Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 18 stages, 17 scored
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 2,083 m of the approach.
Plan view — the first 2,083 m of the 2,849 m runway, to the same scale as the side view.
Touched down 801 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Overall, this landing was very well executed with several aspects that were done exceptionally well. The rate of descent during the Approach Phase was excellent, as was the heading alignment and speed. The Landing Phase also had a good threshold height and a very smooth landing flare. The Touchdown Phase was particularly impressive with an excellent touchdown rate and good speed, although it's important to note that there was a slight tailwind upon landing.
Moving forward, it would be beneficial to pay closer attention to wind conditions before landing to ensure a safe and smooth touchdown. Additionally, maintaining focus on runway alignment throughout the Rollout Phase is important for a successful landing. Keep up the great work and continue to fine-tune your skills for even better landings in the future. Great job!
Scroll or drag the slider to zoom · double-click to reset · hover for values