Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 19 stages, 17 scored
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,484 m runway, to the same scale as the side view.
The 376 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, your aircraft landing score of 93.1% is quite impressive and shows a high level of skill and proficiency in various aspects of the landing process.
Starting with the Approach Phase, it is commendable that you had excellent glideslope alignment, indicating strong precision and control throughout the descent towards the runway. This sets a solid foundation for a successful landing.
Moving on to the Landing Phase, the good threshold height and fair landing flare show that you were able to properly gauge the altitude and make necessary adjustments for a smooth touchdown. While there was a noted issue with bank angle stability during landing, this can be improved with practice and focus on maintaining a steady approach.
In the Touchdown Phase, there are both strengths and areas for improvement. The very hard touchdown rate suggests the need for a softer, more controlled approach to reduce impact on the landing gear and ensure passenger comfort. However, the on-target speed, touchdown distance inside the touchdown zone, and runway touchdown position being only 3.4 m from the centreline indicate strong accuracy and alignment with the runway.
Finally, in the Rollout Phase, while the runway alignment was slightly off at 11.4 m from the centreline, this can be fine-tuned with attention to maintaining a straight path during the rollout.
Overall, your performance demonstrates a high level of skill and proficiency in various aspects of the landing process. By continuing to practice and focus on improving areas such as bank angle stability and touchdown rate, you have the potential to achieve even higher scores in your future landings. Keep up the good work and strive for continuous improvement in your aircraft handling skills.
Scroll or drag the slider to zoom · double-click to reset · hover for values