My FS Flights logo MY FS FLIGHTS – Flight Simulator Tracker

Transform Your Flight Sim Experience
with In-Depth Tracking & Analysis

Track every flight, analyse your performance,
and master your flying skills with My FS Flights

Get 10 flights free every month!

Tracked and analysed flights over miles

Flight from EGLL to EBLG
Saturday, 04 October 2025 01:29
Minutes 53
269 nm
Fuel 20,303 kg
Boeing 777-300

Departure

Runway 27R at EGLL
London Heathrow Airport
London, Greater London, England
Altitude
75 ft asl
Weight
288,330 kg
Fuel
81,318 kg
Temperature
18 °C
Wind Speed
23 kt
Wind Direction
227.9 °
Headwind
17 kt
Crosswind
15 kt

Arrival

Runway 22L at EBLG
Liège Airport
Grâce-Hollogne Wallonia, Belgium
610 ft asl
Altitude
298,697 kg
Weight
61,014 kg
Fuel
13 °C
Temperature
20 kt
Wind Speed
190.0 °
Wind Direction
17 kt
Headwind
11 kt
Crosswind
Flight Score 92.09%
Departure Score 98.87%
Enroute Score 94.85%
Arrival Score 82.55%

The flight began with the Boeing 777-300 taxiing from the parking area to the runway at London Heathrow Airport, taking approximately 2 minutes to cover less than 1 nautical mile. The aircraft then departed from runway 27R, with a takeoff distance of 1,502 meters, which was 42% of the runway length. The liftoff speed was 184 knots.

As the aircraft climbed, it encountered local weather conditions of 18°C temperature and winds of 32 knots at 227 degrees. The crosswind was 21 knots, and the headwind was 24 knots. The enroute climb started overhead Harmondsworth, where the aircraft ascended from 1,139 feet above sea level to 21,924 feet above sea level, an increase of 20,785 feet in 10 minutes, covering 3 nautical miles.

The enroute level cruise began overhead Old Windsor, lasting 10 minutes and covering 68 nautical miles. The aircraft then started its descent from 22,095 feet above sea level to 21,135 feet above sea level, a decrease of 960 feet in 2 minutes, covering 15 nautical miles. The enroute level cruise resumed 10 miles south east of Deal, lasting 21 minutes and covering 135 nautical miles.

The descent from 21,268 feet above sea level to 2,655 feet above sea level began 2 miles north west of Gesves, a decrease of 18,613 feet in 7 minutes, covering 34 nautical miles. The enroute level cruise started 2 miles north of Riemst, lasting 3 minutes and covering 9 nautical miles. The final approach to runway 22L at Liège Airport was from the north east, heading 225.0 degrees at 4 nautical miles and 850 feet above ground level.

The landing on runway 22L at Liège Airport was successful, with a touchdown distance of 441 meters, which was 31% of the runway length. The touchdown speed was 154 knots, and the touchdown rate was excellent at -70 feet per minute. However, the runway touchdown position was significantly misaligned by 19.0 meters from the centreline. The local weather conditions at the time of landing were 13°C temperature and winds of 20 knots at 189 degrees, with a crosswind of 12 knots and a headwind of 17 knots.

The total landing distance was 946 meters, and the runway rollout alignment was also misaligned by 19.0 meters from the centreline. The total flight distance was 269 nautical miles, taking 53 minutes, and the aircraft used 20,303 kilograms of fuel.


Screenshots
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:21. Altitude 20,115 ft agl, Heading 198.4 °, Speed 438 kt. Enroute climb overhead Gerrards Cross (Buckinghamshire, England).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:21. Altitude 20,115 ft agl, Heading 198.4 °, Speed 438 kt. Enroute climb overhead Gerrards Cross (Buckinghamshire, England).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:21. Altitude 20,559 ft agl, Heading 198.3 °, Speed 440 kt. Enroute climb 1 mile south west of Denham (Buckinghamshire, England).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:21. Altitude 20,559 ft agl, Heading 198.3 °, Speed 440 kt. Enroute climb 1 mile south west of Denham (Buckinghamshire, England).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:21. Altitude 20,859 ft agl, Heading 198.3 °, Speed 442 kt. Enroute climb 1 mile east of Stoke Poges (Buckinghamshire, England).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:21. Altitude 21,255 ft agl, Heading 198.4 °, Speed 445 kt. Enroute climb 1 mile east of Slough (Slough, England).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:41. Altitude 21,069 ft agl, Heading 122.4 °, Speed 463 kt. Enroute level 1 mile east of Houthulst (Flanders, Belgium).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:41. Altitude 21,069 ft agl, Heading 122.4 °, Speed 463 kt. Enroute level 1 mile east of Houthulst (Flanders, Belgium).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:41. Altitude 21,069 ft agl, Heading 122.4 °, Speed 463 kt. Enroute level 1 mile east of Houthulst (Flanders, Belgium).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:41. Altitude 21,121 ft agl, Heading 122.5 °, Speed 463 kt. Enroute level overhead Staden (Flanders, Belgium).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 00:41. Altitude 21,107 ft agl, Heading 122.6 °, Speed 463 kt. Enroute level 1 mile north of Oostnieuwkerke (Flanders, Belgium).
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 216.8 °, Speed 27 kt. Exit runway 22L EBLG Liège Airport Grâce-Hollogne (Wallonia, Belgium)
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 216.8 °, Speed 27 kt. Exit runway 22L EBLG Liège Airport Grâce-Hollogne (Wallonia, Belgium)
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 216.7 °, Speed 27 kt. Exit runway 22L EBLG Liège Airport Grâce-Hollogne (Wallonia, Belgium)
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Image
Flight from EGLL to EBLG in the Boeing 777-300 on Sat 04-Oct-25 01:07. Altitude 14 ft agl, Heading 87.4 °, Speed 0 kt.
Flight Map

