MY FS FLIGHTS
Flight Score
Departure
Roll the wings level with aileron and hold bank within limits as you establish the climb.
What happened: Bank increased to 2.6° during the initial climb, and wings stayed over-banked at 9.3° into the next climb segment.
Watch for: Attitude indicator bank angle, aiming to keep it near wings-level
Arrival
Keep increasing back pressure smoothly after the sink arrests at 0.1 ft, holding that attitude firmly all the way to touchdown.
What happened: The flare arrested the sink at 0.1 ft, but 194 fpm of sink came back before touchdown, and sink returning like this usually carries through into a bounce at touchdown.
Watch for: Vertical speed indicator: steady, continuously decreasing sink held through the flare and into touchdown.
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 18 stages, 16 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with six checks, where the approach path is 1,000 ft and 500 ft above the runway.
At the 1,000 ft gate: sink rate above what the glideslope needed.
The approach, gate by gate
Side view — the last 5,000 ft of the approach.
Plan view — the first 5,000 ft of the 8,361 ft runway, to the same scale as the side view.
The 1,497 ft touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The flight began with a taxiing period from the parking area to the runway, which took 9 minutes and covered a distance of 2 nautical miles. The aircraft then departed from runway 24 at Shannon Airport (EINN), located in Munster, Ireland. The takeoff distance was 3,758 feet, which accounted for 38% of the runway. The aircraft lifted off at a speed of 142 knots.
The local weather conditions at the time of departure were characterized by a temperature of 65°F and a wind speed of 25 knots from a direction of 129°. This resulted in a crosswind of 24 knots and a tailwind of 5 knots. The aircraft then began its enroute climb, starting 1 mile southwest of Shannon Airport and ascending from an altitude of 752 feet above sea level to 37,071 feet above sea level, an increase of 36,319 feet in 17 minutes and covering a distance of 108 nautical miles.
Following the enroute climb, the aircraft entered a level cruise phase, which started 1 mile south of Naul, located in Leinster, Ireland. This phase lasted for 50 minutes and covered a distance of 1,778 nautical miles. The aircraft then began its enroute descent, starting 14 miles east of Bolshoye Boldino Airport (UWGB), located in Nizhny Novgorod Oblast, Russia. The descent took 26 minutes and covered a distance of 181 nautical miles, during which the aircraft descended from an altitude of 37,777 feet above sea level to 1,829 feet above sea level, a decrease of 35,947 feet.
The final approach to runway 23 at Kurumoch International Airport (UWWW) was made from the north-east, with a heading of 241.0° at an altitude of 4 nautical miles and 1,386 feet above ground level. The landing was executed on runway 23, which had a length of 8,361 feet. The threshold height was good, and the threshold speed was also satisfactory at 125 knots. The touchdown distance was 1,501 feet, which was within the acceptable range. However, the touchdown speed of 116 knots was slightly faster than desired. The touchdown rate was perfect at 21 feet per minute.
The runway touchdown position was slightly misaligned from the centerline by 13 feet. The local weather conditions at the time of landing were characterized by a temperature of 77°F and a wind speed of 9 knots from a direction of 230°, resulting in a crosswind of 2 knots and a headwind of 9 knots. The total landing distance was 3,684 feet, which accounted for 44% of the runway. The runway rollout alignment was very good.
The taxiing period from the runway to the parking area took 3 minutes and covered a distance of less than 1 nautical mile. The total flight distance was 2,076 nautical miles, and the flight duration was 107 minutes. The aircraft used a total of 8,579 pounds of fuel during the flight.
Aircraft C750 successfully landed at Kurumoch International Airport, achieving a high score of 98.6%. The final approach was conducted from the north-east, heading 241.0° at a distance of 4 nautical miles and an altitude of 1,386 feet above ground level (agl). The aircraft then landed on runway 23, which has a length of 8,361 feet.
The threshold height was satisfactory, and the threshold speed of 125 knots was also within the acceptable range. The touchdown distance of 1,501 feet was within the expected parameters. However, the touchdown speed of 116 knots was slightly higher than the ideal speed, indicating that the pilot may have been able to flare the aircraft more effectively to achieve a smoother touchdown.
The touchdown rate of 21 feet per minute (fpm) was perfect, demonstrating excellent control and precision on the part of the pilot. Unfortunately, the runway touchdown position was slightly misaligned by 13 feet from the centreline, which may have been due to a slight deviation in the approach or a minor issue with the aircraft's navigation system.
The local weather conditions at the time of the landing were favorable, with a temperature of 77°F and a wind speed of 9 knots from 230°. The crosswind component was minimal at 2 knots, while the headwind component was 9 knots, which helped to reduce the landing distance.
The total landing distance of 3,684 feet was 44% of the runway length, which is a relatively short distance considering the aircraft's size and weight. The runway rollout alignment was very good, indicating that the pilot maintained control of the aircraft during the rollout phase and was able to bring it to a stop safely and efficiently.
Overall, the landing was successful, and the pilot demonstrated excellent skills and control throughout the approach and landing phases. However, there is room for improvement in terms of touchdown speed and runway alignment.
Scroll or drag the slider to zoom · double-click to reset · hover for values