroute climb started 2 miles south of Spantekow (Mecklenburg-Western Pomerania, Germany). Climbing from 1,569 ft asl to 1,934 ft asl, an increase of 365 ft in 1 minutes and covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 94 kn 89 kn min to max 98 kn |
97 | 89 kn | |
| 100 % |
Average bank angle 1.0 ° 0.0 ° min to max 2.6 ° |
1.7 | 0.2 ° | |
| 100 % |
Average g force 1.00 g 0.88 g min to max 1.09 g |
1.03 | 1.02 g | |
| Info |
Average VSI 343 ft/m 30 ft/m min to max 550 ft/m |
301 | 322 ft/m | |
| Info |
Average altitude 1,741 ft asl 1,569 ft asl min to max 1,934 ft asl |
1,569 | 1,934 ft asl | |
| Info |
Average pitch angle 2.5 ° 0.9 ° min to max 3.7 ° |
3.5 | 2.0 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 3 miles south east of Siedenbollentin (Mecklenburg-Western Pomerania, Germany) and lasted 5 minutes, covering 8 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,036 ft asl 1,940 ft asl min to max 2,307 ft asl |
1,940 | 1,975 ft asl | |
| 100 % |
Average speed 95 kn 89 kn min to max 105 kn |
89 | 91 kn | |
| 100 % |
Average bank angle 2.0 ° 0.0 ° min to max 12.0 ° |
0.8 | 12.0 ° | |
| 100 % |
Average g force 1.00 g 0.81 g min to max 1.21 g |
0.94 | 1.01 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.4 ° -3.4 ° min to max 2.6 ° |
1.3 | 1.6 ° |
Enroute descent started overhead Neverin (Mecklenburg-Western Pomerania, Germany). Descent from 1,973 ft asl to 1,819 ft asl, a decrease of 154 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 93 kn 90 kn min to max 95 kn |
91 | 95 kn | |
| 100 % |
Average bank angle 8.6 ° 0.0 ° min to max 15.7 ° |
12.4 | 15.7 ° | |
| 100 % |
Average g force 1.02 g 0.94 g min to max 1.15 g |
0.98 | 1.03 g | |
| Info |
Average VSI -299 ft/m -620 ft/m min to max -53 ft/m |
-143 | -154 ft/m | |
| Info |
Average altitude 1,887 ft asl 1,819 ft asl min to max 1,973 ft asl |
1,973 | 1,819 ft asl | |
| Info |
Average pitch angle -0.3 ° -2.7 ° min to max 1.2 ° |
1.1 | -0.5 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started overhead EDBN Neubrandenburg AB Neubrandenburg (Mecklenburg-Western Pomerania, Germany) and lasted 17 minutes, covering 25 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,808 ft asl 1,507 ft asl min to max 2,067 ft asl |
1,816 | 1,659 ft asl | |
| 100 % |
Average speed 97 kn 82 kn min to max 108 kn |
96 | 101 kn | |
| 100 % |
Average bank angle 2.8 ° 0.0 ° min to max 23.2 ° |
15.7 | 0.5 ° | |
| 99.43 % |
Average g force 1.00 g 0.48 g min to max 1.50 g |
1.01 | 1.10 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.4 ° -7.6 ° min to max 8.9 ° |
-0.6 | 3.3 ° |
Enroute climb started overhead Rollwitz (Mecklenburg-Western Pomerania, Germany). Climbing from 1,677 ft asl to 2,329 ft asl, an increase of 653 ft in 2 minutes and covering 3 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 98 kn 94 kn min to max 104 kn |
100 | 95 kn | |
| 100 % |
Average bank angle 2.1 ° 0.0 ° min to max 6.9 ° |
0.3 | 4.2 ° | |
| 100 % |
Average g force 1.00 g 0.75 g min to max 1.12 g |
1.06 | 0.96 g | |
| Info |
Average VSI 407 ft/m -299 ft/m min to max 1,149 ft/m |
964 | 1,108 ft/m | |
| Info |
Average altitude 1,929 ft asl 1,677 ft asl min to max 2,329 ft asl |
1,677 | 2,329 ft asl | |
| Info |
Average pitch angle 0.1 ° -3.6 ° min to max 4.0 ° |
