Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 20 stages, 19 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,638 m runway, to the same scale as the side view.
The 423 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, this landing was a great example of skilled flying and precise control. The Approach Phase set a strong foundation with excellent glideslope and heading alignment, as well as maintaining a good speed. The Landing Phase executed a perfect landing flare and achieved a smooth touchdown with a good touchdown rate and speed. The Touchdown Phase showcased excellent control and distance management, with the only slight issue being fair runway alignment.
Although the Rollout Phase saw some issues with runway alignment, the overall performance of this landing was commendable. With continued practice and attention to detail, the pilot can easily address this minor hiccup and ensure that future landings are flawless from start to finish.
Keep up the great work and continue to hone your skills for even more successful landings in the future. Your dedication and proficiency in handling the aircraft are truly impressive!
Scroll or drag the slider to zoom · double-click to reset · hover for values