Replay this flight in 3D — the full flight path over the terrain with every stage, event and score along the route.

Flight Stages EGLL to EBLG
Click on a stage to view more detailed information

Departure Taxi

100 %

Taxiing from the parking to the runway took 2 minutes and covered less than 1 nm.

ScoreDescriptionStartProfileEnd
100 %

Average speed 9 kt

0 kt min to max 15 kt

0 12 kt
100 %

Average speed turning corners 0 kt

max 0 kt

0 0 kt
100 %

Average g force 1.00 g

1.00 g min to max 1.00 g

1.00 1.00 g
Info

Average pitch angle -0.0 °

-0.5 ° min to max 0.4 °

0.0 -0.5 °
Info

Average bank angle 0.2 °

0.0 ° min to max 0.5 °

0.0 0.5 °
Info

Battery Master On

at 01:29:10

Info

Engine 1 Started

at 01:29:10

Info

Engine 2 Started

at 01:29:10

Info

Landing Gear Down

at 01:29:10

Info

Flaps Position 2

at 01:29:10

Info

Beacon Lights Switched On

at 01:30:18

Info

Landing Lights Switched On

at 01:30:18

Info

Navigation Lights Switched On

at 01:30:18

Info

Strobe Lights Switched On

at 01:30:18

Info

Taxi Lights Switched On

at 01:30:18

Info

Pitot Heat Switched On

at 01:30:18

Info

Parking Brake On

at 01:30:19

Info

Flaps Position 4

at 01:30:19

Info

Parking Brake Off

at 01:30:21

Departure Runway Entry

Entering runway 27R at EGLL London Heathrow Airport, Average speed was 20 kt.

ScoreDescriptionStartProfileEnd
Info

Average speed 15 kt

11 kt min to max 20 kt

12 20 kt
Info

Average pitch angle -0.7 °

-0.9 ° min to max -0.5 °

-0.5 -0.7 °
Info

Average bank angle 0.2 °

0.0 ° min to max 0.5 °

0.5 0.2 °
Info

Average g force 1.00 g

1.00 g min to max 1.01 g

1.00 1.00 g

Departure Roll

100 %

Departure roll runway 27R at EGLL London Heathrow Airport. Takeoff distance 1,502 m 42 % of runway. Liftoff speed was 184 kt. Local weather - Temperature 18 °C. Wind 32 kt at 227 °. Crosswind: 21 kt Headwind: 24 kt.

ScoreDescriptionStartProfileEnd
100 %

Takeoff distance 1,502 m

42 % of runway

100 %

Liftoff speed was 184 kt

Target 174 kt

100 %

Runway alignment max 1.03 m

0.18 m left to 0.86 m right

-0.40 -0.62 m
100 %

Average g force 1.00 g

0.96 g min to max 1.07 g

1.00 1.07 g
100 %

Takeoff Bounce

Info

Average pitch angle 0.3 °

-0.8 ° min to max 10.1 °

-0.7 10.1 °
Info

Average bank angle 0.4 °

0.0 ° min to max 1.0 °

0.2 1.0 °
Info

Landing Lights Switched Off

at 01:35:14

Info

Taxi Lights Switched Off

at 01:35:14

Info

Flaps Position 2

at 01:35:14

Info

Parking Brake On

at 01:35:39

Info

Taxi Lights Switched On

at 01:35:49

Info

Landing Lights Switched On

at 01:39:48

Info

Flaps Position 3

at 01:59:16

Info

Flaps Position 4

at 02:09:58

Info

Flaps Position 3

at 02:10:05

Info

Flaps Position 2

at 02:10:10

Info

Parking Brake Off

at 02:10:32

Info

Parking Brake On

at 02:10:34

Info

Parking Brake Off

at 02:10:38

Info

Parking Brake On

at 02:10:41

Info

Parking Brake Off

at 02:10:43

Departure Climb 1

97.68 %

Departure climb to 50 ft agl from runway 27R EGLL London Heathrow Airport.