4.0 | 2.9 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 2 miles north of Goritz (Brandenburg, Germany) and lasted less than 1 minute. , covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,418 ft asl 2,401 ft asl min to max 2,431 ft asl |
2,428 | 2,409 ft asl | |
| 100 % |
Average speed 109 kn 96 kn min to max 114 kn |
96 | 113 kn | |
| 100 % |
Average bank angle 5.2 ° 0.0 ° min to max 8.5 ° |
0.0 | 8.5 ° | |
| 100 % |
Average g force 1.02 g 0.77 g min to max 1.39 g |
0.98 | 1.28 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle -4.2 ° -9.2 ° min to max -0.0 ° |
-3.5 | -0.3 ° |
Enroute descent started 1 mile north of Goritz (Brandenburg, Germany). Descent from 2,421 ft asl to 2,191 ft asl, a decrease of 230 ft in 1 minutes and covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 111 kn 109 kn min to max 114 kn |
112 | 109 kn | |
| 100 % |
Average bank angle 7.2 ° 0.5 ° min to max 10.3 ° |
9.4 | 4.5 ° | |
| 100 % |
Average g force 0.97 g 0.70 g min to max 1.12 g |
0.76 | 1.03 g | |
| Info |
Average VSI -36 ft/m -770 ft/m min to max 546 ft/m |
546 | -138 ft/m | |
| Info |
Average altitude 2,376 ft asl 2,191 ft asl min to max 2,441 ft asl |
2,421 | 2,191 ft asl | |
| Info |
Average pitch angle -4.6 ° -9.3 ° min to max -2.0 ° |
-3.2 | -4.2 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started overhead Goritz (Brandenburg, Germany) and lasted 1 minutes, covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,178 ft asl 2,073 ft asl min to max 2,244 ft asl |
2,178 | 2,244 ft asl | |
| 100 % |
Average speed 102 kn 94 kn min to max 112 kn |
109 | 94 kn | |
| 100 % |
Average bank angle 1.8 ° 0.0 ° min to max 4.7 ° |
4.7 | 0.8 ° | |
| 100 % |
Average g force 1.00 g 0.92 g min to max 1.16 g |
0.94 | 0.92 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle -3.0 ° -4.1 ° min to max -0.3 ° |
-4.1 | -4.0 ° |
Enroute descent started 1 mile south west of Goritz (Brandenburg, Germany). Descent from 2,155 ft asl to 1,944 ft asl, a decrease of 211 ft in 1 minutes and covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 100 kn 98 kn min to max 102 kn |
101 | 102 kn | |
| 100 % |
Average bank angle 1.0 ° 0.0 ° min to max 2.2 ° |
0.2 | 2.2 ° | |
| 100 % |
Average g force 1.00 g 0.97 g min to max 1.04 g |
1.04 | 0.97 g | |
| Info |
Average VSI -416 ft/m -859 ft/m min to max -28 ft/m |
-470 | -859 ft/m | |
| Info |
Average altitude 2,070 ft asl 1,944 ft asl min to max 2,155 ft asl |
2,155 | 1,944 ft asl | |
| Info |
Average pitch angle -1.2 ° -3.4 ° min to max 0.4 ° |
-1.7 | -3.4 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 2 miles south west of Goritz (Brandenburg, Germany) and lasted less than 1 minute. , covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,836 ft asl 1,790 ft asl min to max 1,929 ft asl |
1,929 | 1,790 ft asl | |
| 100 % |
Average speed 100 kn 96 kn min to max 105 kn |
103 | 96 kn | |
| 100 % |
Average bank angle 0.5 ° 0.0 ° min to max 1.7 ° |
0.0 | 0.6 ° | |
| 100 % |
Average g force 1.01 g 0.96 g min to max 1.12 g |
1.02 | 0.96 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.1 ° -3.2 ° min to max 1.8 ° |
-3.2 | -0.7 ° |
Enroute descent started 2 miles north of Prenzlau (Brandenburg, Germany). Descent from 1,784 ft asl to 1,616 ft asl, a decrease of 169 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 97 kn 94 kn min to max 98 kn |
96 | 94 kn | |
| 100 % |
Average bank angle 0.9 ° 0.0 ° min to max 2.6 ° |
0.1 | 1.0 ° | |
| 100 % |
