Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Use small, coordinated rudder and aileron inputs to hold your assigned climb heading as soon as drift begins.
What happened: During the second climb segment, you let the aircraft drift off the assigned heading.
Watch for: Heading indicator: steady on the assigned climb heading
Arrival
Make small rudder corrections against a fixed point at the far end of the runway to hold the centreline.
What happened: You drifted off the centreline on the approach.
Watch for: Runway centreline: tracked all the way to the threshold.
See Arrival Approach
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 13 stages, 12 scored
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate for a circuit: seven checks where the approach path is 500 ft above the runway. The 1,000 ft gate is an instrument-approach check and does not apply. These checks are the approach's score.
At the 1,000 ft gate: centreline 2.7° off, against a 1° limit and wings 16° of bank, against a 10° limit.
At the 500 ft gate: sink rate 2,670 fpm, more than the glideslope needed, centreline 1.8° off, against a 1° limit and speed 56 kt FAST on the reference speed of 86 kt.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,448 m runway, to the same scale as the side view.
The 208 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The TBM-930 taxied to runway 09 at EHAM and commenced the departure roll, achieving a take-off distance of 511 m, which represents 15 % of the available runway. Liftoff occurred at 88 kt, and the ambient temperature at the time was 17 °C.
During the final segment of the flight the aircraft descended from 1,111 ft AGL to 26 ft AGL in 86 seconds, meeting the stabilisation gate criteria before the approach phase.
The approach began with a right-hand pattern entry to runway 09, covering less than 1 nm in 150 seconds. The subsequent right-hand crosswind leg was completed in 21 seconds over a distance of less than 1 nm. The downwind turn spanned 6 nm with a 45-degree angle to the runway and a heading change of 7.5 °. The downwind leg itself was less than 1 nm and lasted 16 seconds. The base-leg turn covered 5 nm, turning the aircraft 176.9 ° toward the runway. The final approach to runway 27 was conducted with a descent from 1,111 ft AGL to 26 ft AGL in 86 seconds; local weather reported a temperature of 15 °C, wind 2 kt from 150°, a 2 kt crosswind component and a 1 kt tailwind component.
Landing was executed on runway 27, whose length is 3,448 m. The threshold speed was slightly below the target at 80 kt. Touchdown occurred 208 m down the runway at 71 kt, with a vertical speed of minus 213 fpm; runway-touchdown alignment was recorded as perfect. The total landing roll measured 435 m, equivalent to 13 % of the runway length, and rollout alignment was judged very good.
In the rollout phase the aircraft maintained precise alignment along the centreline until the end of the ground run.
Overall, the flight covered a distance of 10 nm, took 6 (units as recorded), and consumed 20 kg of fuel.
Scroll or drag the slider to zoom · double-click to reset · hover for values