Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 16 stages, 15 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,494 m runway, to the same scale as the side view.
The 422 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, this aircraft landing had a mixed performance across different phases.
During the Approach Phase, the descent path was poor as the aircraft was above the glideslope limit. However, the heading alignment was excellent and the speed was well above target, which could have potentially been a contributing factor to the poor descent path.
Moving on to the Landing Phase, the aircraft had a good threshold height and executed a perfect landing flare. This phase of the landing seemed to be well executed.
In the Touchdown Phase, the touchdown rate was smooth, however, the speed was above target. The touchdown distance inside the touchdown zone was good, but the touchdown position on the runway was 3.0 m from the centerline, which is not ideal. Additionally, the aircraft landed with a 4 kn tailwind, which is a safety concern.
Finally, in the Rollout Phase, the runway alignment was 9.2 m from the centerline, which is outside the acceptable range.
In conclusion, while certain aspects of the landing were well-executed, such as the landing flare and threshold height, there were areas of concern such as being above the glideslope limit during the approach and landing with a tailwind. It is important for the crew to review and address these issues to ensure safer landings in the future.