Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 22 stages, 21 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,926 m runway, to the same scale as the side view.
Touched down 520 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Overall, this aircraft landing had some strengths and areas for improvement. The Approach Phase demonstrated good heading alignment and target speed, but the descent path was poor above the glideslope limit. During the Landing Phase, the threshold height and landing flare were executed well, but there was instability during landing. The Touchdown Phase showed a perfect touchdown rate and target speed, but the distance was a little long and runway alignment could be improved. In the Rollout Phase, the runway alignment was off.
To improve future landings, I recommend focusing on maintaining a stable descent path, ensuring runway alignment throughout all phases of landing, and working on reducing any instability during the landing phase. By practicing these areas, you can achieve even smoother and more successful landings in the future. Keep up the good work!
Scroll or drag the slider to zoom · double-click to reset · hover for values