Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 20 stages, 19 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,608 m of the approach.
Plan view — the first 1,608 m of the 2,914 m runway, to the same scale as the side view.
Touched down 727 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Overall, the landing had both strengths and areas for improvement.
What went well: - The heading alignment during the Approach Phase was excellent, as was the landing flare during the Landing Phase. - The touchdown rate during the Touchdown Phase was good, and the runway alignment during the Rollout Phase was fair.
What didn't go so well: - The Approach Phase had a poor descent path below the glideslope limit, and the Touchdown Phase had a slightly longer distance than desired on the runway. - The speed was slightly above target in the Touchdown Phase and the Rollout Phase, which could be improved upon.
Recommendations: - Focus on maintaining a consistent descent path during the Approach Phase to ensure the aircraft stays on course. - Pay attention to speed control during the Touchdown and Rollout Phases to ensure a smooth landing and rollout. - Practice reducing the touchdown distance on the runway to improve efficiency and safety.