Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 5.4 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Apply steady, continuous back pressure through the flare to arrest the sink smoothly and hold the normal profile, rather than letting it drift.
What happened: The flare did not hold its target profile, with the sink most arrested at 6.2 ft, and this flight then touched down at 342 fpm of sink - a firm arrival. An unsettled flare profile like this usually carries through to a firmer touchdown.
Watch for: Vertical speed indicator: a smooth, steadily decreasing sink rate through the flare to touchdown.
Arrive slow and the sink rate at the threshold is already above schedule, the flare is short because there is no energy to extend it, and the touchdown is hard in a way that feels exactly like a late flare. Diagnosing a slow arrival as a late flare is the catastrophic misread: you respond by flaring earlier, which bleeds more speed, which makes the next one worse. The tiebreaker is threshold speed against VRef, not feel. Never diagnose a flare without it.
Read more in Flare TimingStart to finish · 18 stages, 16 scored
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway.
At the 500 ft gate: speed below the reference speed.
The approach, gate by gate
Side view — the last 1,561 m of the approach.
Plan view — the first 1,561 m of the 3,665 m runway, to the same scale as the side view.
Touched down 626 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The flight began with a taxiing period from the parking to the runway, which took 10 minutes and covered a distance of 3 nautical miles. The aircraft, a FWB Citilink PK-GTI, then departed from runway 27 at WADD Ngurah Rai (Bali) International Airport. The takeoff distance was 1,696 meters, which accounted for 57% of the runway. The aircraft lifted off at a speed of 150 knots.
The local weather conditions at the time of departure were characterized by a temperature of 30 degrees Celsius, with a wind speed of 5 knots at 230 degrees. The crosswind was 3 knots, while the headwind was 4 knots. As the aircraft took off, it began its enroute climb, which started 1 mile west of WADD Ngurah Rai (Bali) International Airport. The climb took 22 minutes and covered a distance of 105 nautical miles, during which the aircraft ascended from 1,015 feet above sea level to 39,470 feet above sea level, an increase of 38,454 feet.
Following the enroute climb, the aircraft entered a level cruise phase, which began 33 miles south of WART Trunojoyo Airport Sumenep-Madura Island. This phase lasted for 43 minutes and covered a distance of 313 nautical miles. The aircraft then started its enroute descent, which began 35 miles northeast of Indramayu. The descent took 25 minutes and covered a distance of 123 nautical miles, during which the aircraft descended from 39,476 feet above sea level to 1,277 feet above sea level, a decrease of 38,199 feet.
The final approach to runway 25L at WIII Soekarno-Hatta International Airport was made from the east, with a heading of 247.0 degrees at 4 nautical miles and 1,236 feet above ground level. The aircraft landed on the runway, which had a length of 3,665 meters. The threshold height at 57 feet above ground level was slightly above the target, while the threshold speed was 132 knots. The touchdown point was 213 meters beyond the touchdown zone, with a touchdown speed of 127 knots and a touchdown rate of -243 feet per minute. The runway touchdown position was slightly misaligned by 3.3 meters from the centerline.
The local weather conditions at the time of landing were characterized by a temperature of 24 degrees Celsius, with a wind speed of 3 knots at 170 degrees. The crosswind was 3 knots, while the headwind was 1 knot. The total landing distance was 1,483 meters, which accounted for 40% of the runway. The runway rollout alignment was perfect.
The final phase of the flight involved taxiing to the parking from the runway, which took 16 minutes and covered a distance of 1 nautical mile. The total flight distance was 552 nautical miles, which was covered in 112 minutes. The aircraft used 3,506 kilograms of fuel during the flight.
The aircraft, FWB Citilink PK-GTI, successfully landed on runway 25L at WIII Soekarno-Hatta International Airport with a score of 94.0%. The final approach was initiated from the east, heading 247.0° at a distance of 4 nautical miles and an altitude of 1,236 feet above ground level (agl). The aircraft was on a standard approach path, with the threshold height slightly above the target, indicating a minor deviation from the ideal approach.
Upon touchdown, the aircraft landed 213 meters beyond the touchdown zone, which is a relatively minor deviation. The touchdown speed was 127 knots, which is slightly below the target threshold speed of 132 knots. The touchdown rate of -243 feet per minute (fpm) was considered fair, indicating a relatively smooth touchdown. However, the runway touchdown position was slightly misaligned by 3.3 meters from the centerline, which may require some adjustments during the rollout phase.
The local weather conditions were favorable, with a temperature of 24°C and a wind speed of 3 knots at 170°. The crosswind component was minimal at 3 knots, while the headwind component was 1 knot. These conditions contributed to a relatively smooth landing.
The total landing distance was 1,483 meters, which is 40% of the runway length. This is a relatively short landing distance, indicating that the aircraft was able to touch down and stop within a reasonable distance. The runway rollout alignment was perfect, indicating that the aircraft was able to maintain its alignment and direction during the rollout phase.
Overall, the landing was considered successful, with a score of 94.0%. While there were some minor deviations from the ideal approach and touchdown, the aircraft was able to touch down safely and maintain its alignment during the rollout phase.
Scroll or drag the slider to zoom · double-click to reset · hover for values