Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 11 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Track the centreline through touchdown using small rudder corrections against a point at the far end of the runway.
What happened: The aircraft touched down off the centreline at 6.6 m, and drifting off centreline at touchdown usually carries through into the rollout, as it did here with alignment reaching 20 m.
Watch for: Watch runway centreline position, keeping deviation inside the limit through touchdown and rollout.
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 13 stages, 11 scored
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with six checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,690 m of the approach.
Plan view — the first 1,690 m of the 3,472 m runway, to the same scale as the side view.
The 334 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The aircraft taxied from the parking area to runway 35 at UBBB Heydar Aliyev International Airport in 5 minutes, covering less than 1 nm.
During the departure roll on runway 35, the aircraft used 664 m of runway, representing 21 % of the available length, and lifted off at 138 kt. Ambient conditions were 29 °C with a wind of 31 kt from 340°, providing a 29 kt headwind and a 10 kt crosswind component.
The climb commenced overhead UBBB, climbing from 952 ft asl to 22 705 ft asl, an altitude gain of 21 753 ft achieved in 11 minutes while covering 53 nm.
Descent began 6 mi north-east of Qobustan, descending from 23 014 ft asl to 2 615 ft asl, a loss of 20 399 ft in 14 minutes and traversing 62 nm.
The final approach to runway 34 at UBBQ Gabala International Airport was executed from the south on a heading of 347.0° at 4 nm and 1 474 ft agl.
Landing on runway 34 was performed with a threshold speed of 134 kt; touchdown occurred 146 m beyond the touchdown zone at 129 kt and a firm rate of minus 400 fpm. The touchdown point was offset 5.7 m from the centreline. Local weather was 31 °C with a wind of 6 kt from 310°, giving a 5 kt headwind and a 3 kt crosswind. The total landing roll measured 1 837 m, equivalent to 53 % of the runway.
Rollout alignment was noted to be 19.9 m off the centreline before the aircraft exited the runway.
In total, the flight covered 121 nm, lasted 30 minutes, and consumed 440 kg of fuel.
The aircraft, identified only as Unknown, executed a final approach to runway 34 at UBBQ Gabala International Airport from the south on a heading of 347.0° at 4 nm and 1,474 ft agl; the approach was assessed as unstable at the 1,000 ft gate because the sink rate was too high, with ambient conditions of 31 °C, wind 6 kt from 310°, a 3 kt cross-wind component and a 5 kt head-wind.
At threshold the height was reported as good and the threshold speed was good at 134 kt, confirming the aircraft met the required speed for touchdown.
Touchdown occurred 146 m beyond the touchdown zone with a speed of 129 kt judged good; the aircraft settled with a firm rate of minus 400 fpm and the touchdown point was slightly misaligned by 5.7 m from the centreline, using a total landing distance of 1,837 m (53 % of the 3,470 m runway).
During rollout the aircraft’s alignment drifted, ending 19.9 m off the centreline.
Maintain a controlled sink rate to achieve a stabilised approach within limits and monitor centreline tracking throughout rollout to reduce lateral deviation; these adjustments will refine an already strong performance reflected by the 87.9 % score.