Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Maintain the centreline
A small uncorrected heading error at 40 knots becomes a metre of offset per second by 100 knots, noticed only at rotation, producing a crabbed liftoff. Root cause is nearly always eyes on the tape instead of the far end of the runway. Small heading changes displace a distant point visibly long before the nearby centreline stripes look wrong.
Read more in Improve Your Take-OffsStart to finish · 20 stages, 19 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,545 m of the approach.
Plan view — the first 1,545 m of the 2,557 m runway, to the same scale as the side view.
Touched down 603 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
First of all, congratulations on achieving an impressive aircraft landing score of 98.4%! This score reflects the excellent performance across all phases of the landing process.
Starting with the Approach Phase, it is evident that the glideslope alignment was executed impeccably. This shows a high level of precision and control during the descent towards the runway, ensuring a smooth transition into the Landing Phase.
Moving on to the Landing Phase, it is commendable that the threshold height was good, indicating a proper approach to the runway. The very good landing flare demonstrates a skillful execution in bringing the aircraft to a safe and controlled touchdown. This phase is crucial as it sets the foundation for a successful landing.
In the Touchdown Phase, the smooth touchdown rate and on-target speed are key indicators of a well-managed landing. Additionally, the touchdown point being 184 meters beyond the designated touchdown zone shows a good judgment and precision in landing the aircraft. The very good runway touchdown position further underscores the competency in handling the aircraft during this critical phase.
Finally, in the Rollout Phase, the very good runway alignment signifies a consistent and steady handling of the aircraft as it rolls down the runway post-landing. This phase is essential for safely bringing the aircraft to a complete stop and taxiing off the runway.
Overall, this landing score of 98.4% reflects a high level of proficiency in aircraft handling and landing techniques. It is clear that each phase of the landing process was executed with precision and skill, culminating in a successful and safe landing. Keep up the excellent work and continue to strive for perfection in every flight!
Scroll or drag the slider to zoom · double-click to reset · hover for values