Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Arrival
Make small rudder corrections against a fixed point at the far end of the runway to hold the centreline.
What happened: You drifted off the centreline on the approach.
Watch for: Runway centreline: tracked all the way to the threshold.
See Arrival Approach
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 16 stages, 14 in the score
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate for a circuit: seven checks where the approach path is 300 ft above the runway. The 1,000 ft gate is an instrument-approach check and does not apply. These checks are the approach's score.
At the 300 ft gate: centreline 4.0° off, against a 1° limit and wings 10° of bank, against a 10° limit.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,866 m runway, to the same scale as the side view.
The 302 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Cessna CT206G departed Inverness Airport (EGPE) from runway 23, applying a take-off roll of 312 m which represented 17 % of the available runway. Rotation was achieved at 64 kt. Ambient conditions were 15 °C with a wind from 269° at 2 kt, including a 1 kt cross-wind component and a 2 kt head-wind component.
During the descent phase the aircraft reduced altitude from 399 ft agl to 35 ft agl in 46 seconds while maintaining the prescribed glide path and meeting the stabilisation gate criteria.
The approach sequence began with a left-hand pattern entry from runway 23, covering less than 1 nm in 23 seconds, followed by a left-hand cross-wind segment of less than 1 nm in 15 seconds. The downwind turn spanned 1 nm with an angle to the runway’s far end of 66.8°, after which the downwind leg extended 2 nm in 64 seconds. The base-leg turn covered 1 nm at an angle of 55.1°, and the base leg itself was less than 1 nm in 40 seconds. The final turn was completed in less than 1 nm over 26 seconds before the aircraft entered the final approach.
Landing was executed on runway 23, whose total length is 1,866 m. The threshold speed was recorded slightly above target at 72 kt. Touchdown occurred 302 m down the runway at a speed of 58 kt, with a vertical speed of minus 11 fpm and perfect alignment to the runway centreline. The total landing distance measured 477 m, representing 26 % of the runway length.
Rollout proceeded with the aircraft remaining aligned to the runway centreline throughout the deceleration phase, confirming a perfect runway-rollout alignment.
In total the flight covered 7 nm and consumed 2 kg of fuel.
Scroll or drag the slider to zoom · double-click to reset · hover for values