Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 20 stages, 19 scored
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,798 m runway, to the same scale as the side view.
Touched down 550 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Overall, the approach phase and landing phase went very well, with excellent glideslope alignment, heading alignment, and speed control. The landing flare was perfect and the threshold height was good. However, the touchdown phase had a slightly long distance and the touchdown rate could be improved. Additionally, the rollout phase had fair runway alignment.
To improve the touchdown phase, focus on reducing the touchdown rate and ensuring the distance is appropriate for a smooth landing. In the rollout phase, work on improving runway alignment to ensure a safe and efficient exit from the runway. Overall, continue practicing and maintain good communication with air traffic control to ensure a successful and smooth landing. Great job on the approach and landing phases, and keep up the good work!
Scroll or drag the slider to zoom · double-click to reset · hover for values