ScoreDescriptionStartProfileEnd
100 %

Heading variation 0.0 °

-0.0 ° min to max 0.1 °

0.1 -0.0 °
100 %

Average speed 190 kt

183 kt min to max 197 kt

184 197 kt
90.71 %

Average bank angle 3.8 °

1.0 ° min to max 5.5 °

1.0 2.9 °
100 %

Average g force 1.20 g

1.07 g min to max 1.23 g

1.07 1.21 g
Info

Average VSI 611 fpm

104 fpm min to max 1,286 fpm

104 1,286 fpm
Info

Average altitude 19 ft agl

0 ft agl min to max 49 ft agl

0 49 ft agl
Info

Average pitch angle 13.0 °

10.2 ° min to max 14.5 °

10.2 14.5 °

Departure Climb 2

98.2 %

Departure climb to 400 ft agl from 27R EGLL London Heathrow Airport.

ScoreDescriptionStartProfileEnd
100 %

Heading variation -0.1 °

-0.2 ° min to max -0.0 °

-0.0 -0.1 °
100 %

Average speed 197 kt

192 kt min to max 203 kt

197 203 kt
92.79 %

Average bank angle 2.2 °

0.0 ° min to max 4.7 °

2.6 4.6 °
100 %

Average g force 1.15 g

1.07 g min to max 1.21 g

1.21 1.11 g
Info

Average VSI 1,852 fpm

1,314 fpm min to max 3,713 fpm

1,314 3,713 fpm
Info

Average altitude 101 ft agl

51 ft agl min to max 349 ft agl

51 349 ft agl
Info

Average pitch angle 15.2 °

14.5 ° min to max 18.7 °

14.5 18.7 °
Info

Taxi Lights Switched Off

at 02:11:42

Info

Landing Gear Up

at 02:11:42

Departure Climb 3

98.48 %

Departure climb to 1,000 ft agl from 27R EGLL London Heathrow Airport.

ScoreDescriptionStartProfileEnd
100 %

Heading variation 0.1 °

-0.1 ° min to max 0.5 °

-0.1 0.5 °
100 %

Average speed 203 kt

200 kt min to max 207 kt

202 201 kt
92.42 %

Average bank angle 3.8 °

2.4 ° min to max 4.9 °

4.2 2.4 °
100 %

Average g force 1.00 g

0.95 g min to max 1.03 g

1.02 0.95 g
100 %

Landing gear up

Info

Average VSI 4,498 fpm

3,985 fpm min to max 4,959 fpm

3,985 4,959 fpm
Info

Average altitude 667 ft agl

416 ft agl min to max 963 ft agl

416 963 ft agl
Info

Average pitch angle 19.7 °

18.9 ° min to max 21.3 °

18.9 21.3 °
Info

Flaps Position 1

at 02:11:54

Enroute Climb

100 %

Enroute climb started overhead Harmondsworth (Greater London, England). Climbing from 1,139 ft asl to 21,924 ft asl, an increase of 20,785 ft in 10 minutes and covering 3 nm.

ScoreDescriptionStartProfileEnd
100 %

Average speed 291 kt

202 kt min to max 321 kt

202 319 kt
100 %

Average bank angle 19.7 °

0.1 ° min to max 31.5 °

2.6 0.4 °
100 %

Average g force 1.07 g

0.79 g min to max 1.28 g

1.00 0.96 g
Info

Average VSI 1,837 fpm

-551 fpm min to max 5,276 fpm

5,052 1,272 fpm
Info

Average altitude 13,568 ft asl

1,139 ft asl min to max 21,924 ft asl

1,139 21,924 ft asl
Info

Average pitch angle 7.0 °

3.8 ° min to max 21.5 °

21.5 3.8 °
Info

Turn coordination 0

0 min to max 0

0 0
Info

Flaps Fully Retracted

at 02:12:06

Info

Landing Lights Switched Off

at 02:17:41

Enroute Level

100 %

Enroute level cruise started overhead Old Windsor (Royal Borough of Windsor and Maidenhead, England) and lasted 10 minutes, covering 68 nm.

