Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 9.9 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Add power on short final to hold 102 kt at the threshold rather than letting speed decay.
What happened: You crossed the threshold at 92 kt against a target of 102 kt, below reference speed.
Watch for: Airspeed indicator, hold 102 kt down to the threshold.
See Arrival Landing
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 24 stages, 22 in the score
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
At the 1,000 ft gate: speed 56 kt FAST on the reference speed of 102 kt.
The approach, gate by gate
Side view — the last 1,463 m of the approach.
Plan view — the full 1,463 m runway, to the same scale as the side view.
The 330 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The ATR-72 taxied from the parking area to runway 27 at EGLC, a movement that lasted 7 minutes and covered 1 nm.
Take-off was made on runway 27. The aircraft used 815 m of runway, which is 54 % of the available length. Rotation occurred at 128 kt. Local weather was 23 °C with a wind of 5 kt from 310°, giving a 3 kt cross-wind component and a 4 kt head-wind component.
Initial climb to 1 000 ft agl was completed in 23 seconds, averaging 2 082 fpm and reaching 159 kt at the top of the segment. The climb continued from 1 047 ft asl to 17 852 ft asl in 7 minutes, covering 27 nm, beginning 1 mile east of Canary Wharf.
Cruise was level at 18 000 ft asl for 25 minutes, covering 115 nm, beginning 1 mile south-west of Rawreth.
Descent from 18 000 ft asl to 2 529 ft asl took 22 minutes and covered 90 nm, beginning 28 miles north-west of Etretat, with brief level-offs at 9 000 ft, 8 000 ft, 6 500 ft and 3 000 ft asl.
A further level segment was flown at 2 000 ft asl for 9 minutes, covering 26 nm, beginning 8 miles south-west of Saint-Jean-de-la-Riviere.
Final approach to runway 27 at EGJB began with a descent from 1 370 ft agl to 83 ft agl in 115 seconds. Stabilisation checks were performed at 1 000 ft and 500 ft above the runway. The checks were met for gear down, landing flap, sink rate, glideslope, centreline and wings level; the speed check was not met at one gate. Configuration was gear down at 1 508 ft agl with 170 kt, and final flap position 2 was selected at 1 291 ft agl with 155 kt.
Landing was on runway 27, which is 1 463 m long. The threshold height was good and the threshold speed was slightly below target at 92 kt. The flare was described as very good, although the pitch was pumped up and down during the flare. Touchdown occurred 330 m from the threshold at 88 kt with a rate of -171 fpm; alignment on touchdown was very good and there was no bounce. Total landing distance was 722 m, 49 % of the runway, and rollout alignment was very good. Local weather at the airport was 18 °C with a wind of 1 kt from 001°, giving a 1 kt cross-wind component and no head-wind.
After landing, the aircraft taxied to the parking area in 3 minutes, covering less than 1 nm.
The flight covered a total of 265 nm in 74 minutes and used 757 kg of fuel.
The ATR-72 arrived on final approach to runway 27 at EGJB Guernsey Airport with an unstable profile at the 1,000 ft gate, being more than 20 kt above VREF, and completed a descent from 1,370 ft agl to 83 ft agl in 115 seconds while being scored on the stabilisation gates; the overall landing score was 95.2 %.
During the threshold and flare phase the aircraft touched down with a threshold speed slightly below target at 92 kt and a good threshold height, on a runway 1,463 m long.
Touchdown occurred 329 m down the runway at a speed of 88 kt, a firm rate of -328 fpm, and very good runway-touchdown alignment; ambient conditions were 18 °C with a wind of 1 kt from 1°, crosswind 1 kt and headwind 0 kt.
The rollout covered a total landing distance of 722 m, representing 49 % of the runway, and the runway-rollout alignment was very good.
To convert the high-speed approach into a fully stabilised one, reduce the approach speed to VREF by the 1,000 ft gate and verify speed adherence during the final descent. Maintaining the target speed will help preserve the excellent touchdown and rollout performance already demonstrated.
Scroll or drag the slider to zoom · double-click to reset · hover for values