Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Arrival
Hold the aim point and wait for the runway to come to you instead of starting the flare at 119 ft.
What happened: The flare began at 119 ft, well above the normal band and 74 ft earlier than the 45 ft limit.
Watch for: Radio altimeter against the normal flare band around 50 ft.
See Arrival Landing
Below 10,000 ft you are typically limited to 250 kt indicated (a US rule that much of the world mirrors in some form, though not universally). This forces a deceleration around 10,000 ft whether the profile wants one or not, so plan for it rather than discovering it.
Read more in Descent PlanningStart to finish · 14 stages, 13 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 500 ft gate: sink rate 1,568 fpm, more than the glideslope needed.
The approach, gate by gate
Side view — the last 1,594 m of the approach.
Plan view — the first 1,594 m of the 1,997 m runway, to the same scale as the side view.
Touched down 764 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The aircraft taxied from the parking area to the departure runway in 6 minutes, covering a distance of 1 nm.
During the departure roll on runway 01 at LEGE Girona-Costa Brava Airport, the takeoff run measured 1,747 m, representing 73 % of the available runway. Liftoff was achieved at 151 kt. Ambient conditions were a temperature of 32 °C with a wind of 6 kt from 220°, a crosswind component of 2 kt and a tailwind component of 5 kt.
Climb commenced overhead Aiguaviva (Catalunya, Spain), with the aircraft ascending from 1,504 ft asl to 34,849 ft asl - an increase of 33,346 ft - over 18 minutes while covering 116 nm.
Level cruise began 1 mile east of Venerque (Occitanie, France) and continued for 48 minutes, during which 365 nm were flown.
Descent was initiated over Pleguien (Bretagne, France), descending from 34,499 ft asl to 1,833 ft asl - a loss of 32,666 ft - in 30 minutes and traversing 178 nm.
The final approach to runway 09 at EGGD Bristol Airport was conducted from the west, on a heading of 111.0° at 3 nm and 1,208 ft agl.
Landing on runway 09, which is 2,008 m long, occurred with a threshold speed of 136 kt. Touchdown was recorded 354 m beyond the touchdown zone at a speed of 126 kt, with a firm touchdown rate of minus 363 fpm and a lateral deviation of 8.5 m from the centreline. Local weather reported a temperature of 30 °C, wind 12 kt from 140°, a crosswind of 9 kt and a headwind component of 7 kt. The total landing distance was 1,521 m, representing 76 % of the runway.
Runway rollout alignment was noted to be slightly off centreline by 7.9 m.
Taxi-in to the parking area from the runway required less than 1 minute and covered less than 1 nm.
In total, the flight covered 666 nm, took 104 minutes, and consumed 4,330 kg of fuel.
The final approach to runway 09 at EGGD Bristol Airport was flown from the west on a heading of 111.0° at 3 nm and 1,208 ft agl. Local weather was 30 °C with wind 12 kt from 140°, giving a 9 kt cross-wind component and a 7 kt head-wind component. The approach speed was maintained at the good threshold speed of 136 kt.
Threshold height was reported as good and the threshold speed of 136 kt remained within limits during the flare, providing a stable transition to the landing phase.
Touchdown occurred 354 m beyond the touchdown zone with a good touchdown speed of 126 kt. The touchdown rate was firm at minus 363 fpm and the runway touchdown position was misaligned by 8.5 m from the centreline. Total landing distance was 1,521 m, representing 76 % of the runway length.
Rollout alignment was slightly misaligned, the aircraft deviating 7.9 m from the centreline during the rollout.
Refine lateral alignment to reduce the 8.5 m touchdown offset and keep the aircraft centred through rollout, aiming for a touchdown point nearer the 300 m aim point. The 89.9 % score indicates overall competence; these adjustments will tighten the final landing precision.
Scroll or drag the slider to zoom · double-click to reset · hover for values