ScoreDescriptionStartProfileEnd
100 %

Average altitude 22,011 ft asl

21,948 ft asl min to max 22,097 ft asl

21,948 22,094 ft asl
100 %

Average speed 333 kt

324 kt min to max 339 kt

324 334 kt
100 %

Average bank angle 16.7 °

0.0 ° min to max 31.1 °

0.2 0.1 °
100 %

Average g force 1.06 g

0.96 g min to max 1.27 g

1.01 1.01 g
Info

Turn coordination 0

0 min to max 0

0 0
Info

Average pitch angle 2.4 °

1.9 ° min to max 3.1 °

1.9 2.1 °

Enroute Descent

100 %

Enroute descent started overhead Lydden (Kent, England). Descent from 22,095 ft asl to 21,135 ft asl, a decrease of 960 ft in 2 minutes and covering 15 nm.

ScoreDescriptionStartProfileEnd
100 %

Average speed 331 kt

328 kt min to max 334 kt

334 331 kt
100 %

Average bank angle 0.2 °

0.1 ° min to max 0.5 °

0.5 0.1 °
100 %

Average g force 1.01 g

0.99 g min to max 1.07 g

1.02 1.00 g
Info

Average VSI -521 fpm

-1,330 fpm min to max 20 fpm

20 -54 fpm
Info

Average altitude 21,682 ft asl

21,135 ft asl min to max 22,098 ft asl

22,095 21,135 ft asl
Info

Average pitch angle 1.6 °

0.6 ° min to max 2.3 °

2.1 2.1 °
Info

Turn coordination 0

0 min to max 0

0 0

Enroute Level 2

100 %

Enroute level cruise started 10 miles south east of Deal (Kent, England) and lasted 21 minutes, covering 135 nm.

ScoreDescriptionStartProfileEnd
100 %

Average altitude 21,216 ft asl

21,121 ft asl min to max 21,290 ft asl

21,124 21,270 ft asl
100 %

Average speed 321 kt

306 kt min to max 336 kt

333 307 kt
100 %

Average bank angle 10.0 °

0.0 ° min to max 31.8 °

0.1 9.7 °
100 %

Average g force 1.04 g

0.98 g min to max 1.20 g

1.00 1.01 g
Info

Turn coordination 0

0 min to max 0

0 0
Info

Average pitch angle 2.7 °

2.0 ° min to max 3.6 °

2.2 2.9 °

Enroute Descent 2

91.61 %

Enroute descent started 2 miles north west of Gesves (Wallonia, Belgium). Descent from 21,268 ft asl to 2,655 ft asl, a decrease of 18,613 ft in 7 minutes and covering 34 nm.

ScoreDescriptionStartProfileEnd
79.02 %

Average speed 279 kt

200 kt min to max 346 kt

307 281 kt
100 %

Average bank angle 19.2 °

0.1 ° min to max 32.5 °

12.3 7.7 °
100 %

Average g force 1.07 g

0.91 g min to max 1.39 g

1.01 0.96 g
Info

Average VSI -2,084 fpm

-6,405 fpm min to max 1,011 fpm

-111 411 fpm
Info

Average altitude 10,090 ft asl

2,462 ft asl min to max 21,268 ft asl

21,268 2,655 ft asl
Info

Average pitch angle 1.8 °

-7.4 ° min to max 10.0 °

3.0 4.9 °
Info

Turn coordination 0

0 min to max 0

0 0
Info

Landing Lights Switched On

at 02:55:47

Info

Stall Warning Activated

at 03:00:45

Info

Stall Warning Deactivated

at 03:00:46

Info

Exceeded 250 kn below 10000 ft

at 02:59:19

Info

Exceeded 250 kn below 10000 ft

at 03:01:09

Enroute Level 3

77.5 %

Enroute level cruise started 2 miles north of Riemst (Flanders, Belgium) and lasted 3 minutes, covering 9 nm.

ScoreDescriptionStartProfileEnd
91.68 %

Average altitude 2,489 ft asl

1,492 ft asl min to max 2,930 ft asl

2,660 1,492 ft asl
0 %

Average speed 248 kt

154 kt min to max 352 kt

284 160 kt
100 %

Average bank angle 17.7 °

0.2 ° min to max 31.5 °

9.6 11.1 °
100 %

Average g force 1.06 g

0.92 g min to max 1.22 g

1.00 1.04 g
Info

Turn coordination 0

0 min to max 0

0 0
Info

Average pitch angle 5.7 °

2.0 ° min to max 11.3 °

4.8 3.7 °
Info

Taxi Lights Switched On

at 03:03:24

Info

Flaps Position 1

at 03:03:24

Info

Stall Warning Activated

at 03:03:27

Info

Landing Gear Down

at 03:03:28

Info

Flaps Position 2

at 03:03:35

Info

Stall Warning Deactivated

at 03:03:42

Info

Flaps Position 3

at 03:03:45

Info

Stall Warning Activated

at 03:03:49

Info

Flaps Position 4

at 03:03:50

Info

Flaps Position 5

at 03:03:56

Info

Stall Warning Deactivated

at 03:04:00

Info

Flaps Position 6

at 03:04:02

Info

GPWS Warning Activated

at 03:04:10

Arrival Final 4

98.08 %

Approaching runway 22L at EBLG Liège Airport from 4 nm to 3 nm. Descent from 850 ft agl to 540 ft agl. A decrease of 310 ft in 27 seconds.

