Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 25 stages, 24 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,329 m runway, to the same scale as the side view.
The 373 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, the landing of the aircraft had both positive aspects and areas for improvement. The Approach Phase had a poor descent path above the glideslope limit, but had great heading alignment. In addition, the speed was slightly below target.
During the Landing Phase, the aircraft had a good threshold height and a perfect landing flare. As for the Touchdown Phase, the touchdown rate was fair and the speed was on target. The distance was very good and the runway alignment was fair.
However, during the Rollout Phase, the runway alignment was also fair.
To improve the landing of this aircraft, it would be recommended to focus on maintaining a descent path within the glideslope limit during the Approach Phase and adjusting the speed to meet the target. Additionally, working on improving the runway alignment during both the Landing and Rollout Phases could also lead to a smoother landing experience.
Overall, by addressing these areas for improvement, the aircraft landing can become even more successful in the future.
Scroll or drag the slider to zoom · double-click to reset · hover for values