Average g force 1.00 g 0.94 g min to max 1.09 g |
1.08 | 0.95 g | |
| Info |
Average VSI -328 ft/m -609 ft/m min to max -40 ft/m |
-343 | -53 ft/m | |
| Info |
Average altitude 1,685 ft asl 1,616 ft asl min to max 1,784 ft asl |
1,784 | 1,616 ft asl | |
| Info |
Average pitch angle 0.3 ° -1.4 ° min to max 1.7 ° |
0.2 | 0.8 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 1 mile north of Prenzlau (Brandenburg, Germany) and lasted 1 minutes, covering 2 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,629 ft asl 1,593 ft asl min to max 1,677 ft asl |
1,613 | 1,677 ft asl | |
| 100 % |
Average speed 89 kn 83 kn min to max 95 kn |
94 | 86 kn | |
| 100 % |
Average bank angle 1.2 ° 0.0 ° min to max 4.9 ° |
1.4 | 1.0 ° | |
| 100 % |
Average g force 1.00 g 0.65 g min to max 1.24 g |
0.97 | 0.98 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 2.7 ° -1.5 ° min to max 5.7 ° |
0.5 | 3.2 ° |
Enroute climb started overhead Prenzlau (Brandenburg, Germany). Climbing from 1,679 ft asl to 1,832 ft asl, an increase of 152 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 80 kn 76 kn min to max 85 kn |
85 | 79 kn | |
| 100 % |
Average bank angle 1.9 ° 0.0 ° min to max 4.6 ° |
0.7 | 0.9 ° | |
| 100 % |
Average g force 0.99 g 0.90 g min to max 1.15 g |
0.99 | 0.96 g | |
| Info |
Average VSI 293 ft/m -201 ft/m min to max 671 ft/m |
170 | -201 ft/m | |
| Info |
Average altitude 1,767 ft asl 1,679 ft asl min to max 1,838 ft asl |
1,679 | 1,832 ft asl | |
| Info |
Average pitch angle 4.4 ° 1.4 ° min to max 6.4 ° |
3.1 | 1.4 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 1 mile south west of Prenzlau (Brandenburg, Germany) and lasted less than 1 minute. , covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,759 ft asl 1,704 ft asl min to max 1,827 ft asl |
1,827 | 1,818 ft asl | |
| 100 % |
Average speed 90 kn 80 kn min to max 96 kn |
80 | 88 kn | |
| 100 % |
Average bank angle 1.6 ° 0.0 ° min to max 4.0 ° |
0.9 | 3.7 ° | |
| 100 % |
Average g force 1.01 g 0.88 g min to max 1.20 g |
1.00 | 0.88 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 1.6 ° -3.6 ° min to max 4.6 ° |
1.2 | 1.0 ° |
Enroute climb started 1 mile south west of Prenzlau (Brandenburg, Germany). Climbing from 1,820 ft asl to 2,009 ft asl, an increase of 189 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 87 kn 84 kn min to max 91 kn |
89 | 91 kn | |
| 100 % |
Average bank angle 2.8 ° 0.0 ° min to max 5.8 ° |
2.4 | 0.6 ° | |
| 100 % |
Average g force 1.01 g 0.85 g min to max 1.11 g |
0.98 | 0.97 g | |
| Info |
Average VSI 341 ft/m 117 ft/m min to max 959 ft/m |
164 | 138 ft/m | |
| Info |
Average altitude 1,936 ft asl 1,820 ft asl min to max 2,009 ft asl |
1,820 | 2,009 ft asl | |
| Info |
Average pitch angle 2.6 ° 0.5 ° min to max 6.1 ° |
1.0 | 0.7 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 2 miles south of Prenzlau (Brandenburg, Germany) and lasted 1 minutes, covering 2 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,059 ft asl 2,006 ft asl min to max 2,134 ft asl |
2,010 | 2,075 ft asl | |
| 100 % |
Average speed 95 kn 92 kn min to max 99 kn |
92 | 99 kn | |
| 100 % |
Average bank angle 2.8 ° 0.2 ° min to max 5.8 ° |
0.3 | 5.4 ° | |
| 100 % |
Average g force 1.01 g 0.94 g min to max 1.10 g |
1.00 | 1.06 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 1.0 ° -1.7 ° min to max 2.8 ° |
1.0 | 0.9 ° |
