Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 6.6 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Begin raising the nose earlier, by 11 ft, so the flare has time to arrest the sink before touchdown.
What happened: The flare began late at 2.2 ft, 9.1 ft below the normal band, and a late flare like this usually leaves too little time to arrest the sink before touchdown.
Watch for: Watch radio altitude and start the flare in the normal band, around 11 ft.
Arrive slow and the sink rate at the threshold is already above schedule, the flare is short because there is no energy to extend it, and the touchdown is hard in a way that feels exactly like a late flare. Diagnosing a slow arrival as a late flare is the catastrophic misread: you respond by flaring earlier, which bleeds more speed, which makes the next one worse. The tiebreaker is threshold speed against VRef, not feel. Never diagnose a flare without it.
Read more in Flare TimingStart to finish · 14 stages, 12 scored
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,192 m runway, to the same scale as the side view.
The 191 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Boeing 737-700 taxied from the parking area to runway 33 at LEPP Pamplona Airport in 2 minutes, covering less than 1 nm.
During the departure roll on runway 33, the aircraft accelerated to a liftoff speed of 142 kt and left the ground after traveling 1,289 m, which represented 68 % of the runway length; ambient temperature was 22 °C with a wind of 2 kt from 010°, a 1 kt cross-wind component and a 1 kt head-wind component.
The climb commenced 1 mile southeast of Baranain, climbing from 2,450 ft asl to 27,761 ft asl - an altitude gain of 25,311 ft - over 9 minutes while covering 60 nm.
Level cruise began 1 mile north of Galdakao and was maintained for 9 minutes, during which the aircraft flew 57 nm.
Descent started 4 miles west of Suances, descending from 26,997 ft asl to 1,669 ft asl - a loss of 25,328 ft - in 10 minutes and traversing 80 nm.
The final approach to runway 29 at LEAS Asturias Airport was flown from the east on a heading of 288.0° at 4 nm and 1,262 ft agl.
Landing on runway 29, which is 2,192 m long, occurred with a threshold speed of 134 kt; touchdown was recorded at 194 m from the threshold at 133 kt, a hard rate of minus 432 fpm, and a lateral deviation of 6.1 m from the centreline; the runway touchdown position was slightly misaligned by 11.3 m from the centreline, and the total landing roll measured 1,311 m, representing 60 % of the runway.
The rollout concluded with the aircraft aligned slightly off centreline by 11.3 m before exiting the runway.
In total, the flight covered 203 nm, required 32 minutes of airborne time, and consumed 1,918 kg of fuel.
The final approach to runway 29 at LEAS Asturias Airport was flown from the east on a heading of 288.0° at 4 nm and 1,262 ft agl. The approach was assessed as stabilised at the 1,000 ft gate, with gear, flaps, sink rate, glideslope and centreline all within limits.
During the threshold and flare phase the threshold speed was good at 134 kt and the touchdown distance was good at 194 m. The local temperature was 21 °C with wind 5 kt from 274°, giving a 5 kt headwind and 1 kt cross-wind component.
Touchdown occurred at a speed of 133 kt, noted as a little fast, with a hard touchdown rate of minus 432 fpm. The runway touchdown point was slightly off centreline by 6.1 m.
Rollout continued for a total landing distance of 1,311 m, representing 60 % of the 2,192 m runway, and the aircraft was slightly misaligned on the runway by 11.3 m from centreline.
With a final score of 94.0 % the landing was strong overall; refining the flare to reduce touchdown speed and rate will smooth the touchdown, and maintaining tighter centreline control during rollout will eliminate the small lateral deviation.
Scroll or drag the slider to zoom · double-click to reset · hover for values