Use smooth, coordinated aileron inputs to keep the wings level during the climb.
What happened: Bank angle increased during the second climb stage, excessive for a wings-level climb.
Watch for: Watch the attitude indicator and keep bank angle near zero.
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 19 stages, 17 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 300 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 300 ft gate: glideslope 4.8° against the runway's 3° and speed 10 kt SLOW on the reference speed of 93 kt.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,708 m runway, to the same scale as the side view.
The 497 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The OV-10 Bronco taxied from the parking area to runway 13, a movement that lasted 2 minutes and covered less than 1 nm.
During the departure roll on runway 13 at 46U Alpine, the aircraft used 1,190 m of runway (67 % of the available length) and lifted off at 97 kt. Ambient conditions were a temperature of 23 °C with wind 2 kt from 089°, a cross-wind component of 1 kt and a head-wind component of 1 kt.
Climb commenced overhead 32WY Double L Ranch Airport Etna, where the aircraft rose from 6,025 ft asl to 13,026 ft asl, an increase of 7,002 ft in 5 minutes while covering 20 nm.
A level cruise segment began overhead Alpine, lasting 2 minutes and covering 6 nm.
Subsequent cruise started 1 mile west of Afton, persisted for 8 minutes and spanned 34 nm.
Climb resumed 4 miles southeast of Montpelier, with altitude increasing from 12,789 ft asl to 13,693 ft asl, a gain of 904 ft in 2 minutes over 6 nm.
Descent began 3 miles south of 1U7 Bear Lake County Paris, descending from 13,759 ft asl to 5,632 ft asl, a loss of 8,127 ft in 10 minutes while covering 42 nm.
Climb followed 2 miles east of Mendon, raising the aircraft from 5,633 ft asl to 7,277 ft asl, an increase of 1,644 ft in 2 minutes across 5 nm.
A second descent started 2 miles northeast of Honeyville, dropping from 7,156 ft asl to 5,222 ft asl, a decrease of 1,934 ft in 2 minutes and covering 5 nm.
The final cruise segment originated 1 mile south of Honeyville, lasted 3 minutes and covered 8 nm.
On final approach to runway 35 at KBMC Brigham City Regional Airport, the aircraft approached from the south on a heading of 360.0°, intercepting the glide path at 1 nm and 363 ft agl.
Landing on runway 35, whose length is 2,708 m, occurred with a threshold height of 74 ft agl and a threshold speed of 84 kt. Touchdown was recorded 124 m beyond the touchdown zone at a speed of 77 kt, with a touchdown rate of minus 294 fpm and perfect runway alignment. Local weather at the time was a temperature of 20 °C, wind 5 kt from 339°, a cross-wind component of 2 kt and a head-wind component of 5 kt.
The rollout distance measured 792 m, representing 29 % of the runway, and rollout alignment was very good.
The aircraft taxied from the runway to the parking area in 2 minutes, covering less than 1 nm.
In total, the flight covered 129 nm, required 38 minutes of elapsed time, and consumed 174 kg of fuel.
The North American Rockwell OV-10 Bronco on a final approach to runway 35 at KBMC Brigham City Regional Airport maintained a heading of 360.0° at 1 nm and 363 ft agl, with local temperature 20 °C, wind 5 kt from 339°, a 2 kt cross-wind component and a 5 kt head-wind component. The aircraft’s overall score was 86.9 %.
During the threshold and flare segment the threshold height was 74 ft agl, which was well above target, and the threshold speed was slightly below target at 84 kt.
Touchdown occurred 124 m beyond the touchdown zone; touchdown speed was 77 kt and was judged good, while the touchdown rate was fair at minus 294 fpm. Runway touchdown alignment was perfect.
The total landing distance measured 792 m, representing 29 % of the 2,708 m runway, and rollout alignment was very good.
Coaching should focus on achieving the intended threshold height to avoid excess altitude at the flare and on reducing the touchdown point distance to keep the landing within the designated zone, which will also help moderate the descent rate.