Enroute descent started 4 miles south of Prenzlau (Brandenburg, Germany). Descent from 2,074 ft asl to 1,890 ft asl, a decrease of 184 ft in less than 1 minute. and covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 100 kn 98 kn min to max 102 kn |
99 | 102 kn | |
| 100 % |
Average bank angle 1.8 ° 0.0 ° min to max 4.9 ° |
4.9 | 1.1 ° | |
| 100 % |
Average g force 1.00 g 0.79 g min to max 1.19 g |
1.06 | 0.97 g | |
| Info |
Average VSI -340 ft/m -705 ft/m min to max 162 ft/m |
-46 | -564 ft/m | |
| Info |
Average altitude 1,985 ft asl 1,890 ft asl min to max 2,081 ft asl |
2,074 | 1,890 ft asl | |
| Info |
Average pitch angle -0.4 ° -2.9 ° min to max 2.1 ° |
1.3 | -1.0 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 4 miles north east of Gerswalde (Brandenburg, Germany) and lasted 5 minutes, covering 8 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,903 ft asl 1,786 ft asl min to max 2,131 ft asl |
1,881 | 2,127 ft asl | |
| 100 % |
Average speed 97 kn 92 kn min to max 110 kn |
103 | 102 kn | |
| 100 % |
Average bank angle 3.3 ° 0.0 ° min to max 14.6 ° |
1.4 | 3.2 ° | |
| 98.57 % |
Average g force 1.01 g 0.45 g min to max 1.49 g |
1.04 | 0.93 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.3 ° -6.3 ° min to max 5.7 ° |
-0.5 | -1.9 ° |
Enroute descent started 3 miles south of Gerswalde (Brandenburg, Germany). Descent from 2,122 ft asl to 1,728 ft asl, a decrease of 394 ft in 1 minutes and covering 2 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 102 kn 96 kn min to max 106 kn |
102 | 98 kn | |
| 100 % |
Average bank angle 1.8 ° 0.0 ° min to max 5.2 ° |
3.1 | 0.7 ° | |
| 100 % |
Average g force 1.00 g 0.90 g min to max 1.17 g |
0.90 | 1.08 g | |
| Info |
Average VSI -361 ft/m -896 ft/m min to max -9 ft/m |
-223 | -557 ft/m | |
| Info |
Average altitude 1,933 ft asl 1,728 ft asl min to max 2,122 ft asl |
2,122 | 1,728 ft asl | |
| Info |
Average pitch angle -1.3 ° -4.4 ° min to max 0.9 ° |
-2.8 | -1.0 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 4 miles north east of Friedrichswalde (Brandenburg, Germany) and lasted 9 minutes, covering 15 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,847 ft asl 1,564 ft asl min to max 2,096 ft asl |
1,722 | 2,074 ft asl | |
| 100 % |
Average speed 92 kn 82 kn min to max 98 kn |
98 | 91 kn | |
| 100 % |
Average bank angle 2.4 ° 0.0 ° min to max 13.0 ° |
0.9 | 1.4 ° | |
| 100 % |
Average g force 1.00 g 0.72 g min to max 1.29 g |
1.09 | 0.94 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 1.5 ° -2.4 ° min to max 5.8 ° |
-0.2 | 1.9 ° |
Enroute climb started overhead Niederfinow (Brandenburg, Germany). Climbing from 2,100 ft asl to 2,296 ft asl, an increase of 196 ft in 1 minutes and covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 88 kn 76 kn min to max 92 kn |
90 | 84 kn | |
| 100 % |
Average bank angle 0.9 ° 0.0 ° min to max 1.8 ° |
1.6 | 1.1 ° | |
| 100 % |
Average g force 1.04 g 0.90 g min to max 1.22 g |
0.98 | 0.90 g | |
| Info |
Average VSI 146 ft/m -270 ft/m min to max 992 ft/m |
-141 | -270 ft/m | |
| Info |
Average altitude 2,104 ft asl 2,054 ft asl min to max 2,296 ft asl |
2,100 | 2,296 ft asl | |
| Info |
Average pitch angle 3.0 ° -3.8 ° min to max 7.2 ° |
1.0 | -3.8 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started 1 mile west of Hohenfinow (Brandenburg, Germany) and lasted 32 minutes, covering 46 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 1,888 ft asl 1,564 ft asl min to max 2,287 ft asl |
