Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 18 stages, 17 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,130 m runway, to the same scale as the side view.
Touched down 591 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Overall, it sounds like this aircraft landing had some strengths and areas for improvement. The Approach Phase had good heading alignment and on-target speed, but the descent path was below the glideslope limit. During the Landing Phase, the threshold height was too low but the landing flare was good. In the Touchdown Phase, the touchdown rate was fair, speed was on target, and runway alignment was very good, despite landing with a 3 knot tailwind. The Rollout Phase also had good runway alignment.
To improve future landings, I would recommend focusing on maintaining a proper descent path during the Approach Phase, ensuring the threshold height is correct, and paying attention to touchdown rate and distance during the Touchdown Phase. It's also important to be mindful of tailwind conditions and possibly consider a go-around in those situations. Additionally, continue to work on maintaining good runway alignment throughout the landing process. Overall, with some adjustments and practice, I'm confident that future landings will continue to improve. Great job on the aspects that went well!
Scroll or drag the slider to zoom · double-click to reset · hover for values