ScoreDescriptionStartProfileEnd
100 %

Approach angle 1.9 °

1.7 ° min to max 2.0 °

Target 3.0 °

2.0 1.7 °
100 %

Average speed 144 kt

134 kt min to max 159 kt

159 141 kt
99.31 %

Heading variation -1.9 °

-2.1 ° min to max -1.5 °

-1.5 -2.0 °
90.73 %

Average bank angle 3.3 °

0.3 ° min to max 6.4 °

3.8 3.6 °
100 %

Average g force 1.01 g

0.95 g min to max 1.12 g

1.09 0.99 g
Info

Average VSI -698 fpm

-1,538 fpm min to max -224 fpm

-1,538 -799 fpm
Info

Average altitude 684 ft agl

540 ft agl min to max 850 ft agl

850 540 ft agl
Info

Average pitch angle 7.2 °

4.8 ° min to max 9.4 °

4.8 6.6 °

Arrival Final 3

69.47 %

Approaching runway 22L at EBLG Liège Airport from 3 nm to 2 nm. Descent from 527 ft agl to 190 ft agl. A decrease of 337 ft in 29 seconds.

ScoreDescriptionStartProfileEnd
100 %

Approach angle 1.6 °

0.9 ° min to max 1.8 °

Target 3.0 °

1.7 0.9 °
0 %

Average speed 137 kt

120 kt min to max 151 kt

144 135 kt
94.85 %

Heading variation -2.3 °

-2.7 ° min to max -2.0 °

-2.0 -2.7 °
99.95 %

Average bank angle 1.1 °

0.1 ° min to max 3.0 °

1.7 2.5 °
100 %

Average g force 0.98 g

0.88 g min to max 1.15 g

1.00 0.99 g
Info

Average VSI -717 fpm

-1,848 fpm min to max 354 fpm

-795 -1,848 fpm
Info

Average altitude 408 ft agl

190 ft agl min to max 527 ft agl

527 190 ft agl
Info

Average pitch angle 8.0 °

4.0 ° min to max 11.0 °

6.5 4.0 °
Info

GPWS Warning Deactivated

at 03:04:51

Info

GPWS Warning Activated

at 03:04:57

Info

Stall Warning Activated

at 03:04:59

Info

Stall Warning Deactivated

at 03:05:09

Info

Stall Warning Activated

at 03:05:10

Arrival Final 2

65.4 %

Approaching runway 22L at EBLG Liège Airport from 2 nm to 1 nm. Descent from 160 ft agl to 303 ft agl. A decrease of 143 ft in 25 seconds.

ScoreDescriptionStartProfileEnd
100 %

Approach angle 2.2 °

0.6 ° min to max 3.6 °

Target 3.0 °

0.8 3.0 °
0 %

Average speed 152 kt

137 kt min to max 162 kt

137 153 kt
93.15 %

Heading variation -2.5 °

-2.9 ° min to max -1.8 °

-2.7 -1.8 °
80.41 %

Average bank angle 4.7 °

0.8 ° min to max 10.2 °

5.2 1.2 °
100 %

Average g force 0.99 g

0.66 g min to max 1.30 g

1.01 1.17 g
Info

Average VSI 290 fpm

-1,866 fpm min to max 2,187 fpm

-1,866 -1,387 fpm
Info

Average altitude 303 ft agl

104 ft agl min to max 469 ft agl

160 303 ft agl
Info

Average pitch angle 8.9 °

0.6 ° min to max 16.2 °

5.8 5.7 °
Info

GPWS Warning Deactivated

at 03:05:15

Info

Stall Warning Deactivated

at 03:05:15

Info

GPWS Warning Activated

at 03:05:32

Arrival Final 1

85.6 %

Approaching runway 22L at EBLG Liège Airport from 1 nm to 0 nm. Descent from 288 ft agl to 129 ft agl. A decrease of 159 ft in 16 seconds.

