Departure
One segment per stage, in flight order — colour is the score band. Drag the bar to move along the flight, or click a stage card to open its detail.
Arrival
Departure Roll
73.55Departure roll runway 32 at RPUI Iba. Takeoff distance 0 m 0 % of runway. Liftoff speed was 67 kn. Local weather - Temperature 15 °C. Wind 1 kn at 269 °. Crosswind: 1 kn Headwind: 1 kn.
ScoreDescriptionStartProfileEnd
100 %
Takeoff distance 0 m0 % of runway
63 %
Liftoff speed was 67 knTarget 62 kn
55 %
Runway alignment max 9.07 m7.17 m left to 1.89 m right
-0.19
7.17 m
100 %
Average g force 1.00 g0.98 g min to max 1.02 g
0.99
1.02 g
100 %
Takeoff Bounce
Info
Average pitch angle 1.6 °0.9 ° min to max 3.9 °
1.3
3.9 °
Info
Average bank angle 0.3 °0.1 ° min to max 0.5 °
0.4
0.2 °
Events
Fail
Landing Lights OFF should be ON
Fail
Strobe Light OFF should be ON
Info
Parking Brake Off
3 ft agl · 1 kt
Departure Climb 1
99.69Departure climb to 50 ft agl from runway 32 RPUI Iba.
ScoreDescriptionStartProfileEnd
99 %
Heading variation -0.9 °-1.1 ° min to max -0.8 °
-0.8
-1.1 °
100 %
Average speed 73 kn67 kn min to max 77 kn
67
77 kn
100 %
Average bank angle 0.4 °0.2 ° min to max 0.8 °
0.2
0.8 °
100 %
Average g force 1.04 g1.03 g min to max 1.06 g
1.03
1.05 g
Info
Average VSI 517 ft/m336 ft/m min to max 690 ft/m
336
690 ft/m
Info
Average altitude 18 ft agl0 ft agl min to max 48 ft agl
0
48 ft agl
Info
Average pitch angle 6.1 °4.0 ° min to max 8.2 °
4.0
8.2 °
Departure Climb 2
75.00Departure climb to 400 ft agl from 32 RPUI Iba.
ScoreDescriptionStartProfileEnd
100 %
Heading variation -1.1 °-1.3 ° min to max 1.1 °
-1.1
1.1 °
100 %
Average speed 76 kn72 kn min to max 77 kn
77
73 kn
0 %
Average bank angle 2.3 °0.8 ° min to max 13.1 °
0.8
8.5 °
100 %
Average g force 1.03 g0.94 g min to max 1.05 g
1.05
0.99 g
Info
Average VSI 940 ft/m697 ft/m min to max 1,399 ft/m
697
1,076 ft/m
Info
Average altitude 103 ft agl54 ft agl min to max 310 ft agl
54
310 ft agl
Info
Average pitch angle 9.6 °8.2 ° min to max 11.9 °
8.2
10.3 °
Events
Info
Flaps Fully Retracted
187 ft agl · 79 kt
Enroute Climb
100.00Enroute climb started overhead Iba (Province of Zambales, Central Luzon, Philippines). Climbing from 338 ft asl to 4,042 ft asl, an increase of 3,704 ft in 8 minutes and covering 9 nm.
ScoreDescriptionStartProfileEnd
100 %
Climb speed 76 kn62 kn min to max 111 knTarget 76 kn
73
91 kn
100 %
Average bank angle 5.9 °0.0 ° min to max 23.2 °
6.6
1.9 °
100 %
Average g force 1.00 g0.90 g min to max 1.20 g
1.00
1.00 g
Info
Average VSI 650 ft/m-540 ft/m min to max 1,634 ft/m
1,069
350 ft/m
Info
Average altitude 1,781 ft asl338 ft asl min to max 4,042 ft asl
338
4,042 ft asl
Info
Average pitch angle 7.0 °-1.9 ° min to max 12.8 °
10.3
2.7 °
Info
Turn coordination 00 min to max 0
0
0
Enroute Level
100.00Enroute level cruise started 1 mile north of Cabangan (Province of Zambales, Central Luzon, Philippines) and lasted 1 minutes, covering 2 nm.
ScoreDescriptionStartProfileEnd
100 %
Average altitude 4,135 ft asl4,055 ft asl min to max 4,174 ft asl
4,055
4,174 ft asl
100 %
Average speed 101 kn100 kn min to max 103 kn
100
102 kn
100 %
Average bank angle 5.4 °0.1 ° min to max 11.8 °
0.1
11.8 °
100 %
Average g force 1.00 g0.93 g min to max 1.07 g
1.01
1.00 g
Info
Turn coordination 00 min to max 0
0
0
Info
Average pitch angle 1.8 °0.4 ° min to max 3.6 °
1.8
0.4 °
Enroute Descent
48.43Enroute descent started overhead Cabangan (Province of Zambales, Central Luzon, Philippines). Descent from 4,175 ft asl to 2,708 ft asl, a decrease of 1,467 ft in 1 minutes and covering 2 nm.