2,234 | 2,177 ft asl | |
| 100 % |
Average speed 95 kn 77 kn min to max 103 kn |
98 | 97 kn | |
| 100 % |
Average bank angle 2.2 ° 0.0 ° min to max 16.5 ° |
0.1 | 2.7 ° | |
| 100 % |
Average g force 1.00 g 0.74 g min to max 1.34 g |
0.93 | 0.89 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.9 ° -5.1 ° min to max 7.1 ° |
2.8 | 2.8 ° |
Enroute climb started 1 mile west of EDAZ Schonhagen Schonhagen (Brandenburg, Germany). Climbing from 2,237 ft asl to 2,390 ft asl, an increase of 153 ft in 1 minutes and covering 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 95 kn 94 kn min to max 97 kn |
95 | 96 kn | |
| 100 % |
Average bank angle 1.5 ° 0.1 ° min to max 4.1 ° |
0.5 | 0.7 ° | |
| 100 % |
Average g force 0.97 g 0.94 g min to max 0.99 g |
0.94 | 0.99 g | |
| Info |
Average VSI 260 ft/m 155 ft/m min to max 484 ft/m |
155 | 160 ft/m | |
| Info |
Average altitude 2,319 ft asl 2,237 ft asl min to max 2,390 ft asl |
2,237 | 2,390 ft asl | |
| Info |
Average pitch angle 1.2 ° 0.0 ° min to max 2.5 ° |
0.3 | 2.2 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Enroute level cruise started overhead EDAZ Schonhagen Schonhagen (Brandenburg, Germany) and lasted less than 1 minute. , covering less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 2,324 ft asl 2,276 ft asl min to max 2,381 ft asl |
2,381 | 2,276 ft asl | |
| 100 % |
Average speed 98 kn 94 kn min to max 101 kn |
94 | 101 kn | |
| 100 % |
Average bank angle 11.4 ° 4.2 ° min to max 18.6 ° |
4.2 | 7.7 ° | |
| 100 % |
Average g force 1.02 g 0.89 g min to max 1.18 g |
0.95 | 1.18 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.0 ° -1.4 ° min to max 1.9 ° |
-0.4 | 1.9 ° |
Enroute descent started overhead EDAZ Schonhagen Schonhagen (Brandenburg, Germany). Descent from 2,281 ft asl to 829 ft asl, a decrease of 1,452 ft in 3 minutes and covering 3 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 93 kn 86 kn min to max 110 kn |
100 | 89 kn | |
| 100 % |
Average bank angle 9.7 ° 0.0 ° min to max 25.5 ° |
6.6 | 0.9 ° | |
| 100 % |
Average g force 1.03 g 0.81 g min to max 1.28 g |
0.88 | 0.99 g | |
| Info |
Average VSI -553 ft/m -1,312 ft/m min to max 160 ft/m |
154 | 40 ft/m | |
| Info |
Average altitude 1,371 ft asl 816 ft asl min to max 2,281 ft asl |
2,281 | 829 ft asl | |
| Info |
Average pitch angle -1.3 ° -7.9 ° min to max 2.5 ° |
0.1 | 1.5 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Landing Lights Switched On at 01:21:30 |
|||
| Info |
Taxi Lights Switched On at 01:21:30 |
Enroute level cruise started 3 miles north of Luckenwalde (Brandenburg, Germany) and lasted 3 minutes, covering 3 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average altitude 714 ft asl 521 ft asl min to max 858 ft asl |
829 | 568 ft asl | |
| 100 % |
Average speed 71 kn 53 kn min to max 88 kn |
88 | 54 kn | |
| 100 % |
Average bank angle 4.1 ° 0.2 ° min to max 14.3 ° |
0.8 | 9.0 ° | |
| 100 % |
Average g force 1.01 g 0.78 g min to max 1.33 g |
0.99 | 0.97 g | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 | |
| Info |
Average pitch angle 0.8 ° -3.1 ° min to max 11.3 ° |
1.4 | 2.6 ° | |
| Info |
Flaps Position 1 at 01:24:03 |
|||
| Info |
Flaps Position 2 at 01:25:02 |
|||
| Info |
Flaps Position 3 at 01:25:47 |
Arrival started 3 miles north of Luckenwalde (Brandenburg, Germany).
