Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 12 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Use small rudder inputs against a point at the far end of the runway to hold the centreline during rollout.
What happened: During the rollout the aircraft drifted 9.5 m off the centreline.
Watch for: Runway centreline marks: hold the aircraft tracking straight down the centreline through rollout
See Arrival Rollout
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 12 stages, 10 in the score
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
At the 1,000 ft gate: centreline 1.5° off, against a 1° limit.
At the 500 ft gate: sink rate 1,478 fpm, more than the glideslope needed.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,284 m runway, to the same scale as the side view.
The 380 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Boeing 777F taxied to runway 05R at NZAA Auckland International Airport and commenced its departure roll. The aircraft used a takeoff distance of 1,306 m, representing 40 % of the runway, and rotated at 136 kt. Local conditions were 17 °C with a wind of 6 kt from 30°, including a 4 kt cross-wind component and a 4 kt head-wind component.
Climb began overhead the airport, with the airplane ascending from 946 ft asl to 1,452 ft asl, an increase of 506 ft in 1 minutes while covering 2 nm.
Cruise was initiated one mile south-west of Wiri and continued for 5 minutes, during which the aircraft travelled 14 nm at level flight.
During final approach to runway 05R, the descent proceeded from 1,404 ft agl to 48 ft agl in 100 seconds, meeting the stabilisation gates criteria.
Touchdown occurred on runway 05R, whose length is 3,284 m, with a threshold speed of 134 kt. The aircraft landed 380 m down the runway at 126 kt, with a touchdown rate of minus 233 fpm and a lateral deviation of 3.1 m from the centreline. Weather at the time was 15 °C with a wind of 4 kt from 30°, a 3 kt cross-wind and a 3 kt head-wind.
The total landing distance recorded was 884 m, equivalent to 27 % of the runway, and the rollout was slightly misaligned by 9.5 m from the centreline.
In summary, the flight covered 22 nm, required 9 minutes of elapsed time, and consumed 34,626 kg of fuel.
Scroll or drag the slider to zoom · double-click to reset · hover for values