Settle the descent rate
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 11 stages, 10 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 300 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 300 ft gate: sink rate 1,892 fpm, more than the glideslope needed, glideslope 6.7° against the runway's 3°, centreline 7.5° off, against a 1° limit and wings 14° of bank, against a 10° limit.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,567 m runway, to the same scale as the side view.
The 433 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Taxiing from the parking area to the runway at Gatlinburg-Pigeon Forge Airport (KGKT) took approximately 4 minutes, covering less than 1 nautical mile. The Cessna 404 Titan, registered as N946RC, then began its departure roll on runway 28, utilizing 49% of the available runway length to achieve a takeoff distance of 771 meters. The aircraft lifted off at a speed of 90 knots, with a local temperature of 28°C and a wind of 12 knots at 9°.
As the aircraft transitioned to the enroute phase, it began its initial climb overhead Sevierville, Tennessee, reaching an altitude of 3,533 feet above sea level from an initial 1,297 feet. This climb of 2,236 feet was achieved in just 2 minutes, covering a distance of 4 nautical miles. The enroute descent phase commenced 2 miles north of Sevierville, with the aircraft descending from 3,549 feet to 1,077 feet in 3 minutes, covering a distance of 8 nautical miles. The final approach to runway 28 at KGKT was conducted from the east, with the aircraft maintaining a heading of 280.0° at an altitude of 61 feet above ground level.
The Cessna 404 Titan touched down on runway 28, utilizing 431 meters of the available 1,567-meter runway length. The touchdown speed was 82 knots, with a touchdown rate of -77 feet per minute, indicating an excellent rate of descent. Although the runway touchdown position was slightly misaligned from the centerline by 6.6 meters, the landing was otherwise uneventful. The total flight distance was 15 nautical miles, with a total flight time of 9 minutes and a fuel consumption of 27 kilograms.
The Cessna 404 Titan N946RC successfully completed a final approach to runway 28 at KGKT Gatlinburg-Pigeon Forge Airport from the east, aligning with the heading of 280.0° at 0 nm and 61 ft above ground level. The approach quality was excellent, with a good threshold height allowing the pilot to maintain a stable and controlled descent. The threshold speed of 103 kt was achieved, indicating a well-executed approach.
As the aircraft touched down on the runway, the touchdown distance was good at 431 m, and the touchdown speed of 82 kt was within the acceptable range. The touchdown rate of -77 fpm was excellent, demonstrating a smooth and controlled touchdown. However, the runway touchdown position was slightly misaligned by 6.6 m from the centreline, which may have been due to a slight deviation in the approach or a minor issue with the aircraft's directional control.
The rollout phase was uneventful, with the aircraft coming to a stop within a reasonable distance. The local weather conditions, with a temperature of 27 °C and a 10 kt wind at 10°, did not pose any significant challenges to the landing. Overall, the landing was scored 99.3%, reflecting the high level of proficiency and control demonstrated by the pilot throughout the approach, touchdown, and rollout phases.