ScoreDescriptionStartProfileEnd
54.13 %

Approach angle 4.2 °

3.0 ° min to max 5.1 °

Target 3.0 °

3.0 5.0 °
100 %

Average speed 173 kt

157 kt min to max 181 kt

157 167 kt
76.8 %

Heading variation -0.7 °

-1.1 ° min to max -0.5 °

-1.1 -0.5 °
97.06 %

Average bank angle 2.0 °

0.0 ° min to max 5.0 °

5.0 2.1 °
100 %

Average g force 0.98 g

0.69 g min to max 1.21 g

1.21 1.01 g
Info

Average VSI -611 fpm

-1,417 fpm min to max 264 fpm

-1,034 -1,417 fpm
Info

Average altitude 246 ft agl

129 ft agl min to max 288 ft agl

288 129 ft agl
Info

Average pitch angle 2.0 °

-1.0 ° min to max 5.8 °

5.8 -0.0 °
Info

GPWS Warning Deactivated

at 03:05:41

Arrival Landing

95.76 %

Landing on runway 22L at EBLG Liège Airport, runway length 3,039 m. Good threshold height. Threshold speed was good at 163 kt.

ScoreDescriptionStartProfileEnd
100 %

Threshold speed was good at 163 kt.

Target 162 kt

100 %

Target 50 ft agl

83.04 %

Landing and flare profile

100 %

Heading variation -0.4 °

-0.4 ° min to max -0.4 °

-0.4 -0.4 °
100 %

Average bank angle 1.9 °

0.0 ° min to max 2.8 °

1.6 2.4 °
100 %

Average g force 1.09 g

0.95 g min to max 1.16 g

1.16 0.95 g
Info

Average speed 156 kt

153 kt min to max 163 kt

163 154 kt
Info

Average VSI -494 fpm

-1,199 fpm min to max -68 fpm

-1,199 -70 fpm
Info

Average altitude 18 ft agl

10 ft agl min to max 46 ft agl

46 10 ft agl
Info

Average pitch angle 5.5 °

3.6 ° min to max 6.9 °

3.7 5.0 °

Arrival Touchdown

89.64 %

Touchdown distance was good at 441 m. Touchdown speed at 154 kt was good. Touchdown rate was excellent at -70 fpm. Runway touchdown position was significantly misaligned by 19.0 m from centreline. Local weather - Temperature 13 °C. Wind 20 kt at 189 °. Crosswind: 12 kt Headwind: 17 kt.

ScoreDescriptionStartProfileEnd
100 %

Touchdown VSI was -70 fpm.

100 %

Touchdown distance was 441 m

Target 457 m

100 %

Speed at touchdown 154 kt

Target below 158 kt

41.9 %

Runway alignment max 18.99 m

18.92 m right

-18.74 -18.98 m
100 %

Average bank angle 1.9 °

1.4 ° min to max 2.4 °

2.4 1.4 °
100 %

Average g force 1.06 g

0.95 g min to max 1.11 g

0.95 1.11 g
100 %

Landing Bounce

Info

Average speed 151 kt

148 kt min to max 154 kt

154 148 kt
Info

Average pitch angle 5.4 °

5.0 ° min to max 5.6 °

5.0 5.5 °

Arrival Rollout

73.88 %

Total landing distance 946 m, 31 % of runway. Runway rollout alignment was misaligned by 19.0 m from centreline.

ScoreDescriptionStartProfileEnd
100 %

Landing distance 946 m

31 % of runway.