ScoreDescriptionStartProfileEnd
0 %
Average speed 105 kn65 kn min to max 171 kn
93
91 kn
74 %
Average bank angle 20.4 °0.3 ° min to max 53.0 °
13.4
0.3 °
88 %
Average g force 0.99 g0.74 g min to max 1.46 g
0.98
0.93 g
Info
Average VSI -1,871 ft/m-8,163 ft/m min to max 453 ft/m
37
453 ft/m
Info
Average altitude 3,526 ft asl2,708 ft asl min to max 4,175 ft asl
4,175
2,708 ft asl
Info
Average pitch angle -8.0 °-30.4 ° min to max 3.7 °
0.2
3.7 °
Info
Turn coordination 00 min to max 0
0
0
Events
Fail
Overspeed Warning Activated
3,190 ft agl · 167 kt
Info
Overspeed Warning Deactivated
2,712 ft agl · 172 kt
Enroute Climb 2
100.00Enroute climb started 2 miles south of Cabangan (Province of Zambales, Central Luzon, Philippines). Climbing from 2,781 ft asl to 2,999 ft asl, an increase of 218 ft in 1 minutes and covering less than 1 nm.
ScoreDescriptionStartProfileEnd
100 %
Average speed 85 kn83 kn min to max 87 kn
87
85 kn
100 %
Average bank angle 7.9 °3.6 ° min to max 12.7 °
7.2
4.2 °
100 %
Average g force 1.00 g0.93 g min to max 1.04 g
1.04
1.01 g
Info
Average VSI 605 ft/m311 ft/m min to max 727 ft/m
704
311 ft/m
Info
Average altitude 2,852 ft asl2,781 ft asl min to max 2,999 ft asl
2,781
2,999 ft asl
Info
Average pitch angle 4.4 °2.6 ° min to max 5.1 °
5.1
2.6 °
Info
Turn coordination 00 min to max 0
0
0
Enroute Level 2
100.00Enroute level cruise started 2 miles south of Cabangan (Province of Zambales, Central Luzon, Philippines) and lasted 1 minutes, covering 2 nm.
ScoreDescriptionStartProfileEnd
100 %
Average altitude 3,013 ft asl2,887 ft asl min to max 3,098 ft asl
3,044
2,887 ft asl
100 %
Average speed 99 kn97 kn min to max 100 kn
97
99 kn
100 %
Average bank angle 2.2 °0.1 ° min to max 4.6 °
3.8
2.8 °
100 %
Average g force 1.02 g0.99 g min to max 1.12 g
1.02
1.12 g
Info
Turn coordination 00 min to max 0
0
0
Info
Average pitch angle 1.8 °1.0 ° min to max 2.1 °
2.1
1.0 °
Enroute Descent 2
100.00Enroute descent started 4 miles south east of Cabangan (Province of Zambales, Central Luzon, Philippines). Descent from 2,896 ft asl to 2,728 ft asl, a decrease of 168 ft in 1 minutes and covering less than 1 nm.
ScoreDescriptionStartProfileEnd
100 %
Average speed 102 kn100 kn min to max 110 kn
100
110 kn
100 %
Average bank angle 11.5 °1.9 ° min to max 21.4 °
6.6
1.9 °
100 %
Average g force 0.99 g0.90 g min to max 1.07 g
1.01
1.07 g
Info
Average VSI -219 ft/m-967 ft/m min to max 194 ft/m
189
-445 ft/m
Info
Average altitude 2,882 ft asl2,728 ft asl min to max 2,913 ft asl
2,896
2,728 ft asl
Info
Average pitch angle 0.0 °-3.1 ° min to max 1.5 °
1.5
0.6 °
Info
Turn coordination 00 min to max 0
0
0
Enroute Level 3
100.00Enroute level cruise started 4 miles north of San Narciso (Province of Zambales, Central Luzon, Philippines) and lasted 2 minutes, covering 2 nm.
ScoreDescriptionStartProfileEnd
100 %
Average altitude 2,813 ft asl2,564 ft asl min to max 2,912 ft asl
2,728
2,878 ft asl
100 %
Average speed 94 kn78 kn min to max 116 kn
110
90 kn
100 %
Average bank angle 4.5 °0.0 ° min to max 8.8 °
1.9
6.2 °
100 %
Average g force 1.02 g0.96 g min to max 1.07 g
1.07
1.01 g
Info
Turn coordination 00 min to max 0
0
0
Info
Average pitch angle 2.1 °-4.0 ° min to max 7.8 °
0.6
3.2 °
Enroute Climb 3
100.00Enroute climb started 3 miles north east of San Narciso (Province of Zambales, Central Luzon, Philippines). Climbing from 2,880 ft asl to 3,154 ft asl, an increase of 273 ft in 1 minutes and covering less than 1 nm.
