Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Arrival
Be established on the glideslope by the gate, and take the power back earlier on final so the height and the speed come back together. Do not push down for the height: that only adds speed.
What happened: The approach was off the glideslope at the gate, and the aircraft then crossed the threshold at 69 ft agl, 19 ft agl above the 50 ft agl target, and at 147 kt, 13 kt over the 134 kt threshold speed. High and fast together is energy the runway has to absorb, and this touchdown came 199 m beyond the aim point.
Watch for: Glideslope indication at the gate, then airspeed: 134 kt on short final
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 13 stages, 11 in the score
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Taxi out
The roll
Liftoff pitch close to a tail strike
The wheels left at 11.1°, at or past this aircraft's 10° tail strike.
The tail can only touch while the main wheels are still on the runway, so the margin that matters is the one at liftoff. Rotate at the rotate speed, at the normal rate, and let the aircraft fly itself off at its own attitude: keep the pull going towards the climb attitude only once the wheels have left. Rotating early, or pulling faster than the aircraft can lift off, is what eats the margin.
Liftoff and climb
Plan view the roll down the 3,742 m runway.
Rolled from 346 m in, drifted left of the centreline, 3.7 m at the widest, and lifted off 2.6 m left. Airborne 44 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length.
Side view from the start of the roll to the end of Climb 3 at 959 ft.
Reached 35 ft with 1,853 m of runway left; gear up at 86 ft, inside the 400 ft that gets full marks; then climbing at 2,550 fpm on average to 959 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The dark stretch of the roll is the run with the nose up and the wheels still on, with its length and time under the runway. The gear-up ring is coloured by its mark. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The dashed green line is the speed to rotate at for this aircraft at its weight, and the green dot is where the nose started to come up. The grey band is the run between the nose coming up and the wheels leaving the runway. The figures at liftoff are the pitch then and how fast the nose came up, in degrees a second. The rotation detail below draws the rotation against the rates for this aircraft and its tail-strike pitch, where the slope reads properly. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
Rotation detail the pitch over the seconds from rotation to 35 ft, where the slope reads properly.
The pitch over the seconds from the nose starting to come up to 35 ft, stretched so the slope reads properly. The green dot is where the nose started up, the grey band runs to the wheels leaving, and the figures at liftoff are the pitch then and how fast the nose came up. The two dashed green lines rising from the rotation point are 2 to 3° a second, the rates airliners are rotated at: a trace steeper than both is a faster rotation, one shallower than both a slower one. Each line runs from the rotation to the liftoff, so where it ends is the pitch the nose would have reached by the time the wheels left at that rate; a line that reaches the tail strike first stops on it. The red dashed line is 10°, the pitch at which this aircraft's tail touches the runway with the wheels still on it, drawn from rotation to liftoff only: once the wheels leave, every foot climbed adds tail clearance.
One stabilised approach gate: six checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 500 ft gate: sink rate more than 600 fpm beyond what the glideslope needed, glideslope more than 1° off the runway's 3° and speed more than 20 kt above the approach speed of 134 kt.
When the approach was stable
Never every check met at once: fast all the way, gear up until 3.3 nm, banked until 2.1 nm, high until 1.5 nm, sinking too fast until 1.4 nm, left of the centreline from 0.4 nm to the threshold.
Each line is one of the gate checks, run along the whole final rather than only at the gates: green where it would have passed, amber where it would not. The glideslope, centreline and speed lines use the bands in the charts beside this card. The sink rate is allowed what the glideslope needs at your ground speed plus 600 fpm, the wings 10° of bank, and the gear and flap are read from when you moved the levers. The bottom line is green where every check held at once, ignoring blips shorter than 0.2 nm, and the sentence above it says from where it held to the threshold. A ring is a stabilisation gate, where the checks in the table were taken.
Why this is not a circuit
Off and back onto LHBP, scored as a flight. A circuit passes all five:
The final from 4 nm, with the stabilisation gates on it.
Profile height against the 3° glideslope, with its 1° band in green.
High from 4 nm to 1.5 nm (up to 530 ft over), then back on it to the threshold.