41.96 %

Runway alignment max 18.97 m

0.00 m left to 18.97 m right

-18.97 -3.01 m
100 %

Average g force 1.00 g

0.92 g min to max 1.11 g

1.11 0.97 g
Info

Average speed 125 kt

72 kt min to max 131 kt

131 72 kt
Info

Average pitch angle 2.6 °

-0.7 ° min to max 5.5 °

5.5 -0.4 °
Info

Average bank angle 1.2 °

0.3 ° min to max 2.0 °

1.3 0.6 °

Runway Exit

Exiting runway, average speed 28 kt

ScoreDescriptionStartProfileEnd
Info

Average speed 12 kt

7 kt min to max 59 kt

59 9 kt
Info

Average pitch angle -0.3 °

-0.6 ° min to max -0.2 °

-0.4 -0.6 °
Info

Average bank angle 0.1 °

0.0 ° min to max 0.4 °

0.4 0.1 °
Info

Average g force 1.00 g

0.98 g min to max 1.01 g

0.99 1.00 g
Info

Parking Brake On

at 03:06:47

Takeoff on runway 27R at EGLL London Heathrow Airport in the Boeing 777-300
98.87 %
100 %
Taxi
Taxiing from the parking to the runway took 2 minutes and covered less than 1 nm.
Taxi Lights
100 %
Switched On
Speed
100 %
30 15 0
Turn Speed
100 %
30 15 0
G
100 %
1.25 1 0.75
Bank
Info
1 0.5 0
Pitch
Info
1 0.5 0
100 %
Takeoff Roll
Departure roll runway 27R at EGLL London Heathrow Airport. Takeoff distance 1,502 m 42 % of runway. Liftoff speed was 184 kt. Local weather - Temperature 18 °C. Wind 32 kt at 227 °. Crosswind: 21 kt Headwind: 24 kt.
Takeoff Distance
100 %
Roll distance of 1,502 m using 41.83 % of runway
Liftoff Speed
100 %
Liftoff speed was 184 kn - Target 174 kn
Alignment
100 %
0.18 m left to 0.86 m right
Bounce
100 %
No Bounce Detected
Strobe Lights
100 %
Switched On
Landing Lights
100 %
Switched On
G
100 %
1.5 1 0.5
Speed
Info
190 95 0
Bank
Info
1 0.5 0
Pitch
Info
11 5.5 0
02505007501,0001,2501,5001,7502,0002,2502,5002,7503,000-25-20-15-10-50510152025 Runway Distance m Runway Alignment to End of Runway m
97.68 %
Climb 1
Departure climb to 50 ft agl from runway 27R EGLL London Heathrow Airport.
Heading
100 %
2 0 -2
Speed
100 %
200 190 180
Bank
90.71 %
6 3.5 1
G
100 %
1.5 1 0.5
Pitch
Info
15 13 10
Climb Rate
Info
1,300 650 0
98.2 %
Climb 2
Departure climb to 400 ft agl from 27R EGLL London Heathrow Airport.
Heading
100 %
2 0 -2
Speed
100 %
210 200 190
Bank
92.79 %
5 2.5 0
G
100 %
1.5 1 0.5
Pitch
Info
19 17 14
Climb Rate
Info
3,800 2,500 1,200
98.48 %
Climb 3
Departure climb to 1,000 ft agl from 27R EGLL London Heathrow Airport.
Heading
100 %
2 0 -2
Speed
100 %
210 205 200
Bank
92.42 %
5 3.5 2
G
100 %
1.5 1 0.5
Pitch
Info
22 20 18
Climb Rate
Info
5,000 4,400 3,800
02505007501,0001,2501,5001,7502,0002,2502,5002,7503,0000175350525700875 Runway Distance m Height at End of Runway ft
00.050.090.140.190.230100200300400500600700800 Climb Distance NM Climb Profile to 1,000 ft
00.050.090.140.190.23-60-48-36-24-1201224364860 Climb Distance NM Runway Alignment (in m) to 1,000 ft
Landing on runway 22L at EBLG Liège Airport in the Boeing 777-300
Landing Score 86.22 %
Landing Summary

The Boeing 777-300 aircraft successfully landed at EBLG Liège Airport, achieving an overall score of 86.2%. The final approach to runway 22L was initiated from the north east, heading 225.0° at a distance of 4 nautical miles and an altitude of 850 feet above ground level (agl). The aircraft's approach was characterized by a good threshold height, indicating that the pilots maintained a suitable altitude prior to touchdown.

Upon landing, the aircraft touched down on runway 22L, which has a length of 3,039 meters. The threshold speed was also good, reaching 163 knots, and the touchdown distance was within acceptable limits at 441 meters. The touchdown speed of 154 knots was also satisfactory, and the touchdown rate of -70 feet per minute (fpm) was excellent, indicating a smooth and controlled descent.

However, there were some notable deviations from ideal performance. The runway touchdown position was significantly misaligned by 19.0 meters from the centerline, which may have been due to factors such as crosswind or pilot error. The local weather conditions at the time of landing included a temperature of 13°C, with a wind speed of 20 knots at 189°. The crosswind component was 12 knots, while the headwind component was 17 knots.

The total landing distance of 946 meters was 31% of the runway length, which is within acceptable limits. However, the runway rollout alignment was also misaligned by 19.0 meters from the centerline, which may have been due to the same factors that contributed to the initial touchdown position deviation. Overall, while the landing was successful, there were some areas for improvement in terms of alignment and control.

