Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 15 stages, 13 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 5,000 ft of the approach.
Plan view — the first 5,000 ft of the 8,901 ft runway, to the same scale as the side view.
Touched down 1,767 ft past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Taxiing from the parking area to the runway at Phoenix Sky Harbor International Airport took approximately 6 minutes, covering a distance of less than 1 nautical mile. The Boeing 737-800 then began its departure roll on runway 25R, utilizing 4,752 feet, or 46% of the runway, to achieve liftoff at a speed of 146 knots. Local weather conditions at the time of departure featured a temperature of 86°F, with a 10-knot headwind and a 3-knot crosswind.
As the aircraft climbed out of Phoenix, it began its enroute climb 1 mile east of Central City, Arizona, reaching an altitude of 31,991 feet above sea level in 14 minutes, covering a distance of 88 nautical miles. The climb was characterized by a significant increase in altitude, totaling 29,921 feet. Following the climb, the aircraft entered a 16-minute level cruise, covering 113 nautical miles, before beginning its enroute descent overhead Twentynine Palms Airport in California. The descent, which lasted 23 minutes, covered 119 nautical miles and resulted in a decrease of 30,587 feet in altitude. The aircraft then began its final approach to runway 24R at Los Angeles International Airport, touching down on the runway after a total landing distance of 4,124 feet, or 46% of the runway length.
The landing was characterized by a smooth touchdown rate of -149 feet per minute and a touchdown speed of 128 knots. The runway touchdown position was slightly misaligned, deviating 20 feet from the centerline. Following the landing, the aircraft taxied to the parking area, covering a distance of 1 nautical mile in 9 minutes. The total flight distance was 328 nautical miles, with a total flight time of 70 minutes and a fuel consumption of 6,469 pounds.
The Boeing 737-800 touched down on runway 24R at KLAX Los Angeles International Airport with a good threshold height, allowing the crew to maintain a stable approach. The threshold speed of 138 kt was well within the acceptable range, indicating a well-executed approach. As the aircraft made contact with the runway, the touchdown speed of 128 kt was also within the desired parameters, and the touchdown rate of -149 fpm was smooth, minimizing the impact on the aircraft's structure.
The touchdown point was located 388 ft beyond the touchdown zone, which, although not ideal, was not considered a significant deviation. The runway touchdown position was slightly misaligned by 20 ft from the centreline, but this was quickly corrected during the rollout phase. The local weather conditions, with a temperature of 64 °F and a 12 kt headwind, contributed to a relatively stable approach. The crosswind component of 3 kt was minimal, allowing the crew to maintain control throughout the approach.
The total landing distance of 4,124 ft was 46% of the runway length, which is within the acceptable range. The runway rollout alignment was very good, with the aircraft maintaining a consistent path along the centreline. Overall, the landing was considered satisfactory, with a score of 97.6%. The crew's ability to maintain a stable approach and correct minor deviations during the rollout phase was commendable, resulting in a safe and efficient landing.
Scroll or drag the slider to zoom · double-click to reset · hover for values