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 66 kn 55 kn min to max 70 kn |
55 | 70 kn | |
| 100 % |
Average bank angle 8.3 ° 0.0 ° min to max 17.6 ° |
10.7 | 0.1 ° | |
| 100 % |
Average g force 1.00 g 0.90 g min to max 1.09 g |
0.90 | 1.06 g | |
| Info |
Average VSI -640 ft/m -850 ft/m min to max 186 ft/m |
186 | -800 ft/m | |
| Info |
Average altitude 434 ft asl 268 ft asl min to max 571 ft asl |
571 | 268 ft asl | |
| Info |
Average pitch angle -2.8 ° -4.5 ° min to max 0.7 ° |
0.7 | -2.2 ° | |
| Info |
Turn coordination 0 0 min to max 0 |
0 | 0 |
Approaching runway 07 at EDAZ Schonhagen from 1 nm to 0 nm. Descent from 122 ft agl to 9 ft agl. A decrease of 113 ft in 15 seconds.
| Score | Description | Start | Profile | End |
| 100 % |
Approach angle 1.2 ° 0.7 ° min to max 2.6 ° Target 3.0 ° |
2.6 | 0.7 ° | |
| 100 % |
Average speed 60 kn 51 kn min to max 69 kn |
69 | 51 kn | |
| 100 % |
Heading variation -0.2 ° -0.3 ° min to max -0.1 ° |
-0.3 | -0.1 ° | |
| 94.79 % |
Average bank angle 1.8 ° 0.0 ° min to max 5.7 ° |
0.7 | 0.4 ° | |
| 100 % |
Average g force 1.03 g 0.92 g min to max 1.11 g |
1.05 | 0.98 g | |
| Info |
Average VSI -389 ft/m -733 ft/m min to max -59 ft/m |
-695 | -59 ft/m | |
| Info |
Average altitude 37 ft agl 9 ft agl min to max 122 ft agl |
122 | 9 ft agl | |
| Info |
Average pitch angle 1.5 ° -3.3 ° min to max 5.2 ° |
-1.8 | 4.7 ° |
Landing on runway 07 at EDAZ Schonhagen, runway length 1,098 m. Good threshold height. Threshold speed was a little below target at 51 kn.
| Score | Description | Start | Profile | End |
| 84.37 % |
Threshold speed was a little below target at 51 kn. Target 63 kn |
|||
| 100 % |
Target 50 ft agl |
|||
| 92.67 % |
Landing and flare profile |
|||
| 100 % |
Heading variation -0.2 ° -0.2 ° min to max -0.1 ° |
-0.1 | -0.2 ° | |
| 100 % |
Average bank angle 0.8 ° 0.0 ° min to max 1.3 ° |
0.3 | 0.5 ° | |
| 100 % |
Average g force 1.00 g 0.90 g min to max 1.07 g |
0.97 | 0.90 g | |
| Info |
Average speed 46 kn 41 kn min to max 51 kn |
51 | 41 kn | |
| Info |
Average VSI -61 ft/m -104 ft/m min to max 13 ft/m |
-59 | -49 ft/m | |
| Info |
Average altitude 7 ft agl 5 ft agl min to max 12 ft agl |
12 | 5 ft agl | |
| Info |
Average pitch angle 5.9 ° 4.6 ° min to max 7.9 ° |
4.7 | 5.4 ° |
Touchdown distance was good at 179 m. Touchdown speed at 41 kn was good. Touchdown rate was perfect at -49 ft/m. Runway touchdown alignment was very good. Local weather - Temperature 18 °C. Wind 9 kn at 1 °. Crosswind: 8 kn Headwind: 2 kn.
