Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Level the wings with coordinated aileron to hold 7.9° of bank out of the climb.
What happened: The pilot held 7.9° of bank during the climb out, and excess bank like this usually carries a heading drift into the next climb segment.
Watch for: Attitude indicator and heading bug, keeping bank near wings level so heading holds steady.
Arrival
Keep the back pressure coming through the flare so the sink is arrested before the wheels meet the runway.
What happened: Touchdown g reached 0.4 g, and a firm arrival like this usually feeds through into a more pronounced g reading during rollout, which matched here at 0.5 g.
Watch for: Vertical speed indicator: a smooth, gentle rate at touchdown
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 20 stages, 18 in the score
Events
Events
Events
Events
Events
Events
Events
Taxi out
The roll
The nose wandered in the climb
From 35 ft to the end of the climb the nose moved between 5.8° and 18.5°, and the speed between 55 kt and 84 kt.
Once clear of the runway the nose moved through a wide range, and the speed moved with it. Set the climb attitude, hold it and trim, and give the speed a few seconds to settle before correcting it with a degree or two of pitch. Chasing the airspeed with large pitch changes makes it wander more.
Liftoff and climb
Plan view the roll down the 897 m runway.
Rolled from 76 m in, drifted right of the centreline, 3.1 m at the widest, and lifted off 2.9 m right, in 6 kn of crosswind from the right. Airborne 35 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way.
Side view from the start of the roll to the end of Climb 3 at 516 ft.
Reached 35 ft with 478 m of runway left; gear up at 95 ft, inside the 400 ft that gets full marks; then climbing at 910 fpm on average to 516 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The gear-up ring is coloured by its mark. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The figure at liftoff is the pitch then. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The ring on the airspeed is where it fell lowest after liftoff. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
At the 1,000 ft gate: gear still up, no landing flap set, centreline more than 1° off and speed more than 39 kt above the approach speed of 77 kt.
At the 500 ft gate: sink rate more than 600 fpm beyond what the glideslope needed and centreline more than 1° off.
When the approach was stable
Every check met from 0.7 nm, about 300 ft above the runway, to the threshold, after the 500 ft gate. The last to settle was the centreline.
Each line is one of the gate checks, run along the whole final rather than only at the gates: green where it would have passed, amber where it would not. The glideslope, centreline and speed lines use the bands in the charts beside this card. The sink rate is allowed what the glideslope needs at your ground speed plus 600 fpm, the wings 10° of bank, and the gear and flap are read from when you moved the levers. The bottom line is green where every check held at once, ignoring blips shorter than 0.2 nm, and the sentence above it says from where it held to the threshold. A ring is a stabilisation gate, where the checks in the table were taken.
The final from 4 nm, with the stabilisation gates on it.
Profile height against the 3° glideslope, with its 2° band in green.
Inside the glideslope band from 4 nm to the threshold, never more than 300 ft above the slope.
Your height above the runway against the distance still to go. The glideslope is the steady descent path to the aiming point, 305 m past the threshold: 3° here, which is about 320 ft for every nautical mile out, crossing the threshold at about 50 ft. The row under the distances is the height it puts you at. Inside the green band your path is drawn green; outside it, amber. A ring is a stabilisation gate: green when every check there passed, amber with the failed checks named beside it.
Plan distance off the extended centreline, your left at the top, with the 1° band. Sideways distances are drawn 3× larger than distances along the final.
Joined 223 m right of the centreline, then inside the band from 0.7 nm to the threshold.
Looking down from above, flying left to right towards the runway: up the page is left of the centreline, down is right. Sideways distances are stretched so that small drifts show, so a line that looks wild here may be only a few tens of feet. The labels are how far off you were at each distance, amber when outside the band.
Speed against the approach speed. The green band runs from 5 kt slow to 39 kt fast at the 1,000 ft gate, closing to 23 at 500 ft and 10 at the threshold.
Fast from 4 nm to 2.3 nm (up to +57 kt), then inside the band to the threshold.
Your indicated airspeed down the final, against the approach speed for this aircraft at its landing weight. The band allows 5 kt slow and more on the fast side further out, closing as you get lower, because the speed is expected to come off on the way down. The figures are knots above (+) or below (−) the approach speed.
Over the threshold
The flare held the target profile well
Pitch was 1.1° at touchdown, at or below this aircraft's ground attitude, so the nosewheel met the runway with the main wheels or before them. Touchdown was 406 m past the threshold. Keep raising the nose through the flare so the main wheels touch first.
Touchdown
Rollout
Side view — the last 1,524 m of the approach.
Crossed the threshold at 51 ft, close to the 50 ft target; began the flare at 16 ft. Touched down 406 m in, 101 m past the ideal 305 m.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 1,524 m across. The dashed line is the ideal, 50 ft over the threshold and down 305 m in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
The sink went from 460 fpm at the flare to 90 fpm at touchdown. The nose came up 0.8° on the way down. Into the flare at 72 kt, 5 kt under the 77 kt approach speed, and 69 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the first 1,524 m of the 2,276 m runway, to the same scale as the side view.
Touched down 2 m right of the centreline and drifted to 9.6 m right on the rollout. 12 kt across from the left, which takes about 10° of crab to hold the centreline at 69 kt. Touched down with 6° of it still on, wings level.
Wind 250° at 26 kt · 23 kt tail · 12 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
The 406 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Scroll or drag the slider to zoom · double-click to reset · hover for values