ScoreDescriptionStartProfileEnd
100 %
Average speed 82 kn76 kn min to max 83 kn
82
76 kn
100 %
Average bank angle 5.8 °0.5 ° min to max 10.9 °
7.6
0.5 °
100 %
Average g force 1.01 g1.00 g min to max 1.03 g
1.03
1.00 g
Info
Average VSI 255 ft/m45 ft/m min to max 580 ft/m
130
45 ft/m
Info
Average altitude 2,945 ft asl2,880 ft asl min to max 3,154 ft asl
2,880
3,154 ft asl
Info
Average pitch angle 3.5 °2.8 ° min to max 5.2 °
3.1
5.2 °
Info
Turn coordination 00 min to max 0
0
0
Enroute Level 4
100.00Enroute level cruise started 3 miles north east of San Narciso (Province of Zambales, Central Luzon, Philippines) and lasted 1 minutes, covering 1 nm.
ScoreDescriptionStartProfileEnd
100 %
Average altitude 3,281 ft asl3,186 ft asl min to max 3,319 ft asl
3,186
3,319 ft asl
100 %
Average speed 85 kn84 kn min to max 87 kn
86
86 kn
100 %
Average bank angle 0.7 °0.2 ° min to max 1.1 °
0.8
0.8 °
100 %
Average g force 0.98 g0.94 g min to max 1.01 g
0.98
1.01 g
Info
Turn coordination 00 min to max 0
0
0
Info
Average pitch angle 4.8 °4.2 ° min to max 5.6 °
4.5
4.2 °
Enroute Climb 4
100.00Enroute climb started 2 miles north of San Marcelino (Province of Zambales, Central Luzon, Philippines). Climbing from 3,344 ft asl to 3,804 ft asl, an increase of 460 ft in 1 minutes and covering 2 nm.
ScoreDescriptionStartProfileEnd
100 %
Average speed 75 kn74 kn min to max 76 kn
75
75 kn
100 %
Average bank angle 0.8 °0.1 ° min to max 2.7 °
0.2
0.1 °
100 %
Average g force 0.99 g0.93 g min to max 1.06 g
1.06
1.00 g
Info
Average VSI 345 ft/m90 ft/m min to max 533 ft/m
90
215 ft/m
Info
Average altitude 3,567 ft asl3,344 ft asl min to max 3,804 ft asl
3,344
3,804 ft asl
Info
Average pitch angle 4.9 °4.6 ° min to max 5.5 °
4.8
5.0 °
Info
Turn coordination 00 min to max 0
0
0
Enroute Level 5
100.00Enroute level cruise started 1 mile north east of San Marcelino (Province of Zambales, Central Luzon, Philippines) and lasted 1 minutes, covering less than 1 nm.
ScoreDescriptionStartProfileEnd
100 %
Average altitude 3,891 ft asl3,832 ft asl min to max 3,945 ft asl
3,832
3,945 ft asl
100 %
Average speed 83 kn82 kn min to max 84 kn
84
83 kn
100 %
Average bank angle 0.6 °0.0 ° min to max 1.8 °
0.3
1.8 °
100 %
Average g force 0.98 g0.95 g min to max 1.00 g
0.99
0.95 g
Info
Turn coordination 00 min to max 0
0
0
Info
Average pitch angle 5.0 °4.4 ° min to max 5.9 °
4.9
4.4 °
Enroute Climb 5
100.00Enroute climb started 1 mile east of San Marcelino (Province of Zambales, Central Luzon, Philippines). Climbing from 3,957 ft asl to 4,124 ft asl, an increase of 167 ft in less than 1 minute. and covering less than 1 nm.
ScoreDescriptionStartProfileEnd
100 %
Average speed 73 kn73 kn min to max 74 kn
74
73 kn
100 %
Average bank angle 0.6 °0.1 ° min to max 1.5 °
1.5
0.1 °
100 %
Average g force 1.00 g0.99 g min to max 1.01 g
0.99
0.99 g
Info
Average VSI 252 ft/m-1 ft/m min to max 424 ft/m
-1
197 ft/m
Info
Average altitude 4,037 ft asl3,957 ft asl min to max 4,124 ft asl
3,957
4,124 ft asl
Info
Average pitch angle 4.7 °4.0 ° min to max 5.2 °
4.8
4.0 °
Info
Turn coordination 00 min to max 0
0
0
Enroute Level 6
100.00Enroute level cruise started 1 mile north of Castillejos (Province of Zambales, Central Luzon, Philippines) and lasted 3 minutes, covering 5 nm.