98.08 %
Final 4
Approaching runway 22L at EBLG Liège Airport from 4 nm to 3 nm. Descent from 850 ft agl to 540 ft agl. A decrease of 310 ft in 27 seconds.
Glideslope
100 %
Excellent glideslope alignment
Heading
99.31 %
Poor heading alignment
Glideslope
100 %
4 3 2
IAS
100 %
159 144 130
Heading
99.31 %
0.5 0 -0.5
Bank
90.73 %
10 5 0
G
100 %
1.5 1 0.5
Descent Rate
Info
-225 -912 -1,600
33.253.53.7545005506006507007508008509009501,0001,0501,1001,1501,200 Distance to Touchdown NM Approach Height ft
69.47 %
Final 3
Approaching runway 22L at EBLG Liège Airport from 3 nm to 2 nm. Descent from 527 ft agl to 190 ft agl. A decrease of 337 ft in 29 seconds.
Glideslope
100 %
Excellent glideslope alignment
Heading
94.85 %
Poor heading alignment
Glideslope
100 %
4 3 2
IAS
0 %
151 136 120
Heading
94.85 %
0.5 0 -0.5
Bank
99.95 %
4 2 0
G
100 %
1.5 1 0.5
Descent Rate
Info
355 -773 -1,900
22.252.52.753200250300350400450500550600650700750800850900 Distance to Touchdown NM Approach Height ft
65.4 %
Final 2
Approaching runway 22L at EBLG Liège Airport from 2 nm to 1 nm. Descent from 160 ft agl to 303 ft agl. A decrease of 143 ft in 25 seconds.
Glideslope
100 %
Excellent glideslope alignment
Heading
93.15 %
Poor heading alignment
Glideslope
100 %
4 3 2
IAS
0 %
162 146 130
Heading
93.15 %
0.5 0 -0.5
Bank
80.41 %
11 5.5 0
G
100 %
1.5 1 0.5
Descent Rate
Info
2,187 143 -1,900
11.251.51.75250100150200250300350400450500550 Distance to Touchdown NM Approach Height ft
85.6 %
Final 1
Approaching runway 22L at EBLG Liège Airport from 1 nm to 0 nm. Descent from 288 ft agl to 129 ft agl. A decrease of 159 ft in 16 seconds.
Glideslope
54.13 %
Poor descent path above glideslope limit
Heading
76.8 %
Poor heading alignment
Glideslope
54.13 %
4 3 2
IAS
100 %
181 166 150
Heading
76.8 %
0.5 0 -0.5
Bank
97.06 %
6 3 0
G
100 %
1.5 1 0.5
Descent Rate
Info
265 -618 -1,500
00.250.50.751050100150200250 Distance to Touchdown NM Approach Height ft
95.76 %
Landing
Landing on runway 22L at EBLG Liège Airport, runway length 3,039 m. Good threshold height. Threshold speed was good at 163 kt.
Height
100 %
Good threshold height. Target 50 ft agl
Speed
100 %
Threshold speed was good at 163 kt. Target 162 kt
Flare
83.04 %
Very good landing flare
Heading
100 %
0.25 0 -0.25
Bank
100 %
3 1.5 0
G
100 %
1.5 1 0.5
IAS
Info
163 157 150
Pitch
Info
7 5 3
Descent Rate
Info
-68 -634 -1,200
07515022530037545052560067508.9118273645 Runway Distance m Landing Height ft
89.64 %
Touchdown
Touchdown distance was good at 441 m. Touchdown speed at 154 kt was good. Touchdown rate was excellent at -70 fpm. Runway touchdown position was significantly misaligned by 19.0 m from centreline. Local weather - Temperature 13 °C. Wind 20 kt at 189 °. Crosswind: 12 kt Headwind: 17 kt.
Landed with a 12 kt crosswind, well done!
Touchdown
100 %
Touchdown rate was excellent at -72 ft/m.
Speed
100 %
Touchdown speed at 154 kt was good. Target below 158 kn
Distance
100 %
Touchdown distance was good at 441 m.
Alignment
41.9 %
Runway touchdown position was significantly misaligned by 19.0 m from centreline.
Bank
100 %
Bank angle 1.9 °
G
100 %
G 1.06 g
Bounce
100 %
No Bounce Detected
73.88 %
Rollout
Total landing distance 946 m, 31 % of runway. Runway rollout alignment was misaligned by 19.0 m from centreline.
G
100 %
Landing distance 946 m using 31.14 % of runway
Alignment
41.96 %
Runway rollout alignment was misaligned by 19.0 m from centreline.
G
100 %
1.25 1 0.75
IAS
Info
149 120 90
Bank
Info
3 1.5 0
Pitch
Info
6 3 0
02004006008001,0001,2001,4001,6001,8002,0002,2002,4002,6002,8003,000 Runway Distance m Runway Width m
Metrics

Drag to zoom · double-click to reset · hover for values

More Flights Like This
EGLL → WMKK
London Heathrow Airport to Kuala Lumpur International Airport
Boeing 777-300
15 Jul 2026 · 6,020 nm 95%
EGLL → FACT
London Heathrow Airport to Cape Town International Airport
Airbus A350-1000
07 Jul 2026 · 5,343 nm 98%
EDDS → EBLG
Stuttgart Airport to Liège Airport
Boeing 777-300
18 Jan 2026 · 202 nm 80%
LFPO → LXGB
Paris-Orly Airport to Gibraltar Airport
Boeing 777-300
17 Jan 2026 · 847 nm 94%
More flights at EGLL · More flights at EBLG · More Boeing 777-300 flights · Browse all flights