| Score | Description | Start | Profile | End |
| 100 % |
Touchdown VSI was -49 ft/m. |
|||
| 100 % |
Touchdown distance was 179 m Target 457 m |
|||
| 100 % |
Speed at touchdown 41 kn Target 53 kn |
|||
| 100 % |
Runway alignment max 2.50 m 2.32 m right |
-2.50 | -2.01 m | |
| 100 % |
Average bank angle 0.8 ° 0.2 ° min to max 1.2 ° |
0.5 | 1.2 ° | |
| 100 % |
Average g force 1.07 g 0.90 g min to max 1.17 g |
0.90 | 1.05 g | |
| 100 % |
Landing Bounce |
|||
| Info |
Average speed 40 kn 40 kn min to max 41 kn |
41 | 40 kn | |
| Info |
Average pitch angle 4.6 ° 3.8 ° min to max 5.4 ° |
5.4 | 3.8 ° |
Total landing distance 422 m, 38 % of runway. Runway rollout alignment was very good.
| Score | Description | Start | Profile | End |
| 100 % |
Landing distance 422 m 38 % of runway. |
|||
| 87.56 % |
Runway alignment max 8.39 m 6.46 m left to 1.92 m right |
-1.92 | 5.08 m | |
| 100 % |
Average g force 1.01 g 1.00 g min to max 1.04 g |
1.03 | 1.00 g | |
| Info |
Average speed 42 kn 31 kn min to max 46 kn |
46 | 31 kn | |
| Info |
Average pitch angle 3.7 ° 3.1 ° min to max 3.9 ° |
3.7 | 3.2 ° | |
| Info |
Average bank angle 0.7 ° 0.0 ° min to max 1.2 ° |
1.2 | 0.1 ° |
Exiting runway, average speed 5 kn
| Score | Description | Start | Profile | End |
| Info |
Average speed 11 kn 0 kn min to max 29 kn |
29 | 8 kn | |
| Info |
Average pitch angle 3.1 ° 2.4 ° min to max 3.7 ° |
3.2 | 2.4 ° | |
| Info |
Average bank angle 0.3 ° 0.0 ° min to max 1.0 ° |
0.4 | 0.2 ° | |
| Info |
Average g force 1.00 g 0.99 g min to max 1.01 g |
0.99 | 1.00 g | |
| Info |
Flaps Position 2 at 01:27:49 |
|||
| Info |
Flaps Fully Retracted at 01:27:50 |
|||
| Info |
Landing Lights Switched Off at 01:27:56 |
|||
| Info |
Strobe Lights Switched Off at 01:27:57 |
Taxiing to the parking from the runway took 4 minutes and covered less than 1 nm.
| Score | Description | Start | Profile | End |
| 100 % |
Average speed 10 kn 0 kn min to max 19 kn |
8 | 0 kn | |
| 100 % |
Average speed turning corners 6 kn max 14 kn |
0 | 0 kn | |
| 100 % |
Average g force 1.00 g 0.99 g min to max 1.00 g |
1.00 | 1.00 g | |
| Info |
Average pitch angle 3.1 ° 2.6 ° min to max 3.6 ° |
2.6 | 3.2 ° | |
| Info |
Average bank angle 0.2 ° 0.0 ° min to max 0.8 ° |
0.6 | 0.0 ° | |
| Info |
Taxi Lights Switched Off at 01:29:51 |
|||
| Info |
Parking Brake On at 01:30:26 |
|||
| Info |
Navigation Lights Switched Off at 01:32:06 |
|||
| Info |
Engine 1 Stopped at 01:32:26 |
|||
| Info |
Battery Master Off at 01:32:31 |
|||
| Info |
Beacon Lights Switched Off at 01:32:34 |
Drag to zoom · double-click to reset · hover for values