ScoreDescriptionStartProfileEnd
100 %
Average altitude 4,278 ft asl4,160 ft asl min to max 4,372 ft asl
4,160
4,343 ft asl
100 %
Average speed 100 kn87 kn min to max 105 kn
87
104 kn
100 %
Average bank angle 0.7 °0.0 ° min to max 2.5 °
1.2
1.1 °
100 %
Average g force 1.00 g0.95 g min to max 1.05 g
0.99
1.01 g
Info
Turn coordination 00 min to max 0
0
0
Info
Average pitch angle 1.9 °0.8 ° min to max 3.4 °
3.4
1.2 °
Enroute Descent 3
100.00Enroute descent started overhead Subic (Province of Zambales, Central Luzon, Philippines). Descent from 4,358 ft asl to 2,260 ft asl, a decrease of 2,098 ft in 2 minutes and covering 3 nm.
ScoreDescriptionStartProfileEnd
100 %
Average speed 111 kn100 kn min to max 124 kn
104
114 kn
100 %
Average bank angle 4.5 °0.0 ° min to max 10.8 °
0.0
0.8 °
100 %
Average g force 0.96 g0.83 g min to max 1.07 g
1.02
1.00 g
Info
Average VSI -1,441 ft/m-2,600 ft/m min to max 7 ft/m
4
-1,337 ft/m
Info
Average altitude 3,458 ft asl2,260 ft asl min to max 4,378 ft asl
4,358
2,260 ft asl
Info
Average pitch angle -7.6 °-14.6 ° min to max 1.4 °
1.4
-5.6 °
Info
Turn coordination 00 min to max 0
0
0
Events
Info
Flaps Position 1
3,603 ft agl · 116 kt
Info
Flaps Position 2
3,441 ft agl · 114 kt
Arrival
98.74Arrival started overhead Subic (Province of Zambales, Central Luzon, Philippines).
ScoreDescriptionStartProfileEnd
100 %
Average speed 80 kn58 kn min to max 110 kn
99
65 kn
100 %
Average bank angle 4.4 °0.0 ° min to max 17.8 °
0.2
2.9 °
94 %
Average g force 0.99 g0.64 g min to max 1.20 g
1.02
1.01 g
Info
Average VSI -887 ft/m-2,837 ft/m min to max 207 ft/m
-1,028
-933 ft/m
Info
Average altitude 1,204 ft asl322 ft asl min to max 2,145 ft asl
2,145
322 ft asl
Info
Average pitch angle -4.4 °-14.2 ° min to max 2.5 °
-3.5
-3.8 °
Info
Turn coordination 00 min to max 0
0
0
Arrival Final 1
72.44Approaching runway 25 at RPLB Subic Bay Intl from 1 nm to 0 nm. Descent from 191 ft agl to 57 ft agl. A decrease of 133 ft in 14 seconds.
ScoreDescriptionStartProfileEnd
64 %
Approach angle 3.9 °3.7 ° min to max 4.2 °Target 3.0 °
4.2
3.7 °
100 %
Average speed 60 kn59 kn min to max 66 kn
66
59 kn
98 %
Heading variation 0.0 °-0.0 ° min to max 0.2 °
0.2
-0.0 °
0 %
Average bank angle 2.4 °0.0 ° min to max 5.0 °
5.0
1.3 °
100 %
Average g force 1.00 g1.00 g min to max 1.03 g
1.03
1.00 g
Info
Average VSI -501 ft/m-747 ft/m min to max -488 ft/m
-747
-491 ft/m
Info
Average altitude 82 ft agl57 ft agl min to max 191 ft agl
191
57 ft agl
Info
Average pitch angle 0.0 °-2.0 ° min to max 0.3 °
-2.0
0.3 °
Arrival Landing
96.07Landing on runway 25 at RPLB Subic Bay Intl, runway length 2,831 m. Threshold height at 55 ft agl was slightly above target. Threshold speed was slightly below target at 59 kn.
ScoreDescriptionStartProfileEnd
90 %
Threshold speed was slightly below target at 59 kn. Target 63 kn
99.9 %
Target 50 ft agl
100 %
Landing and flare profile
100 %
Heading variation -0.0 °-0.2 ° min to max -0.0 °
-0.0
-0.2 °
87 %
Average bank angle 0.7 °0.0 ° min to max 1.3 °
1.3
0.0 °
100 %
Average g force 1.03 g0.99 g min to max 1.06 g
1.00
0.99 g
Info
Average speed 56 kn46 kn min to max 59 kn
59
46 kn
Info
Average VSI -408 ft/m-497 ft/m min to max -115 ft/m
-491
-115 ft/m
Info
Average altitude 25 ft agl0 ft agl min to max 55 ft agl
55
0 ft agl
Info
Average pitch angle 1.9 °0.3 ° min to max 5.1 °
0.3
5.1 °