Events
MY FS FLIGHTS
Flight Score
Departure
Use small, coordinated rudder and aileron inputs to hold your assigned climb heading as soon as drift begins.
What happened: During the second climb segment, you let the aircraft drift off the assigned heading.
Watch for: Heading indicator: steady on the assigned climb heading
Arrival
Level the wings with coordinated aileron on short final so bank stays near wings-level through touchdown.
What happened: Wings were not level through the landing phase, with bank angle at 16° on short final.
Watch for: Watch the bank angle indicator, holding it near wings-level through the landing and touchdown.
Every knot above Vref is stored kinetic energy, and energy stored at the threshold must be dissipated in ground effect before the aeroplane will stop flying. Because kinetic energy scales with the square of speed, the excess you must dissipate grows fast. At a 45-knot approach, five knots hot is over a tenth more speed and roughly a quarter more energy to get rid of in ground effect. This is why the fix is never in the flare. It was decided three miles earlier, on final, at the airspeed indicator.
Read more in VRef ExplainedStart to finish · 9 stages, 8 in the score
Events
Taxi out
The roll
Rotated late
Rotation started at 68 kt, 8 kt after the 60 kt rotate speed.
The pull started after the rotate speed had gone by. Bring the airspeed into the scan as it approaches the rotate speed, so the pull starts on the number rather than when you notice it has passed.
Liftoff and climb
Plan view the roll down the 3,089 m runway.
Rolled from 663 m in, drifted right of the centreline, 6.5 m at the widest, and lifted off 6.2 m left. Airborne 30 % of the way down the runway, before the 75 % line.
The roll from above, with your left at the top. The line is where the wheels went, and "widest" is the furthest you drifted off the centreline. Lifting off before the amber 75 % line gets full marks for the roll length.
Side view from the start of the roll to the end of Climb 3 at 521 ft.
Reached 35 ft with 1,887 m of runway left; then climbing at 580 fpm on average to 521 ft.
The takeoff from the side: the height above the runway against the distance along it. The numbers along the runway are the speeds reached at each point. Lifting off in the amber last quarter of the runway costs marks for the roll length. The shaded stretch is Climb 3, scored on its average speed against the target.
Speed and pitch from brake release to the end of the climb, against time.
Two traces from brake release: the airspeed on top, and below it the pitch, which is how far the nose is above the horizon. The figure at liftoff is the pitch then. The grey dashed line across the pitch is the attitude held from 35 ft to the end: a nose held steady is a climb speed that holds, and the airspeed trace sits directly above it to compare. The shaded stretch is Climb 3, the part of the climb scored on holding the climb speed.
Over the threshold
The flare strayed well off the target profile
Crossing the threshold 26 kt above target, the flare ballooned 24 ft agl back up from 12 ft agl above the runway, 164 m in. Touchdown was 469 m past the threshold. Hold the attitude and let it settle rather than pushing - that excess speed is what turns a normal flare into a balloon, so the fix is on the approach, not in the flare.
Touchdown
Side view — the last 1,524 m of the approach.
Crossed the threshold at 47 ft, close to the 50 ft target; began the flare at 40 ft; ballooned 24 ft from 12 ft. Touched down 469 m in, 164 m past the ideal 305 m.
The last stretch of the approach and the touchdown, from the side. The height is stretched so that the last few feet show: 80 ft top to bottom, against 1,524 m across. The dashed line is the ideal, 50 ft over the threshold and down 305 m in. The flare ring is where you began raising the nose, and "descent slowed" is where the sink came off; the figures beside them are the sink rate, pitch and speed at that point.
Sink and pitch — through the flare, lined up with the side view.
From the flare the descent stopped and turned into a climb of 900 fpm before coming down at 200 fpm to touch. The nose came up 2.4° on the way down. Into the flare at 88 kt, 26 kt over the 62 kt approach speed, and 68 kt at touchdown.
Lined up with the side view above, so a point on one sits under the same point of the other. On top, how fast you were coming down: 0 is level, and −600 is 600 ft a minute down. Below, the pitch. In a flare the nose comes up and the descent slows towards 0. The figure at the touchdown line is your touchdown rate.
Plan view — the full 1,524 m runway, to the same scale as the side view.
Touched down 174 m left of the centreline. Little crosswind (1 kt): nothing to correct for. Touched down with the nose 14° right of the track, 14.9° of bank.
Wind 270° at 1 kt · 0 kt head · 1 kt across
The runway from above, with your left at the top. Touching down inside the green bracket scores full marks for the distance. The shaded part is the rollout, up to where it ended. The arrow beside the runway is the crosswind, pointing the way the air was moving, so it pushed the aircraft that way. The wind is the one recorded at the landing, split along the runway (headwind or tailwind) and across it. To hold the centreline in a crosswind the nose points a little into wind - the crab - and is straightened with rudder just before the wheels touch, often with the into-wind wing lowered to stop the drift. The sentence gives the nose against the direction you were actually moving as the wheels touched, and the steepest bank as they touched, the figure the touchdown's Bank tile marks. The rest of it is shown for reading, not marked.
The 469 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Scroll or drag the slider to zoom · double-click to reset · hover for values