Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Hold the approach speed
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 26 stages, 25 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,273 m runway, to the same scale as the side view.
The 461 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Congratulations on achieving a landing score of 89.2%! Your performance during the Approach Phase, although with room for improvement, showcased areas of strength and areas needing attention. The poor descent path below glideslope limit and lower speed than target are areas to focus on to ensure a smoother descent without risking stalling.
Moving on to the Landing Phase, your slight overshoot of the threshold height was balanced out by a perfect landing flare, showing your ability to make adjustments in real-time. This attention to detail will serve you well in future landings.
In the Touchdown Phase, your smooth touchdown rate and on-target speed demonstrate your ability to maintain control and execute a successful landing. Landing inside the touchdown zone and only 6.0 meters from the centerline shows precision and skill.
Finally, in the Rollout Phase, while your runway alignment was slightly off at 5.6 meters from the centerline, this is an area that can be easily improved with practice and focus.
Overall, your performance was commendable, with clear strengths demonstrated in various phases of the landing process. Keep up the good work and continue to fine-tune your skills to achieve even better results in the future. Well done!
Scroll or drag the slider to zoom · double-click to reset · hover for values