Roll the wings level with aileron and hold bank within limits as you establish the climb.
What happened: Bank increased to 3.9° during the initial climb, and wings stayed over-banked at 7.3° into the next climb segment.
Watch for: Attitude indicator bank angle, aiming to keep it near wings-level
Arrival
Add power on short final to hold 61 kt at the threshold rather than letting speed decay.
What happened: You crossed the threshold at 43 kt against a target of 61 kt, below reference speed.
Watch for: Airspeed indicator, hold 61 kt down to the threshold.
See Arrival Landing
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 15 stages, 14 scored
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 300 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 300 ft gate: glideslope 4.8° against the runway's 2.8° and centreline 2.3° off, against a 1° limit.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,614 m runway, to the same scale as the side view.
The 176 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The Cessna 152 taxied to runway 11 at MDST Cibao International Airport and commenced the departure roll. Takeoff was achieved after a ground run of 599 m, representing 23 % of the available runway, with liftoff occurring at 65 kt. Ambient conditions were 15 °C with a wind of 1 kt from 270°, no cross-wind and a 1 kt tail-wind component.
The initial climb began overhead MDST, climbing from 1,103 ft asl to 1,679 ft asl - a gain of 576 ft in 1 minute while covering less than 1 nm.
A level cruise segment started 1 nm south-east of Licey al Medio and continued for 9 minutes, during which 14 nm were flown.
The next climb commenced 2 nm south-west of Licey al Medio, ascending from 1,805 ft asl to 2,899 ft asl - an increase of 1,093 ft in 2 minutes over a distance of 2 nm.
A descent followed 1 nm south-west of Licey al Medio, descending from 2,935 ft asl to 2,270 ft asl - a loss of 666 ft in 2 minutes while covering 3 nm.
A subsequent cruise segment was flown overhead MDST, lasting 3 minutes and covering 4 nm.
The aircraft executed a go-around on runway 11 at MDST, climbing to an altitude of 999 ft agl before re-establishing a missed-approach profile.
During the final approach to runway 11, the aircraft descended from 732 ft agl to 29 ft agl in 65 seconds and was recorded as having scored on the stabilisation gates.
Landing on runway 11 was completed with a touchdown distance of 174 m and a touchdown speed of 32 kt. The touchdown rate was minus 76 fpm and the touchdown point was offset 5.3 m from the centreline. The total landing distance measured 262 m, equivalent to 10 % of the runway length of 2,614 m, and the rollout alignment was judged very good.
The runway rollout proceeded with the aircraft remaining well aligned throughout the deceleration phase.
In total the flight covered 39 nm, required 29 minutes of elapsed time, and consumed 7 kg of fuel.
The Cessna 152 approached runway 11 at MDST Cibao International Airport descending from 732 ft agl to 29 ft agl in 65 seconds and was scored on the stabilisation gates.
At threshold the aircraft maintained a good height, but the threshold speed of 43 kt was well below the target, prompting a reminder to avoid a stall.
Touchdown occurred 174 m down the runway at a speed of 32 kt with an excellent vertical rate of minus 76 fpm; the touchdown point was offset 5.3 m from the centreline.
The rollout covered a total of 262 m, representing 10 % of the 2,614 m runway, and alignment during rollout was very good.
To reduce the risk of an underspeed stall, increase the approach speed to meet the prescribed target while preserving the stable descent profile. Improving centreline tracking will bring the touchdown point closer to the runway centreline and further enhance overall precision.