Events
MY FS FLIGHTS
Flight Score
Departure
Level the wings with coordinated aileron to hold bank angle near zero during the initial climb, starting from 4.6°.
What happened: Bank angle was elevated during the initial climb and excess bank usually persists into the second climb segment.
Watch for: Attitude indicator, wings level with bank angle near zero degrees.
Arrival
Reduce power earlier on final to bleed speed back to 68 kt before crossing the threshold.
What happened: You crossed the threshold at 78 kt, 10 kt above the 68 kt target.
Watch for: Airspeed, targeting 68 kt at the threshold.
See Arrival Landing
The rudder input is a changing profile through the roll rather than one that is held. So the demand on your right foot starts large at power application, eases as speed builds and the rudder gains authority, then jumps again at rotation.
Read more in Improve Your Take-OffsStart to finish · 9 stages, 8 scored
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,737 m runway, to the same scale as the side view.
The 357 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departure from Glasgow Prestwick Airport (EGPK) commenced with a roll on runway 21, utilizing 65% of the available length to achieve liftoff. The Britten Norman Trislander BN2 required a takeoff distance of 1,186 meters to clear the obstacles, lifting off at a speed of 82 knots. Under local weather conditions of 16°C and a negligible headwind, the aircraft transitioned smoothly into the enroute climb phase.
As the aircraft climbed from 182 feet above sea level to 151 feet, a net increase of 30 feet was achieved within a minute, covering a distance of 2 nautical miles. This phase of the flight was characterized by a steady ascent, with the aircraft maintaining a consistent rate of climb. Upon reaching the desired altitude, the aircraft began its descent towards runway 30 at EGPK, approaching from the southeast at a heading of 303.0 degrees. The final approach was executed at an altitude of 98 feet above ground level, with the aircraft maintaining a steady state until touchdown.
The landing on runway 30 was executed within the available length of 2,737 meters, with a touchdown distance of 356 meters. Although the touchdown speed of 63 knots was slightly above the optimal value, the touchdown rate of -49 feet per minute was perfect, and the runway touchdown alignment was spot on. The total landing distance of 623 meters, accounting for 23% of the runway length, was satisfactory. Following touchdown, the aircraft rolled out in perfect alignment, utilizing a total of 3 nautical miles of distance and consuming 17 kilograms of fuel during the flight.
The final approach to runway 30 at EGPK Glasgow Prestwick Airport from the south east was executed with precision, with the aircraft maintaining a heading of 303.0° at 0 nm and 98 ft above ground level. The approach quality was excellent, with a good threshold height achieved. However, the threshold speed was slightly above the desired level, reaching 79 kt.
As the aircraft touched down on the runway, the touchdown distance was satisfactory at 356 m, but the touchdown speed was a little fast at 63 kt. Nevertheless, the touchdown rate was perfect at -49 fpm, indicating a smooth and controlled descent. The runway touchdown alignment was spot on, with the aircraft perfectly centered on the runway. The local weather conditions, with a temperature of 20 °C and a gentle wind of 3 kt at 221°, contributed to a stable and predictable approach.
The total landing distance of 623 m, which accounted for 23% of the runway length, was within acceptable limits. The runway rollout alignment was also perfect, with the aircraft maintaining its centerline alignment throughout the rollout phase. Overall, the landing was executed with high precision and control, resulting in a score of 99.9%.
Scroll or drag the slider to zoom · double-click to reset · hover for values