Your height above the runway against the distance still to go. The glideslope is the steady descent path to the aiming point, 305 m past the threshold: 3° here, which is about 320 ft for every nautical mile out, crossing the threshold at about 50 ft. The row under the distances is the height it puts you at. Inside the green band your path is drawn green; outside it, amber. A ring is a stabilisation gate: green when every check there passed, amber with the failed checks named beside it.
Plan distance off the extended centreline, your left at the top, with the 1° band. Sideways distances are drawn 3× larger than distances along the final.
Joined 1,264 m right of the centreline, then inside it from 1.9 to 0.4 nm, then 13 m left of it from 0.4 nm to the threshold.
Looking down from above, flying left to right towards the runway: up the page is left of the centreline, down is right. Sideways distances are stretched so that small drifts show, so a line that looks wild here may be only a few tens of feet. The labels are how far off you were at each distance, amber when outside the band.
Speed against the approach speed. The green band runs from 5 kt slow to 34 kt fast at the 1,000 ft gate, closing to 20 at 500 ft and 10 at the threshold.
Fast from 4 nm to the threshold (up to +55 kt).
Your indicated airspeed down the final, against the approach speed for this aircraft at its landing weight. The band allows 5 kt slow and more on the fast side further out, closing as you get lower, because the speed is expected to come off on the way down. The figures are knots above (+) or below (−) the approach speed.
Over the threshold
The flare mostly held the target profile
The flare began at 87 ft agl above the runway, higher than this aircraft wants. Touchdown was 656 m past the threshold. Hold the aim point and let the runway come to you rather than anticipating the flare.
Touchdown
Rollout
Side view — the last 1,852 m of the approach.
Began the flare high, at 87 ft, 127 m before the threshold; crossed the threshold at 68 ft, 18 ft above the 50 ft target. Touched down 656 m in, 351 m past the ideal 305 m.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 1,852 m across. The dashed line is the ideal, 50 ft over the threshold and down 305 m in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
The sink grew from 0 fpm at the flare to 90 fpm at touchdown. The nose came up 7.9° on the way down. Into the flare at 149 kt, 15 kt over the 134 kt approach speed, and 134 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the first 1,852 m of the 3,742 m runway, to the same scale as the side view.
Touched down 9.8 m left of the centreline, and steered back to 3.7 m left by the end of the rollout. No crosswind: nothing to correct for. Touched down straight, wings level.
Wind 269° at 1 kt · 1 kt head · 0 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
Touched down 656 m past the threshold — beyond the full-score zone. The arrival was smooth.
The stop — touchdown to taxi speed.
From 135 kt at touchdown to taxi speed (30 kt) in 25 s, an average deceleration of 0.23 g.
Your ground speed from the moment the wheels touched until you were down to taxi speed, against the distance rolled. A steep line is hard braking, a shallow one a long, gentle roll. For scale, an airliner's lowest autobrake setting decelerates at about 0.15 g, a medium one about 0.3 g. Shown for reading; not marked.
The rest of the report
The flight in the Embraer E190 began with a departure roll on runway 31R at LHBP Budapest Liszt Ferenc International Airport. The takeoff distance was 4,338 ft, covering 36% of the runway, with a liftoff speed of 150 kn. The local weather at the time indicated a temperature of 53 °F with no significant wind factors.
During the enroute climb, the aircraft started climbing from 1,499 ft asl to 3,033 ft asl, gaining an altitude of 1,533 ft in 1 minute and covering a distance of 4 nm. The enroute level cruise began 2 miles south of Csomor (Pest megye, Hungary) and lasted for 3 minutes, covering a distance of 10 nm.
The landing took place on runway 31R at LHBP Budapest Liszt Ferenc International Airport, which has a runway length of 12,142 ft. The aircraft approached the runway at a height of 69 ft agl and a speed of 147 kn. The touchdown occurred 2,150 ft from the threshold at a speed of 134 kn and a VSI of -78 ft/m. The local weather during landing indicated a temperature of 62 °F with a slight headwind and crosswind of 1 kn each.
The total landing distance was 5,823 ft, covering 48% of the runway. The total flight distance for this journey was 23 nm, taking 131 minutes, and consuming 1,279 lbs of fuel.
Scroll or drag the slider to zoom · double-click to reset · hover for values