Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Ease the back pressure on the yoke after rotation so the pitch change is smoother and g force stays lower.
What happened: During the initial climb the average g force reached 1.4 g, a high value for that phase.
Watch for: G meter: smooth, steady value in the normal climb band
Arrival
Use small rudder inputs against a point at the far end of the runway to hold the centreline during rollout.
What happened: During the rollout the aircraft drifted 17 m off the centreline.
Watch for: Runway centreline marks: hold the aircraft tracking straight down the centreline through rollout
See Arrival Rollout
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 17 stages, 16 in the score
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 500 ft gate: centreline 1.4° off, against a 1° limit and wings 10° of bank, against a 10° limit.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,521 m runway, to the same scale as the side view.
The 348 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Ajaccio-Napoléon Bonaparte Airport (LFKJ), the Phenom 300E began its journey with a taxiing period of 5 minutes, covering less than 1 nautical mile to reach the runway. The departure roll commenced on runway 20, with the aircraft lifting off at a speed of 120 kt after a takeoff distance of 1,389 meters, which accounted for 64% of the runway length. The local weather conditions at the time of departure featured a temperature of 27 °C, with a wind speed of 9 kt at 229°, resulting in a crosswind of 4 kt and a headwind of 8 kt.
As the aircraft climbed to 26,009 ft, it covered a distance of 36 nautical miles in 8 minutes, achieving an increase of 25,038 ft from its initial altitude of 971 ft. The enroute climb phase was followed by a brief level cruise, lasting 3 minutes and covering 26 nautical miles, before the aircraft began its descent towards Nice-Côte d'Azur Airport (LFMN). The descent phase involved multiple level cruises, with the aircraft eventually touching down on runway 22R after a total flight distance of 172 nautical miles. The landing distance of 1,263 meters, which accounted for 50% of the runway length, was considered good, with a touchdown speed of 98 kt and a touchdown rate of -93 fpm.
The local weather conditions at the time of landing featured a temperature of 22 °C, with a wind speed of 9 kt at 170°, resulting in a crosswind of 7 kt and a headwind of 5 kt. The runway rollout alignment was slightly misaligned by 17.0 meters from the centreline. The aircraft used a total of 289 kg of fuel during the flight, which lasted 43 minutes. Overall, the flight demonstrated good performance, with the aircraft meeting the required threshold speeds and touchdown rates throughout the journey.
The aircraft touched down on runway 22R at LFMN Nice-Côte d'Azur Airport with a good threshold height, allowing for a smooth transition from the approach to the touchdown phase. The threshold speed of 104 kt was well within the acceptable range, indicating a well-executed approach. The touchdown distance of 349 m was also satisfactory, demonstrating a high degree of control and precision.
The touchdown speed of 98 kt was within the desired parameters, and the touchdown rate of -93 fpm was exceptional, signifying a gentle and controlled descent. The runway touchdown alignment was perfect, with the aircraft centered on the runway. The local weather conditions, with a temperature of 22 °C and a moderate headwind of 5 kt, contributed to a stable and predictable approach.
However, the rollout phase was not without its challenges. Although the total landing distance of 1,263 m was within the acceptable range, covering only 50% of the runway, the runway rollout alignment was misaligned by 17.0 m from the centreline. This deviation from the centreline may have been due to a slight overcorrection or a minor loss of control during the rollout phase. Despite this, the overall score of 94.3% reflects a high level of proficiency and control throughout the approach, touchdown, and rollout phases.
Scroll or drag the slider to zoom · double-click to reset · hover for values